$120.5B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
Anthropic's filed ceiling, drawn at face: it agreed to spend 'up to $120.5 billion' over terms into 2029. Once initial non-cancelable periods end in Jan and Mar 2027, either side may cancel on 90 days' notice, so past them it is potential money, not a commitment.
$90B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
No value is disclosed anywhere: 6 GW at ~$15B per GW ≈ $90B, the same basis as OpenAI's AMD deal, between the $60B (Reuters) and >$100B (WSJ) estimates.
Venture firms, sovereign funds and strategic investors with no entry of their own put $83–98B into Anthropic's funding rounds through May 2026 (Epoch AI's funding data); drawn at the low end, since Microsoft's and Nvidia's part of the Series G is undisclosed.
$70B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
Letters of intent only, no purchase filed: SK Telecom's Nvidia AI factory of up to 2 GW × ~$35B of chips per GW (Fortune) ≈ $70B at that ceiling — over twice the ~$15B per GW drawn for AMD's deals, an estimate for AMD's chips. Nvidia puts its Vera Rubin revenue at ~$40B per GW.
No party gives a price: the FT reported in May 2025 that Oracle would spend about $40B on ~400,000 GB200s for Abilene; one research group's per-GPU arithmetic puts them nearer $20B. Neither company has confirmed a figure.
TSMC makes and packages Nvidia's chips: Nvidia books about 59% of TSMC's CoWoS packaging (Epoch AI, May 2026). No contract value is disclosed, so the width is our magnitude.
SK hynix, the largest HBM maker (62% of 2Q25 shipments), supplies the memory on Nvidia's chips; their 2026 letters of intent add future HBM4 purchases with no figure. The width is our magnitude.
Broadcom's two 2025 orders from Anthropic, $10B + $11B. Ghosted: since recast as a chip sale, what Broadcom books is undisclosed. Anthropic's S-1/A files ~$161.2B of rent on its Broadcom leases but splits it by no lessor, lease or gigawatt, so none of it is drawn.
Rent is redacted in every filed lease: SB Energy's filing puts ~$430B on 8.8 GW of signed leases, and PORTS-Pike is 8.0 GW of them → ~$390B over 20 years, if rent per MW is uniform.
$18B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
What Meta pays under the power contracts is not filed; the width is roughly the filed cost of what they pay for: about $18B of new gas plants and power lines in Entergy's filings.
Venture firms, sovereign funds and strategic investors with no entry of their own put up to ~$17.5B into OpenAI's rounds from 2019 to 2025 (Epoch AI's funding data). The 2026 round is not drawn: only Amazon's and SoftBank's legs are on record as paid, each on its own ribbon.
$17B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
AMD's price is not disclosed: Anthropic's S-1/A expects over $20.0B of spending on the first batch, through manufacturers and service providers, not AMD's revenue. Drawn at the low end of analysts' $17–27.2B for AMD's revenue on the 2 GW.
The $15B is the joint venture's announced size for the whole Abilene campus, construction loans included; no party says how much of it is Blue Owl's own money. The only filed equity total is the first two buildings' $926.8M.
TSMC makes Google's TPU chips, like nearly every advanced AI chip; no contract is disclosed. The width is the full value of TPUs delivered in 2025 (Epoch AI), an upper bound: TSMC's cut is a fraction.
ASML is the only maker of EUV machines, which print the finest chip features, and TSMC makes nearly every advanced AI chip. No purchase value is disclosed, so the width is our magnitude.
The filing discloses a rate, not a total: $920M a month from Oct 2026 to Jun 2029 × 33 months ≈ $30B, cancellable on 90 days' notice after Dec 31 2026.
MGX is named among the investors in xAI's Series C (Dec 2024) and Series E (Jan 2026) rounds (Epoch AI's funding data), and xAI has been part of SpaceX since February 2026; neither round says how much MGX put in, so the width is our magnitude.
Micron says it is in high-volume HBM4 production for Nvidia's Vera Rubin (June 2026), but estimates run from none of Rubin's HBM to low-20s% of the HBM4 market. No value is disclosed; the width is about a third of SK hynix's, by 2Q25 HBM shipment shares (21% vs 62%).
Press reports only: the $6B license fee in Poolside's investor letter, as Newcomer and the WSJ read it, with Bloomberg's sources giving the same $6B (Bloomberg credits Newcomer with first reporting it). Neither company has published it, and no Nvidia filing names Poolside.
· not drawn above: the money runs from Nvidia back up the chain to Poolside; the chart draws money running back only into a cloud, a neocloud or a data center (as their customer or tenant)
$4.5B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
No contract value is public. The width adds two figures NiSource gives for what it plans to add to serve the deal (our sum): ~$2.3B for two gas turbines with their transmission and infrastructure, and ~$2.2B it expects to pay over ~20.5 years to rent a battery ≈ $4.5B.
TSMC makes Amazon's Trainium chips; no contract is disclosed. The width is the full value of Trainium chips delivered in 2025 (Epoch AI), an upper bound: TSMC's cut is a fraction.
Drawn at SoftBank Group's announced $3B a year, since it stated no term. Not a paid figure: SoftBank says the full $3B was not incurred in its year to March 2026, and no document settles whether it pays OpenAI or their Japanese venture.
$2.4B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
What Google pays is redacted. The width adds two filed costs Entergy says Google's rates are built to cover (our sum): the Cypress solar plant with batteries, $1.8B with construction financing, and the two new batteries' $550.6M ≈ $2.4B — before the transmission and the PPA.
No party states the equity. Blackstone's own earnings presentation names 'a BREP investment', from its real-estate fund family, in the venture without an amount; Bloomberg's sources put Blackstone's share at about $2B, a figure others read as both sponsors' equity together.
Reflection told TechCrunch it pays $150M a month from Jul 2026 through 2029; 42 months of that is the reported 'up to $6.3 billion', a ceiling either side can end on 90 days' notice after three months, which no party document states.
Hut 8's 10-Q files $19.6B as the base value of two leases but names no tenant; Nvidia is on this ribbon only by FT and WSJ reporting, which Nvidia has not confirmed.
No price, minimum bill or total is public. The width is the county development authority's tax model of the campus's power bill: 1.9 billion kWh a month at its estimated 6¢ per kWh, about $1.37B a year once built, for 25 years, the first three at ¼, ½ and ¾ of that ≈ $32B.
Generac's own expectation, not a stated commitment: its 8-K says first deliveries are 'expected to total $2.4 billion in 2027 and 2028', and the floor of firm orders beside it is redacted. Drawn as an average over those two years; Generac gives no split by year.
The power price is not disclosed; the width is Talen's own ~$18B projection of the contract's revenue (its decks state it on two different bases), not a committed sum.
Galaxy's own 'more than $15 billion' of contracted rent across the three Helios leases, stated only on its website; its filings give a figure for the first lease alone, $4.68B still to come at Sep 30 2026.
$0.955B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
Up to $955M of GlobalFoundries' existing CHIPS award, moved to silicon photonics, SiGe and packaging without raising the award's total; it is to be paid toward GF's spending from 2027, so it is drawn as money not yet paid.
Core Scientific's '>$14B' of potential revenue over 15 years, stated only in a press release, covers both tenants (AMD and an unnamed neocloud); AMD's own share is not disclosed.
ChronoScale’s 10-Q gives $2.7B of contracted revenue, over three-year terms, for GPU services agreements with two customers signed in the quarter Microsoft’s was. It names neither and splits nothing, so Microsoft’s share is an undisclosed part of it.
No price is disclosed; Bloomberg's pre-deal '$1 billion or more' is a floor from unnamed sources. The width is 890 MW for 20 years at ~$110/MWh — the rate drawn for Microsoft's Three Mile Island restart, borrowed — ≈ $17B; the 15-year, 2,700 MW agreement is left out.
No price is disclosed. The width is 1,200 MW for 20 years at ~$75/MWh, the low end of analysts' estimates for this deal ($75–$120; half worked back from Vistra's own cash-flow forecasts, the rest showing no working) ≈ $16B; at $120 it would be ≈ $25B.
$0.77B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
No contract value is public; Google's rates are confidential. The width adds two filed costs its payments are set to cover (our sum): the $737.3M Monrovia Project — batteries, solar and grid upgrades — and the $32.3M it prepays to connect its site ≈ $0.77B.
No price is disclosed: our arithmetic, 1,121 MW every hour for 20 years at ~$70/MWh, the low end of outside estimates for this deal ($70–90) ≈ $14B gross. Constellation calls it a virtual PPA; if it settles financially, this width would overstate what Meta pays.
No price is disclosed and the record has no estimate for this plant: 690 MW for 20 years at ~$110/MWh — the rate drawn for Microsoft's Three Mile Island restart, borrowed — ≈ $13B. About 500 MW of it is output the plant already makes; 190 MW is new.
No price is disclosed and the record has no estimate for this plant: the low end of Google's contested share, ~565 MW, for 25 years at ~$110/MWh — the rate drawn for Microsoft's Three Mile Island restart, borrowed — ≈ $14B, if the plant runs that long; its licence ends in 2034.
$0.5B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
Neither company's announcement gives a value, price or term. The width is the floor Quaise gave the press, 'more than $500 million', drawn whole because no party states the years it is paid over.
No total is filed. The width adds the contracts' own numbers: the minimum monthly charge at full ramp ($19.03M) for the 207 months to Feb 2045 ≈ $3.9B, plus DTE's ~$3.9B estimate of the battery charges ≈ $7.8B — before energy bills and the batteries' market credits.
No document gives the rent in dollars. BXDC's 7.0% cap rate is the first year's base rent over the $5.0B value, so about $350M to start; rising 2.75% a year, the 12-year weighted-average initial term comes to about $4.9B. Our arithmetic, on rounded inputs.
Cipher's own ~$5.5B over the lease's first 15 years, stated only in its releases and slides; its annual and quarterly reports give no dollar figure for the lease, and no Amazon document in the record states one.
CleanSpark's own ~$6.6B over the lease's first 20 years, stated only in its releases, slides and calls; the filed parts of its 8-Ks, its 10-Q and the bond indenture give no dollar figure for the lease.
No price or contract value is public. The width is our difference of Fervo's own backlog: ~$11.9B at Sep 30 less ~$7.2B at Jun 30 ≈ $4.7B — the quarter this 396 MW PPA was its only addition (1,054 − 658 MW) — over the 15-year term.
$0.22B paid over years at a rate no record gives · drawn at its full amount
estimated, deal sourced
Cohere's own figure: 'a landmark C$309 million GPU cloud partnership with Bell AI Fabric', about US$0.22B at 1.3993 Canadian dollars to the US dollar. Cohere gives no term and names no BUZZ; whether it is the money behind HIVE's contract, no document says.
No price is public. The width stands in with the ~$4B AEP plans to invest in the plant whose power Google buys for 20 years — not Google's payments, which would also have to cover the plant's gas, its running costs and AEP's return.
Neither side publishes the rent. The width is our arithmetic: Anthropic's 20-year leases at TeraWulf and Riot run about $40–48M per MW, so 95 MW is roughly $4B over 20 years. A comparison, not a figure from this lease.
KT files the commitment in won only: ₩1,365 billion. At the Fed's daily rates since its term began (₩1,322–1,556 to the dollar) that is $0.88–1.03B; drawn at about $1B.
No contract value is public. The width adds two Black Hills figures through 2048 (our sum): the $1.8B it invests in generation, which the contracts repay in full, and ~$2.4B of unlevered free cash flow after it ≈ $4.2B — before the fuel and operating costs Google also bears.
No total is filed. The width is the minimum bill alone, at today's rates: about $165.1M a year for the ~19 years from full load to the term's expected end ≈ $3.1B — before energy bills and the cost of the renewables and storage Google pays for, which is not public.
No total is filed. The width is the minimum bill alone at the petition's sample rate: 75% of demand charges on 780 MW at $22.84 per kW-month ≈ $160M a year × 15 years ≈ $2.4B — before energy, riders and the charge for the 1,900 MW of clean energy, whose cost is redacted.
Neither company files the rent or a total. The width is the lowest estimate on file, an analyst's ~$1.25B over the 12-year term, read out on AIB's call; AIB's own deck implies ~$1.32B, a figure it first worked out before the lease was signed.
No total is filed: Google's demand and term are redacted. The width is the Commission staff's hypothetical ~$79M a year of demand charges, for 10 years ≈ $0.8B before energy and fuel — the 10 being HB 2992's minimum term, which the proposed findings say the ESAs meet.
HIVE's ~$225M over three years ($220M for GPU compute, the rest connectivity and storage), stated only in releases it furnishes to the SEC and its deck, never filed. HIVE's November deck names Bell as the paying party; Bell's own documents give no value.
No filing values the 35 MW lease, and its rent line is redacted. Width is our arithmetic: the $145 per kW a month its definitions name, on 35 MW, rising 3% a year for 15 years, ≈ $1.1B. The landlord's 'up to $2.8 billion' counts 85 MW, 50 of them on conditions.
No contract value is stated. The width is the PPA's own numbers: $107/MWh on the first year's supply amount, 437,623 MWh, for the 15 contract years after the build-out ≈ $0.7B — about 50 MW, the contract's floor. At its 150 MW ceiling it would be about three times that.
What Google pays NV Energy is in filings the record could not read. Ormat and Google say the tariff has Google cover the cost, so the width is the cost it takes on: the PPA's $107/MWh on its first year's 437,623 MWh, for 15 years ≈ $0.7B.
KT's Mar 2026 bond prospectus gives the whole US$450M a 15-year supply period; its Sep 2024 filing gives the 15 years to the data centers and the network part none. Drawn over 15 years, ≈ $30M a year — an average no filing schedules, and KT says the amount may change.
Drawn at the $20M convertible note, the one Amazon investment X-energy's filings put a figure on: a floor, not Amazon's total. Amazon's own pages say '$500 million'; X-energy's release and Amazon's 2024 report give about $500 million as the round's size; it closed at $700M.