Riot–Anthropic, Rockdale TX

Anthropic is renting a 191 data center that Riot is building in Texas — about $9.1B of rent over 20 years, up to $16.1B with extensions.

A deal between Anthropic, Riot Platforms

Why it matters

Riot's Q3 10-Q names Anthropic as the Rockdale tenant, while the long-term financing remains unresolved. The $573M bridge matures Dec 31 2026, a year before first rent. Riot expects to refinance with project debt tied to a 'high investment grade' it is still finalizing, with no assurance the financing will arrive in time and no disclosure of the backstop's provider or coverage.

Tap a figure for the line in its source.

Anthropic gives Riot Platforms

  • of rent over the 20-year lease; up to $16.1B with two 5-year extensions

Riot Platforms gives Anthropic

  • of data-center capacity at Rockdale, Texas, from Dec 2027 to Jun 2028, with operations and maintenance services

Aug 10, 2026 announced by Riot; Bloomberg named Anthropicupdated Nov 21, 2026signed Aug 2026 disclosed by the parties

What happened

In August 2026, Riot Platforms signed a 20-year lease with Anthropic for 191 megawatts of computing load at its Rockdale campus. Riot is a bitcoin miner converting its Texas sites into AI data centers. The lease provides about $9.1 billion in rent over the first 20 years. Rent could reach up to $16.1 billion if Anthropic takes both five-year extensions. Riot initially described the tenant only as 'one of the world's leading frontier AI labs'. Bloomberg reported it was Anthropic. The machine-readable tags in Riot's August quarterly filing read 'LeaseAgreementWithAnthropicPbc'. Riot's November quarterly filing names Anthropic PBC in the text. The first 96 megawatts are due in December 2027 and the rest by June 2028. Riot also provides operations and maintenance. The tenant pays for power at pass-through rates, which reflect the cost Riot pays. Riot borrowed up to $573 million from Morgan Stanley to buy equipment that takes a long time to get. Riot had drawn $20.8 million on that short-term loan by September 30. The loan comes due on December 31, 2026. Riot expects to repay it with longer-term project debt. It ties that refinancing to a 'high investment grade' credit that it is still finalizing. The backstop's provider is unnamed, and Riot's documents do not say what it covers.

Sources 12 documents — 9 SEC filings · 2 press reports · 1 transcript

Research trail Found 281 documents and read 266 of them while checking this deal and related ones.

  1. SEC filingsec.gov
    States 9 figures: tenant identity · 191 MW tenant as stated · 191 MW contracted capacity · lease term · 96 MW delivery · power pass through · $573M interim financing · facility non recourse · $20.8M facility drawn
  2. SEC filingsec.gov
    States 3 figures: construction progress · $361M NOI estimate · $11–12M project capex
  3. SEC filingsec.gov
    States 3 figures: 2.75% facility terms · facility maturity · facility backstop agreement
  4. SEC filingsec.gov
    States 2 figures: $9.1B initial term revenue · $16.1B extended term value
  5. SEC filingsec.gov
    States tenant identity XBRL
  6. SEC filingsec.gov
    States $180M financing plan
  7. SEC filingsec.gov
    States $38B portfolio total
  8. SEC filingsec.gov
    States lease not filed
  9. Yahoo Finance · press reportfinance.yahoo.com
    States $9.1B press identification
  10. Investing.com · transcript (archived copy)investing.com
    States CFO on takeout
  11. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  12. press report (archived copy)datacenterdynamics.com
    Cited by the record; no single figure is quoted from it.

The record's own summary of its sourcing: Riot 8-K Item 8.01 + ex-99.1 + ex-99.2 (2026-08-10), Q2-2026 10-Q (prose + inline XBRL), 8-K Items 1.01/2.03 (2026-08-14), Q2-2026 call (Wayback of investing.com); Bloomberg via Yahoo (Aug 10) and DCD via Wayback for the press name (read 2026-09); Riot Q3-2026 10-Q (Notes 1, 3 and 11, MD&A, Ex. 10.1 — the $573M Credit Agreement) and 8-K ex-99.1/ex-99.2 (Q3 release and deck, furnished), all 2026-11-04 (updated 2026-11) · as of Nov 2026

The evidence 23 sourced figures · 1 dispute

The record's headline Riot–Anthropic, Rockdale TX: 20-year lease for 191 of critical IT, ~$9.1B initial term (~$16.1B with options) — 'a leading frontier AI lab' in Riot's August prose, Anthropic PBC in its Q3 10-Q; a $573M bridge loan due Dec 31 2026 while its 'high investment grade' credit is still 'being finalized'

Size
$9.1B initial term (~$16.1B with both options) · 191 MW critical IT
When
Aug 2026 → 96 MW Dec 2027 → 191 MW Jun 2028; 20-year term through Jun 2048 + 2 × 5-yr options
Status
signed Aug 2026 (announced Aug 10) — under construction (Nov 4 deck: general contractor mobilized, sitework and excavation under way); lease not filed; the $573M credit agreement filed with the Q3-2026 10-Q (Ex. 10.1, redacted); 'high investment grade' credit backstop 'being finalized', provider unnamed
Structure
direct 20-year 'Data Center Lease and Services Agreement', build-to-suit Tier 3 halls at the landlord's existing, fully approved Rockdale interconnection; rent = 'base rent' commencing on full deployment (10-Q) / 'initial deployment and rent commencement' Dec 2027 (deck); two 5-year extension options at the tenant's election; Riot also provides operations and maintenance services, and power is passed through to the tenant 'at pass-through rates' (Q3 10-Q); landlord build financed by a $573M Morgan Stanley delayed-draw bridge at a project subsidiary (non-recourse to the parent; due Dec 31 2026; advanced against long-lead equipment costs that a party the filed agreement redacts must reimburse under a 'Backstop Agreement'), to be taken out by project debt, which Riot ties to a 'high investment grade' credit backstop still being finalized — provider unnamed, coverage unstated
Programme
Anthropic direct leases
Parties
Anthropic tenant — 'a leading frontier AI lab' in Riot's August prose, 'Anthropic PBC' in the XBRL member Riot attached to the same lease facts and, from the Q3 10-Q (Nov 4), in Riot's prose as the 'Frontier AI Lab' of this lease; 'people familiar' to Bloomberg; its own S-1 and S-1/A do not name Riot · Riot Platforms landlord and developer via Riot DC Logistics LLC (borrower) and RPI AUS01-0H DC LLC; the AMD landlord at the same campus (the AMD leases, not a record here)
Record
disclosed / primary source · as of Nov 2026

Flows 2 as the record states them

  • Anthropic → Riot Platformslease-payments~$9.1B 'total initial contract revenue' over the 20-year initial term (release, filed via Item 8.01) = 'approximately $9.1 billion in base rent over the initial term' (the earlier 10-Q); up to ~$16.1B if both 5-year options are exercised. Rent per MW and escalators unfiled; Riot's own estimate, restated in its Q3 deck: average annual revenue $451M and NOI $361–406M (80–90% margin; the Aug-10 release said $7.3–8.2B cumulative, $365–411M a year). Nothing payable before the Dec-2027 initial deployment
  • Riot Platforms → Anthropiccapacity191 MW of critical IT in build-to-suit Tier 3 halls at Rockdale: 96 MW Dec 2027 + 95 MW Jun 2028, with operations and maintenance services and power at pass-through rates (Q3 10-Q); 'Tenant BoD incorporated to reduce design timelines' (deck) — the tenant's basis of design, built by the landlord's ESS Metron / E4A units

Resolved figures 23 each with the verbatim line from its document

  • tenant-identity
    Anthropic PBC — now in Riot's OWN filed prose, not only its data layer or the press. The Q3-2026 10-Q (filed Nov 4 2026) defines 'Anthropic PBC (the “Frontier AI Lab”)' as the tenant of the new Corsicana lease — the one place the 10-Q says the name — and uses the same defined term for the tenant of the Rockdale Lease (tenant-as-stated); the Q3 release, deck and credit agreement never say the name, but the release speaks of 'the lease signed with the same Frontier AI Lab at Rockdale earlier this year' (portfolio-total). Before Nov 4 the name rested on the Q2 10-Q's inline-XBRL member alone (tenant-identity-xbrl) and on Bloomberg (press-identification), while Riot's August prose withheld it. The Q3 10-Q no longer carries the name in XBRL for this lease: the Rockdale facts sit under the neutral member riot:TenantLeaseMember, the Corsicana facts under riot:FrontierAiLabLeaseMember. Anthropic's own S-1 (Oct 26) and S-1/A (Nov 2) do not name Riot
    “entered into a long-term powered land lease agreement (the “Corsicana Lease”) with Anthropic PBC (the “Frontier AI Lab”) to provide critical IT load capacity at the Company’s Corsicana Facility.”
    Riot Q3-2026 10-Q, Note 1 — Organization · sec.gov
  • tenant-identity-xbrl
    the first evidence of the name, and still Riot's: the Q2-2026 10-Q tags every Tenant-Lease fact (191 MW initial deployment, 96 MW forecast, 20-year term, two five-year renewals, $9.1B expected revenue) to a registrant-defined inline-XBRL member, riot:LeaseAgreementWithAnthropicPbcMember, under us-gaap:SubsequentEventMember for August 2026 — built exactly parallel to the named riot:LeaseAgreementWithAmdRockdaleFacilityMember: the party identifying its counterparty in the machine-readable layer while withholding it from the prose. EDGAR full-text search indexes prose only, which is why the press reports on file missed it. Superseded as the basis of the name by tenant-identity. The quote is the context id as it sits in the filing
    “us-gaap:SubsequentEventMemberriot:LeaseAgreementWithAnthropicPbcMember2026-08-012026-08-31”
    Riot Q2-2026 10-Q, inline-XBRL contexts (ix:header) · sec.gov
  • tenant-as-stated191 MW
    'the Frontier AI Lab' — the Q3 10-Q's defined term for the Rockdale tenant, in the same Note 1 that defines the term as Anthropic PBC for the Corsicana lease (tenant-identity). Until then Riot's prose said only 'a leading frontier AI lab, (the “Tenant”)' (Q2 10-Q Notes 1 and 3), 'one of the world's leading frontier AI labs' (the Aug-10 release and deck) and, on the Q2 call, 'AMD and now a leading frontier AI lab' — management never said the name, nor did Riot's own deal counsel Foley & Lardner. Anthropic itself has confirmed nothing; its S-1 and S-1/A do not name Riot
    “and with the Frontier AI Lab for the deployment of 191 MW of critical IT load capacity (the “Rockdale Lease”).”
    Riot Q3-2026 10-Q, Note 1 — Organization · sec.gov
  • press-identification$9.1B
    Bloomberg (Shirin Ghaffary, Aug 10 2026, 'people familiar with the matter') named Anthropic hours after Riot's call — the single origin of every press naming (DCD, The Block, CryptoSlate, the Austin American-Statesman, globaldatacenterhub all cite it; the Statesman explicitly does not confirm independently). 'Riot declined to comment and Anthropic didn't respond' (DCD relaying Bloomberg). Corroboration of the XBRL reading, not its source; on its own it would be tier 2 with both principals declining — and now confirmed by Riot's own Q3 10-Q prose (tenant-identity)
    “(Bloomberg) -- Anthropic PBC has struck a $9.1 billion deal with Riot Platforms Inc., a Bitcoin mining company that recently began selling AI data center capacity, people familiar with the matter said, underscoring the Claude maker's efforts to secure enough computing to meet its customers' demand.”
    Bloomberg via Yahoo Finance syndication, Aug 10 2026 · finance.yahoo.com
  • contracted-capacity191 MW
    191 MW of critical IT capacity, build-to-suit Tier 3, at Riot's Rockdale campus — Riot's second tenant there after AMD (25 MW Jan 2026 → 50 MW Apr 2026) — plus 'operations and maintenance services'. The Aug-10 release and deck called it a 'Data Center Lease and Services Agreement' without saying what the 'Services' cover; the Q3 10-Q names them, and the Q3 deck's revenue average for this lease is 'incl. O&M' (noi-estimate). The Aug-10 release's lease section is incorporated by reference into Item 8.01 of the 8-K, so the 191 MW / $9.1B / $16.1B / $573M there are FILED figures, unlike the rest of the release (furnished); the Q3 10-Q restates the 191 MW
    “In August 2026, the Company entered into the Rockdale Lease to provide 191 MW of critical IT load capacity and operations and maintenance services at the Rockdale Facility.”
    Riot Q3-2026 10-Q, Note 3 — Rockdale Lease · sec.gov
  • initial-term-revenue$9.1B
    ~$9.1B 'total initial contract revenue' over the 20-year initial term running through June 2048 — the release's label; the Q2 10-Q calls the same $9.1B 'base rent over the initial term', which is the more specific accounting word (base rent excludes any services revenue). Twenty years from the Jun-2028 full-deployment commencement = Jun 2048, so the two documents agree on the clock. The Q3 10-Q does not repeat the $9.1B; its deck gives this lease an average annual revenue of $451M (noi-estimate), which over 20 years is $9.0B — our arithmetic, in line with the release; no document reconciles them. NOT $9.8B (the Q2 two-lease portfolio) or $38B (the Q3 three-lease one): see portfolio-total. Rent per MW undisclosed; monteinvestments' '$457M/yr' is $9.1B ÷ 20, not a reported figure
    “The Data Center Lease carries an initial term of 20 years, running through June 2048, and is expected to generate approximately $9.1 billion in total initial contract revenue.”
    Riot 8-K ex-99.1, lease section (filed via Item 8.01) · sec.gov
  • extended-term-value$16.1B
    ~$16.1B total potential contract value if both five-year extensions are exercised — INCLUSIVE of the $9.1B. DCD's '$16.5bn', attributed to Riot, is unreconciled secondary rounding or a misprint of Riot's own $16.1B and is not carried as a figure
    “The Data Center Lease also includes two five-year extension options at the tenant’s election, representing a total potential contract value of approximately $16.1 billion if both extensions are fully exercised.”
    Riot 8-K ex-99.1, lease section (filed via Item 8.01) · sec.gov
  • lease-term20 years
    20-year initial term 'commencing upon full deployment anticipated in June 2028' (Q3 10-Q, the Q2 10-Q's words again) — versus the Aug deck's 'Dec 2027 Initial Deployment and Rent Commencement' and 'Upon Full Deployment' footnote: rent starts with the first 96 MW, the 20-year clock with the full 191. Two successive five-year renewals at the Lab's option. The Q2 10-Q's last clause, 'expected to generate approximately $9.1 billion in base rent over the initial term', is not in the Q3 10-Q (the figure rests on the Aug-10 release, initial-term-revenue). The lease is not an exhibit to the Q3 10-Q either — the only agreement it files, Ex. 10.1, is the $573M credit agreement — nor to either August 8-K (lease-not-filed)
    “The Rockdale Lease carries an initial term of 20 years, commencing upon full deployment anticipated in June 2028, and includes provisions for two successive five-year renewal terms at the option of the Frontier AI Lab.”
    Riot Q3-2026 10-Q, Note 3 — Rockdale Lease · sec.gov
  • delivery96 MW
    96 MW in December 2027, the remaining 95 MW in June 2028 (Q3 10-Q, unchanged from the Q2 10-Q; the Q3 deck's 'RFS1 96 MW' Dec 2027 and 'RFS2 95 MW' Jun 2028; the Aug release's 'initial 96 IT MW … full 191 IT MW deployment expected by June 2028'), 'leveraging Riot's existing, fully approved interconnection' — the time-to-power argument for a converted miner: the grid connection is the ex-smelter's, already energized. The build itself: construction-progress
    “The Rockdale Lease includes an initial deployment of 96 MW of critical IT load capacity anticipated to be delivered in December 2027, with the remaining capacity anticipated to be delivered in June 2028.”
    Riot Q3-2026 10-Q, Note 3 — Rockdale Lease · sec.gov
  • power-pass-through
    power is a pass-through, in the words the Q3 10-Q also uses for AMD's lease: the Lab reimburses the power at pass-through rates, which Riot books as variable lease revenue in the period it incurs the cost — a line the 10-Q's Data Center revenue table keeps apart from operating (base-rent) lease revenue. The Q2 documents did not say. What the $9.1B does and does not include (the Aug release's 'total initial contract revenue' against the Q2 10-Q's 'base rent', and the Q3 deck's revenue average 'incl. O&M') is not settled by any filing; the lease, which would show the O&M fee and the rent per MW, is not filed
    “Under the Rockdale Lease, power will be provided to the Frontier AI Lab at pass-through rates and recognized as variable lease revenue in the same period the related expenses are incurred.”
    Riot Q3-2026 10-Q, Note 3 — Rockdale Lease · sec.gov
  • construction-progress
    the build is under way on the Nov 4 deck's own account for the 191 MW: general contractor mobilized (Aug 2026), demolition complete and sitework under way (Sep), excavation, site development and equipment orders in progress (Nov), building delivery and vertical construction from Feb 2027, fit-out from Apr 2027, ready for service Dec 2027 (96 MW) and Jun 2028 (95 MW). Riot is still 'negotiating GMP for Rockdale' — no guaranteed maximum price is stated. A landlord's own progress report in its furnished deck; it replaces the Q2 status line 'nothing built'
    “contractor mobilized and sitework/excavation underway”
    Riot Q3-2026 earnings deck, 8-K ex-99.2 (furnished) — Rockdale progress update, 191 MW · sec.gov
  • noi-estimate$361M
    Riot's own estimate of what the lease earns it, restated at Q3 (Nov 4): average annual revenue $451M and average annual NOI $361–406M over the initial term — the 80–90% NOI margin the deck footnotes for this lease — in a table whose revenue line for this lease is 'incl. O&M'. The Aug-10 release said: 'Estimated cumulative NOI range of $7.3 to $8.2 billion over the base lease term, with an estimated average annual NOI contribution of $365 to $411 million' (filed, via Item 8.01), on ~$457M/yr of revenue at the same margin; the Q3 deck gives no cumulative figure, and its average is about 1% lower. A landlord projection, stated as a range by the party — carried as the party states it, not collapsed. The Q3 deck is furnished (Item 2.02); Riot's own deck, so tier 1
    “Revenue1 $63 million $451 million $1.8 billion $2.3 billion Average Annual NOI2 $50 million $361 – 406 million $1.8 billion ~$2.2 billion”
    Riot Q3-2026 earnings deck, 8-K ex-99.2 (furnished) — portfolio table · sec.gov
  • interim-financing$573M
    $573M interim facility from Morgan Stanley, which the Q3 10-Q says is for 'the purchase of long-lead equipment and related project equipment, and certain other expenses' on this 191 MW project. The Aug-10 release (filed via Item 8.01) tied it to the missing guarantor — 'to fund initial development costs while the investment-grade credit backstop is finalized' — and the Aug deck said so in three words: 'IG-Backstop in Finalization'. The Nov-4 deck (furnished) still does: 'Finalizing high investment grade credit backstop, Morgan Stanley interim facility remains in-place in the meantime' — the backstop is now 'high investment grade' and still not signed. The takeout is the permanent project debt in financing-plan below; if the backstop never closes, the CFO said on the Q2 call there are 'multiple paths … regardless of how the credit support process concludes' — the record carries that as a party claim, unsupported by any second path on paper. What carries the build meanwhile is facility-backstop-agreement; how much of the bridge is used, facility-drawn
    “The proceeds of the $573 Million Credit Facility are intended to fund the purchase of long-lead equipment and related project equipment, and certain other expenses, associated with the Company’s 191 MW critical IT load data center project at the Rockdale Facility under the Rockdale Lease.”
    Riot Q3-2026 10-Q, Note 11 — $573 Million Credit Facility · sec.gov
  • facility-terms2.75%
    senior secured delayed-draw term loan, up to $573.0M, borrower Riot DC Logistics, LLC, administrative agent and the only lender Morgan Stanley Senior Funding (Schedule 1.1); Adjusted Term SOFR + 2.75% (or Base Rate + 1.75%), and a 0.50% undrawn fee (Q3 10-Q); guaranteed by the borrower's subsidiaries and its affiliate RPI AUS01-0H DC LLC; lien on substantially all Credit-Party assets; NO recourse to Riot Platforms, Inc. or any parent beyond the Credit Parties (customary carve-outs). Proceeds: long-lead equipment for the project the agreement's Schedule 1.3 describes as 'A 191 critical IT MW data center campus to be developed on a portion of a property consisting of approximately 199.990 acres in Milam County, Texas'. The Credit Agreement the Aug-14 8-K promised for the Q3 10-Q IS filed now — Ex. 10.1, dated Aug 10 2026, with the Backstop Agreement's counterparty and terms and some schedules redacted ('[***]') — and it settles the maturity (facility-maturity)
    ““Applicable Margin”: a rate per annum equal to (a) with respect to Loans that are Base Rate Loans, 1.75%, and (b) with respect to Loans that are SOFR Loans, 2.75%.”
    Riot Q3-2026 10-Q Ex. 10.1 — Credit Agreement (2026-08-10), definition of Applicable Margin · sec.gov
  • facility-non-recourse
    non-recourse to the parent in all three documents (Q3 10-Q: 'non-recourse to the Company and its affiliates other than the Credit Parties, subject to certain customary exceptions, including for fraud, willful misrepresentation, or misappropriation of collateral proceeds'; Q2 10-Q: 'non-recourse to Riot Platforms, Inc., subject to customary non-recourse carve-outs'; Aug-14 8-K: 'no recourse against the Company or any other direct or indirect parent of the Borrower'). Against that, the CFO on the Q2 call: the facility 'is fully secured by the tenant, so that near-term build costs come with that tenant credit support from day one'. A filing now says something of the kind: the Q3 10-Q says the Borrower's obligations 'are secured by substantially all of the assets of the Borrower, and by the Frontier AI Lab, related to the project' — a clause that does not say what the Lab provides; the mechanism, so far as the filed agreement shows it, is facility-backstop-agreement. Carried as what each party document says; not reconciled with the credit backstop still 'being finalized'
    “The $573 Million Credit Facility is non-recourse to the Company and its affiliates other than the Credit Parties, subject to certain customary exceptions, including for fraud, willful misrepresentation, or misappropriation of collateral proceeds.”
    Riot Q3-2026 10-Q, Note 11 — $573 Million Credit Facility · sec.gov
  • facility-maturity
    December 31, 2026 — the filed Credit Agreement's own definition, repeated in the Q3 10-Q (Note 11 and MD&A: 'matures on December 31, 2026') and in the Aug-14 8-K ('mature on December 31, 2026'). Until the Q3 10-Q this was a contested pair against the Q2 10-Q's 'The facility matures on October 15, 2026, subject to extension in certain circumstances in connection with the Company's re-financing of the $573 Million Credit Facility'. October 15 appears nowhere in the filed agreement or in any later Riot filing, and the agreement has no extension of its date (a non-Business Day rolls to the next one), so the dispute is closed on the primary document; why the Q2 10-Q said October 15 is not explained, and the agreement's 'Expiration Date' and 'Repayment Deadline' are defined only in the unfiled Backstop Agreement. One softener is in the agreement: failure to repay principal on the Maturity Date is not an Event of Default for 45 Business Days if Riot has delivered the Backstop Agreement items (§5.17) and has sent no Non-Reimbursement Notice to the redacted party (§7.1(a)). The date falls a year before the first rent (Dec 2027) and about eight weeks after the 10-Q, which says: 'We expect to repay the $573 Million Credit Facility with the proceeds of long-term project financing, although there can be no assurance that such financing will be received on a timely basis, on acceptable terms, or at all'
    ““Maturity Date”: December 31, 2026; provided that if such date is not a Business Day, then the Maturity Date shall be the immediately succeeding Business Day.”
    Riot Q3-2026 10-Q Ex. 10.1 — Credit Agreement (2026-08-10), definition of Maturity Date · sec.gov
  • facility-drawn$20.8M
    $20.8M of the $573.0M drawn at September 30 2026 (about 4% of the commitment, our arithmetic): $12.8M on the balance sheet, that principal less $8.0M of unamortized issuance costs (initial issuance costs $12.3M), at a variable rate of 6.49%; $4.9M of interest and issuance-cost amortization for the quarter, all capitalized into construction in progress; Riot's liquidity section puts nine months of borrowing at $8.6M of net proceeds. The bridge was nearly undrawn at September 30, three months before it falls due
    “As of September 30, 2026, $20.8 million of principal was outstanding under the $573 Million Credit Facility.”
    Riot Q3-2026 10-Q, MD&A — Liquidity and Capital Resources · sec.gov
  • facility-backstop-agreement
    what carries the build until the permanent debt: the filed Credit Agreement (Ex. 10.1 to the Q3 10-Q) is built around a 'Backstop Agreement' with a party the filing redacts ('[***]'). Each loan is advanced against an 'Expense Item Invoice' for long-lead equipment, and only once that party has told Riot the costs are 'Expense Items' for which it 'is required to make an Expense Reimbursement' (§4.2(d)); the first borrowing also needs evidence that it approved the purchase (§4.2(g)(vii)); 100% of what it pays back must prepay the loans the next Business Day (§2.11(d)); and a termination of the Proposed Lease Agreement or the Backstop Agreement without its reimbursement obligations surviving is an Event of Default (§7.1(m)). The agreement also defines a 'Purchase Option' — Riot's option to keep the equipment for its own benefit. The Q3 10-Q's one clause on security says the obligations are secured 'by substantially all of the assets of the Borrower, and by the Frontier AI Lab, related to the project'. So the filings point at the tenant standing behind the build COSTS, but neither says so in terms (the party is redacted; the 10-Q's clause names no instrument), the Backstop Agreement itself is not filed, and neither describes the 'high investment grade' credit backstop that the Q3 deck still calls 'being finalized' (credit-support-provider)
    “Backstop Agreement Events. No later than the Business Day following any Expense Reimbursement Payment Date or any other date of payment from [***] under the Backstop Agreement, the Borrower shall prepay Loans of each Lender using 100% of the Net Cash Proceeds of the applicable Expense Reimbursement received, directly or indirectly, from [***].”
    Riot Q3-2026 10-Q Ex. 10.1 — Credit Agreement (2026-08-10), §2.11(d) · sec.gov
  • cfo-on-takeout
    the landlord's financing plan in the CFO's words (Jason Chung, Aug 10): interim facility now, 'the takeout financing of this interim facility in the coming months as the investment grade backstop is completed', 'pricing consistent with the growing number of backstop AI infrastructure deals we have seen in the market', 'diligence is well advanced', and the hedge quoted here. Management never names the tenant or the backstop provider on the call. The origin page (investing.com) 403s the crawler; the Aug-23 Wayback snapshot is the citable copy
    “This lease has been structured with financing in mind from day one, and we have multiple paths to attractive long-term financing regardless of how the credit support process concludes.”
    Riot Q2-2026 earnings call, CFO prepared remarks (investing.com transcript, Wayback 2026-08-23) · web.archive.org
  • project-capex$11–12M
    $2.1–2.3B illustrative capex for the 191 MW, unchanged in the Q3 deck (its funding slide: 'Rockdale $2.1–2.3B ($11–12M/IT MW on 191 IT MW)'; its portfolio table: 'Total Capital Expenditures' $2.1 – 2.3 billion for this lease) — as in August ('$11.0-12.0M / IT MW' in the Aug deck; 'between $11 million and $12 million per IT megawatt' on the Q2 call, which 'excludes tenant fit out costs'). A party range by construction, not a dispute, and the denominator behind the 80–90% NOI margin. Compare TeraWulf's $10–12M/MW at Hawesville and its $9.1M/MW actual at Lake Mariner: the converted-miner build cost is converging on the same band. The Q3 deck is furnished (Item 2.02), Riot's own; the Q2 call transcript the entry cited before is Wayback-only
    “Rockdale $2.1–2.3B ($11–12M/IT MW on 191 IT MW)”
    Riot Q3-2026 earnings deck, 8-K ex-99.2 (furnished) — Funding the build · sec.gov
  • financing-plan$180M
    the deck's funding waterfall for this project: expected capex $2.1–2.3B, less estimated debt at 80–90% loan-to-cost $1.7–2.1B, = equity requirement $210–460M, less an 'expected term loan from AMD $180M', = net equity required $30–280M. The $180M is a refinancing of the AMD lease's stabilized 25 MW redeployed into THIS build — AMD's money, the AMD relationship's leg (the AMD leases, not a record here), routed here as a line item because Riot routes it here; it is not Anthropic's and draws no flow. 'Avoiding any need for new equity issuance' is the pitch; the $1.7–2.1B of debt does not exist yet and is the takeout the backstop is for
    “Expected capital expenditures $2.1 – $2.3B Less: estimated debt (@80% - 90% LTC) $1.7 – $2.1B Equity requirement $210 – $460M Less: expected term loan from AMD $180M”
    Riot Q2-2026 earnings deck, 8-K ex-99.2 (furnished) — Financing Update · sec.gov
  • portfolio-total$38B
    1,151 MW and ~$38B of contracted revenue across Riot's THREE leases (Nov 4) — this one (191 MW / $9.1B), AMD (50 MW; $636M at 50 MW per Riot's Q1 deck), and the Corsicana lease signed Oct 28 with the same tenant (910 MW, 'approximately $28 billion in total contract value' per the release — its own deal, not carried here; 50 + 191 + 910 = 1,151, our arithmetic). Restated from Aug 10, when the figure was 241 MW and ~$9.8B across the first two leases. Carried as a LANDLORD figure so that neither number is read as this lease: monteinvestments and others presented the $9.8B as the Anthropic deal's value. Riot's Q3 deck: 'In 2026, Riot Has Secured $38 Billion of Contracted Data Center Revenue'. The CEO quote sits in the release, which the Nov-4 8-K furnishes under Item 2.02 (it has no Item 8.01), like the deck; the 10-Q states neither 1,151 MW nor $38B. Tier 1 all the same: Riot's own release, read from its own copy on EDGAR, as extended-term-revenue is at Hawesville
    “Together with our AMD contract and the lease signed with the same Frontier AI Lab at Rockdale earlier this year, Riot has contracted 1,151 megawatts and approximately $38 billion of data center revenue”
    Riot 8-K ex-99.1 (Q3-2026 results release), CEO quote (furnished under Item 2.02) · sec.gov
  • lease-not-filed
    how the lease reached EDGAR: not under Item 1.01 (material definitive agreement) but by Item 8.01 incorporating one section of the earnings release. The Aug-14 8-K's Item 1.01 is the credit agreement, not the lease. So there is no executed lease, redacted or otherwise, anywhere on file for either of Anthropic's direct leases — rent formula, escalators, termination and delay rights, security, any parent guaranty are unknown; the prose summaries are the ceiling. The Q3 10-Q (Nov 4) changes nothing here: its exhibit list files the $573M credit agreement (10.1) and no lease, and where it promises that Riot 'intends to file the Corsicana Lease as an exhibit to its Annual Report on Form 10-K for the fiscal year ending December 31, 2026, with certain portions omitted', it makes no such promise for this one
    “The information included in Exhibit 99.1 under the heading “191 IT MW Data Center Lease with a Leading Frontier AI Lab at Rockdale” shall be incorporated by reference into this Item 8.01 of this Report.”
    Riot 8-K Item 8.01 (filed 2026-08-10) · sec.gov

Contested figures 1 not reconciled — every position side by side, with its source and tier

credit-support-providerone entry, in its own words
unnamed — 'while the investment-grade credit backstop is finalized' (Aug release, filed), 'IG-Backstop in Finalization' (Aug deck), 'as the investment grade backstop is completed' (CFO) and, on Nov 4, 'High investment grade credit support agreement being finalized' and 'Finalizing high investment grade credit backstop, Morgan Stanley interim facility remains in-place in the meantime' (Q3 deck, furnished): the description is firmer ('high investment grade'), the agreement still unsigned. No Riot document names a provider, a size or a date for it. The filed credit agreement's separate Backstop Agreement — the redacted party that reimburses the build costs — is a different instrument (facility-backstop-agreement). At Hawesville the landlord named Google on Nov 4 (anth-terawulf-hawesville); Riot has not. The Google-by-precedent inference in the newsletters is carried as inference only Riot Aug release + decks (Aug 10, Nov 4) + Q2 call vs newsletter inference

Scope note what this record leaves to other records

NOT this record (carried elsewhere): the AMD lease at Rockdale (25 → 50 MW, 10-yr + three 5-yr options, $311.0M initial / $636M at 50 MW / ~$1.0B with extensions — three different bases for the lease value; the original ROFR on 100 MW, replaced in April 2026 by a 100 MW option, expansion to 200 MW; the $69M DDTL and ~$180M term loan) → the riot entity's note; Corsicana (400 MW developed / ~1 GW at completion; 858 vs 925 acres — sequential acquisition; the single-tenant LOI 'for the entirety of the site'; Starboard's '$9–21B' valuation letter) and Riot's Kentucky sites (1,862 MW 'available' Q3-2025 vs '1,700 MW Texas + 300 MW Kentucky' Q2-2026 — different definitions) → the riot entity, whose note now also carries the Q3 10-Q's Corsicana lease (Oct 28 2026, Anthropic PBC, 910 MW critical IT) — another deal, not yet a record of its own, none of its figures are this record's; Riot's legacy hosting litigation (SBI $20.0M settlement; GMO's >$150M + $496M claims) and the Terrestrial Energy nuclear MOU → nothing; Bitcoin-mining economics → nothing. Anthropic-wide aggregates and the TeraWulf-side Google warrants/backstops → anth-terawulf-hawesville's note and goog-anth-backstops. Not adopted: '$9.8B', which is the two-lease portfolio, not this lease (the Q3 release's '$38B' is the three-lease one); '$16.5bn' (DCD) for Riot's $16.1B; '$457M' and '$63.6M' annual figures presented as reported (straight-line division; Riot's own Q3 deck reports $451M for this lease); the $180M term loan, which is the AMD lease's, not this deal's money; measuredai's '$198/kW/month' (TCV ÷ MW ÷ months, one dollar from its TeraWulf figure because the formula is shared).

More between Anthropic and Riot Platforms

The record holds no other deal between them.

Everything between Anthropic and Riot Platforms →