Why it matters
OpenAI is the tenant, shareholder and software supplier of SoftBank-controlled SB Energy. It also holds penny that vest as it signs leases. The landlord's filings put IT load at ~753 against OpenAI's 1.2 headline, and no party says what the difference measures.
Tap a figure for the line in its source.
SB Energy gives OpenAI
- of computing load in two buildings under construction, on 15-year leases signed Jan 9 2026; OpenAI calls the site 1.2
- to buy SB Energy shares at a cent each, the first tranche vesting when the Milam leases were signed
- of OpenAI software and tools it must buy from 2026 to 2028
OpenAI gives SB Energy
- rent once the buildings are handed over; no lease value is disclosed
- of preferred equity in SB Energy's parent, matched by $500M from SoftBank
What happened
OpenAI is renting two data-center buildings that SB Energy is building in Milam County, Texas. SB Energy is SoftBank's energy and data-center company. OpenAI signed the 15-year leases in January 2026 for about 753 megawatts of computing load. OpenAI describes the site as 1.2 gigawatts. On the day the leases were signed, OpenAI and SoftBank each put $500 million into SB Energy. SB Energy gave OpenAI , which gave OpenAI the right to buy SB Energy shares for a cent each. Some of those rights took effect when the leases were signed. SB Energy also agreed to buy at least $50 million of OpenAI's software. Both buildings are under construction and due in 2027–2028. The rent has yet to be disclosed.
Sources 9 documents — 4 company releases · 2 SEC filings · 2 research notes · 1 press report
Research trail Found 728 documents and read 553 of them while checking this deal and related ones.
- States 5 figures: 753 MW leases · $500M equity · warrants · at least $50M software · foundation agreement
- States 1.5 GW softbank sites
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: SB Energy S-1 (Sep 1 2026) + S-1/A No. 2 (Sep 21 2026); OpenAI post (Jan 9 2026); OpenAI/Oracle/SoftBank joint release (Sep 23 2025); SoftBank FY2025 results deck; The Decoder (read 2026-10) · as of Sep 2026
The evidence 6 sourced figures · 1 dispute
The record's headline OpenAI–SB Energy, Milam County TX: two 15-year leases for ~753 -IT (OpenAI calls the site 1.2 ), $500M each from OpenAI and SoftBank into SB Energy, penny for OpenAI, and $50M of OpenAI software bought by the landlord
- Size
- ~753 MW-IT on two 15-yr leases (OpenAI: 1.2 GW) · $500M + $500M into SB Energy
- When
- Sep 23 2025 (site announced) → Jan 9 2026 (leases, equity, warrants) → Aug 17 2026 (warrants amended)
- Status
- leases signed Jan 9 2026; both buildings in vertical construction, notice to proceed issued Apr 2026, ready for service 2027–2028 (S-1/A); first warrant tranche vested on the leases; rent undisclosed
- Structure
- two triple-net leases (SB Energy subsidiary landlord, OpenAI affiliate tenant) under a Foundation Agreement among OpenAI, SB Energy's parent and SoftBank: OpenAI preferred equity in the landlord's parent + penny warrants vesting on leases and the IPO + the landlord's minimum purchases of OpenAI software
- Programme
- Stargate
- Parties
- OpenAI tenant (Orion DC I, LLC) + preferred investor + warrant holder + software supplier · SB Energy landlord + developer (Milam County DC, LLC) · SoftBank controls SB Energy; $500M co-investor
- Capital
- the seller's own money or backing comes back as its sales
- Record
- disclosed / primary source · as of Sep 2026
Flows 5 as the record states them
- OpenAI → SB Energylease-paymentstwo triple-net leases, ~308 + ~445 MW-IT, 15-year terms with two 10-year options; rent undisclosed
- OpenAI → SB Energyequity$500.0M of preferred equity in Energy Global, LP, SB Energy's parent (Jan 9 2026), converting to common at the IPO
- SoftBank → SB Energyequity$500M (Jan 9 2026, per OpenAI's announcement) into a company SoftBank already controls
- SB Energy → OpenAIwarrants3,991,809 warrants at $0.01 a share (amended Aug 17 2026), vesting in eight tranches tied to leases and the IPO
- SB Energy → OpenAIsoftware-spendat least $50.0M of OpenAI software and tools, 2026–2028
Resolved figures 6 each with the verbatim line from its document
- leases753 MWtwo triple-net leases signed Jan 9 2026 between Milam County DC, LLC (an SB Energy subsidiary, landlord) and Orion DC I, LLC (an OpenAI affiliate, tenant): Building 1 ~308 MW and Building 2 ~445 MW of critical IT, ~753 MW together, ~650,000 sq ft each, each lease 15 years with two 10-year extensions at the tenant's option. Notice to proceed was issued in April 2026 and SB Energy expects the buildings ready for service in 2027–2028; rent 'is structured on a yield-on-cost basis with an annual escalator', its amount undisclosed. OpenAI's own figure for the site is 1.2 GW (see contested capacity)
“Building 1 is designed for approximately 308 MW of critical IT capacity and Building 2 is designed for approximately 445 MW of critical IT capacity, for a combined total of approximately 753 MW of critical IT capacity across the Milam County campus, with each building comprising approximately 650,000 square feet.”
SB Energy S-1/A No. 2 (filed Sep 21 2026) · sec.gov - equity$500M$500.0M of preferred equity from an OpenAI affiliate in Energy Global, LP (SB Energy's parent) on Jan 9 2026, converting into common equity on the IPO — the filed half of the '$500 million' each that OpenAI's post says OpenAI and SoftBank put into SB Energy that day. Ares added $800M of redeemable preferred at the same time (same post). After the IPO OpenAI gets a board nominee while it holds more than 5% (S-1/A)
“On January 9, 2026, an affiliate of OpenAI, made an equity investment of $500.0 million preferred equity investment in Energy Global.”
SB Energy S-1/A No. 2 (filed Sep 21 2026) · sec.gov - warrants3,991,8093,991,809 warrants at $0.01 a share over SB Energy stock since the Aug 17 2026 amendment, which replaced the January grant of 8,554,600 warrants over Energy Global units (original S-1). Eight tranches: the first, 868,934, 'vested upon the execution of triple-net lease agreements for 800 MW-IT of load at our Milam County, Texas data center project', the second on the IPO's pricing — 1,737,867 to be net exercised then, 2,253,942 left unvested. OpenAI earns stock in its landlord by renting from it
“On August 17, 2026, we entered into the Amended and Restated Warrant Agreement with OpenAI, which amended and restated the Original OpenAI Warrant Agreement in its entirety. The amended agreement covers 3,991,809 OpenAI Warrants.”
SB Energy S-1/A No. 2 (filed Sep 21 2026) · sec.gov - softwareat least $50Mthe return leg: SB Energy has committed to buy at least $50.0M of OpenAI software and tools — $10.0M in 2026, $15.0M in 2027, $25.0M in 2028 — which it says it uses to speed up development and construction. OpenAI's post: 'SB Energy will become a major customer of OpenAI'
“We have committed to minimum purchases of OpenAI software and tools of $10.0 million, $15.0 million and $25.0 million for 2026, 2027 and 2028, respectively, or $50.0 million in the aggregate through 2028.”
SB Energy S-1/A No. 2 (filed Sep 21 2026) · sec.gov - foundation-agreementthe umbrella contract: a Foundation Agreement of Jan 9 2026 among OpenAI Infra Holdings, Energy Global and SoftBank Group, amended and restated on Aug 17 2026 (the day of the PORTS-Pike leases). OpenAI's post describes 'a non-exclusive preferred partnership' pairing 'OpenAI's first-party data center design' with SB Energy's delivery
““Foundation Agreement” means the Foundation Agreement, dated January 9, 2026, by and among OpenAI Infra Holdings, LLC, Energy Global and SoftBank Group Corp., as amended and restated in its entirety pursuant to Amendment No. 1 to Foundation Agreement, dated August 17, 2026.”
SB Energy S-1/A No. 2 (filed Sep 21 2026) · sec.gov - softbank-sites1.5 GWMilam County was announced on Sep 23 2025 as one of the two SoftBank–OpenAI Stargate sites, with Lordstown, Ohio — the pair able to 'scale to 1.5 gigawatts over the next 18 months', Milam 'developed in partnership with SB Energy, a SoftBank Group company, which is providing powered infrastructure'. No party document gives Lordstown's own capacity (Epoch's ceiling is in the note)
“The other two Stargate sites being announced today can scale to 1.5 gigawatts over the next 18 months.”
OpenAI/Oracle/SoftBank joint release, Sep 23 2025 (SoftBank Group copy) · group.softbank
Contested figures 4 not reconciled — every position side by side, with its source and tier
Scope note what this record leaves to other records
Carried elsewhere: PORTS-Pike's 17 OpenAI leases and Nvidia's guaranty and equity → nv-sbe-ports-pike; SB Energy-wide figures (8.8 GW-IT of signed leases, the ~$439B backlog, Ares's preferred, the IPO, the warrant liability) → the sbenergy entity; SoftBank's equity in OpenAI, including the $41B 2025 round → sb-openai-equity (round-2025) — a SoftBank–OpenAI share purchase, not a Milam term. Not carried here: Lordstown, Ohio, the other SoftBank-led site (no primary capacity; Epoch's Stargate report, cited on sg-jv, puts it at no more than 0.3 GW, a ceiling: the pair's 1.5 GW less Milam's 1.2 GW); a Texas building registration for one Milam building whose cost and size do not match the S-1's. History: The Decoder's Feb 2026 story, built on The Information's reporting, says, without naming a source for either, that ground was broken in Oct 2025 and that OpenAI 'reportedly reached a compromise' with SoftBank: 'OpenAI will sign the long-term lease and control the facility's design, while Softbank's subsidiary Softbank Energy will develop and own the project' — the structure OpenAI's Jan 9 post had already announced ('OpenAI's first-party data center design', with SB Energy to 'build and operate' the site) and the S-1/A now files. Tiered up from 2 to 1: every term now rests on SB Energy's filing.