Constellation
The largest US nuclear-plant operator, by its own count. It is restarting Three Mile Island Unit 1 to sell the power to Microsoft, and from June 2027 Meta's money is to keep Illinois' Clinton plant open. Its 20-year contracts with Amazon and Google back upgrades meant to add about 1,080 at reactors already running.
4 deals (4 T1) · 4 flows on the money map ·
Where it standsfrom Constellation’s 10-Q for the quarter to Sep 30, 2026
Deals 4
- Oct 5, 2026 updated Nov 21
- Sep 30, 2026 updated Nov 21
- Jun 3, 2025
- Sep 20, 2024 updated Nov 21
Money in and out 4 ribbons
Who pays Constellation (left), and whom it pays (right). Width is a rough size in $B, per year for multi-year deals.
← swipe to see the whole chart →
sourced deal · 0 of 4 estimated size · 4 of 4
As a table · 4 ribbons
Notes in the record on Constellation
the largest US nuclear fleet by its own count: 'Our nuclear fleet is the nation’s largest, with current generating capacity of approximately 22 ' (FY25 10-K); restarting TMI-1 as Crane CEC for the Microsoft PPA (2H-2027 target, DOE-guaranteed $1.0B FFB loan — no borrowings as of its Q3'26 10-Q filing (Nov 9 2026), >550 FTEs on site 6/2026; that 10-Q also says FERC granted the Eddystone→Crane interconnection-rights waiver in Jun 2026 and the rights were transferred); also Clinton→Meta, a 20-yr PPA for the plant's output from Jun 2027, after Illinois' ZEC program expires ('virtual' by Constellation's outlook deck; how it settles is contested): 1,121 including a 30 MW uprate (pw-meta-clinton-2025); the $21.8B Calpine acquisition (closed 1/2026); and uprates sold to two hyperscalers in Sep–Oct 2026 — Amazon, 690 MW for 20 years from Calvert Cliffs including a ~190 MW uprate due 2030–2032 (pw-amzn-calvert-cliffs), and Google, 890 MW of uprates at 11 units for 20 years beside a 15-year, 2,700 MW supply agreement (pw-goog-constellation): together 'approximately 1,080 megawatts' and 'more than $7 billion' of investment by its Oct 27 2026 release, the day DOE's Office of Energy Dominance Financing gave it a conditional loan commitment of up to $5B for uprates at eight of its plants (not final; its Q3'26 10-Q: 'Subject to the execution of a loan agreement', a 30-year term). The same 10-Q files both hyperscaler deals, the Google 2,700 MW one as a 'financial energy load following agreement'