Brookfield ventures buy and own Bloom fuel-cell plants under a framework raised from up to $5B to up to $25B, ~$2B committed by mid-2026; in 2025 they bought $862.1M of Bloom systems and installation.

A deal between Brookfield, Bloom Energy

Why it matters

Brookfield's ventures buy Bloom's fuel cells and own the plants, so data centers can buy power without owning generators. Bloom keeps a minority stake, and the ventures bought about 43% of its 2025 sales. About $2B of projects were committed by mid-2026, against a $25B ceiling.

Tap a figure for the line in its source.

Brookfield gives Bloom Energy

  • of project capital the framework can finance, raised from up to $5B over five years on Jun 30 2026 — a ceiling: projects must meet 'agreed investment and contractual criteria', and about $2B was committed by mid-2026
  • $862.1Mof Bloom systems and installation bought by the ventures in 2025, about 43% of Bloom's revenue — and $697.7M of Bloom's revenue from them in the first nine months of 2026
  • repaid to Bloom in Q3 2026 for option rights over a project, which Bloom bought in May and assigned to a Brookfield vehicle in July — rights whose original holder was Oracle

Bloom Energy gives Brookfield

  • Bloom's passive stake in each venture under the framework — 6.2% of the AI Fund's ventures at Sep 30 2026, 15% of one project outside it — with $71.6M of capital committed; on projects of five years or more Bloom can put its stake back to the fund

Oct 13, 2025 announced by Bloom Energy and Brookfieldupdated Nov 21, 2026framework at up to $25B since Jun 30 2026 disclosed by the parties

What happened

In August 2025 Bloom Energy and Brookfield, the Canadian investment firm, set up a way to pay for Bloom fuel-cell plants. Ventures owned mostly by Brookfield and its AI infrastructure fund buy the fuel cells from Bloom, own them and sell the power to data centers on long contracts, while Bloom keeps a small passive stake. The framework was announced in October as up to $5B — up to 1 , Brookfield said — and raised to up to $25B in June 2026; those are ceilings, and about $2B of projects had been committed by mid-2026. The ventures were Bloom's biggest customer in 2025 — $862.1M of its sales, about 43%. In the first nine months of 2026 they were $697.7M of its revenue, 23%, second to a customer Bloom does not name. The first project was 55 for a US data center Brookfield does not name. A Bloom plant 85% owned by a Brookfield venture sits at a Utah data-center campus that Oracle leases; that it is the first project, and Oracle's first Bloom system, is our reading, not the documents'. And in July 2026 Bloom passed a Brookfield vehicle an option on a project whose original holder was Oracle.

Sources 14 documents — 7 SEC filings · 4 company releases · 1 regulatory filing · 1 other document · 1 transcript

Research trail Found 157 documents and read 146 of them while checking this deal and related ones.

  1. SEC · SEC filingsec.gov
    States 4 figures: up to $5B framework · $809.8M fund JV revenue · up to 9.9% ownership rules · sales model
  2. SEC · SEC filingsec.gov
    States 4 figures: $697.725M related revenue 2026 · 6.2% bloom stakes · $71.6M capital commitment · $50M project option
  3. Bloom Energy · company releasebloomenergy.com
    States up to $25B expansion
  4. SEC · SEC filingsec.gov
    States up to 1 GW GW scope
  5. company releasebip.brookfield.com
    States $2B capex committed
  6. SEC · SEC filingsec.gov
    States 55 MW inaugural project
  7. Utah PSC · regulatory filingpscdocs.utah.gov
    States 85% bolt orc
  8. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  9. company releasebloomenergy.com
    Cited by the record; no single figure is quoted from it.
  10. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  11. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  12. company releasebam.brookfield.com
    Cited by the record; no single figure is quoted from it.
  13. other documenthrratings.com
    Cited by the record; no single figure is quoted from it.
  14. transcriptOct 28, 2025fool.com
    Cited by the record; no single figure is quoted from it.

The record's own summary of its sourcing: Bloom FY2025 10-K, Q2 and Q3 2026 10-Qs; Bloom–Brookfield releases (Oct 13 2025; Jun 30 2026); Brookfield Infrastructure's Q3 2025–Q2 2026 letters (6-K ex-99.1, furnished) and Q2 2026 supplemental; Brookfield Asset Management's Q2 2026 supplemental; a FERC Form 556 for Bolt ORC Project SPV (May 18 2026, via the Utah PSC); HR Ratings on Project Novva; Bloom's Q3 2025 call (Motley Fool transcript) · as of Oct 2026

The evidence 13 sourced figures · 2 disputes

The record's headline Brookfield–Bloom Energy: ventures that buy and own Bloom fuel-cell plants, under a framework of up to $5B over five years (Aug 2025) raised to up to $25B (Jun 2026) — ceilings, about $2B of projects committed — that bought $862.1M of Bloom systems and installation in 2025, about 43% of its revenue, and made up $697.7M of its revenue in the first nine months of 2026

Size
framework ≤$5B over five years (Aug 2025) → ≤$25B (Jun 30 2026), ceilings · ~$2B of capex committed (Q2 2026) · the ventures: $862.1M of Bloom's 2025 revenue (systems + installation), $697.7M of its revenue in the first nine months of 2026 · Bloom's stakes 6.2% (AI Fund ventures) and 15% (one project)
When
Aug 2025 partnership and framework entered (10-K) → Oct 13 2025 announced, up to $5B → Q4 2025 first project, 55 MW, completed (BIP) → Jan 29 2026 ~230 MW across projects, terms of 15 years or more (BIP) → Q1 2026 a $430M project, ~$1.6B of capex committed (BIP, Apr 29 2026) → May–Jul 2026 an Oracle-held project option passes from Bloom to a Brookfield vehicle → Jun 30 2026 framework raised to up to $25B → Q2 2026 a take-or-pay project with 'a highly rated counterparty', $2B committed (BIP) → Sep 30 2026 Bloom's stake in the AI Fund ventures 6.2% (Q3 10-Q)
Status
framework at up to $25B since Jun 30 2026; ~$2B of capex committed by Q2 2026 (BIP) · first project, 55 MW, completed Q4 2025; ~230 MW secured by Jan 2026 · purchases continuing ($321.6M of Bloom revenue in Q3 2026) · Bloom's stake in the AI Fund ventures 6.2% at Sep 30 2026, down from 9.9%, unexplained
Structure
vendor-financing joint ventures (circular): Brookfield's AI Infrastructure Fund and Brookfield hold most of each project venture and Bloom a passive minority; the ventures buy Bloom's fuel cells — in 2025 Bloom's largest customer, a related party — own the plants and sell the power under long-term contracts, Bloom operating the Utah plant (bolt-orc); Bloom's share of the profit on those sales comes out of its equity in the ventures until the plants depreciate
Programme
Time-to-power
Parties
Brookfield financier and majority owner of the ventures (the Fund JVs), through its AI Infrastructure Fund and other vehicles — Brookfield Asset Management's fund; Brookfield Infrastructure reports the projects and its share · Bloom Energy fuel-cell supplier to the ventures + passive minority owner + operator of the Utah plant (bolt-orc)
Capital
the seller's own money or backing comes back as its sales
Record
disclosed / primary source · as of Oct 2026

Flows 3 as the record states them

  • Brookfield → Bloom Energyfuel-cell-purchasesthe Fund JVs' purchases of Bloom systems and installation: $809.8M of product and $52.3M of installation revenue to Bloom in 2025 (10-K) and $697.7M of related-party revenue — the Fund JVs' — in the nine months to Sep 30 2026 (Q3 10-Q), ≈ $1,559.8M in all (our addition); the first project 55 MW for a data-center site in the US, the pipeline 'for leading hyperscale and investment-grade customers' (BIP), under framework ceilings of up to $5B and then up to $25B
  • Brookfield → Bloom Energyoption-reimbursement$50.0M paid to Bloom in Q3 2026 for option rights over an unnamed project, which Bloom had bought for $50.0M in May 2026 and assigned to a Brookfield vehicle in July — rights that could otherwise have gone back to their 'original holder, Oracle'
  • Bloom Energy → Brookfieldjv-stakesBloom's passive stakes in the Fund JVs — 6.2% of the AI Fund's two Bolt US ventures and 15.0% of ORC HoldCo at Sep 30 2026 — with $36.5M contributed in 2025 and $71.6M of capital committed in all at Sep 30 2026; at most 9.9% under the framework's rules, with a put back to the AI Fund on projects of five years or more

Resolved figures 13 each with the verbatim line from its document

  • frameworkup to $5B
    a ceiling, project by project: up to $5.0B over five years, entered in August 2025, for Bloom fuel-cell projects 'that meet agreed investment and contractual criteria', housed in Brookfield's AI Infrastructure Fund (10-K). Announced Oct 13 2025 as 'Brookfield will invest up to $5 billion to deploy Bloom’s advanced fuel cell technology', with Bloom to become 'preferred onsite power provider for Brookfield’s global AI factories' and a European site to be named by year-end, which no document on file names (release). Brookfield Infrastructure sized it 'to install up to 1 GW' (gw-scope). Raised to up to $25B on Jun 30 2026 (expansion); what the figure binds stays contested (framework-nature)
    “As part of this partnership, we established a prospective financing framework of up to $5.0 billion over five years for future Bloom Energy fuel cell projects that meet agreed investment and contractual criteria.”
    Bloom FY2025 10-K, Business and Note 7 · sec.gov
  • expansionup to $25B
    up to $25B from Jun 30 2026, 'a fivefold expansion since October 2025' — a framework 'to finance power projects for AI infrastructure', not a payment; Brookfield Infrastructure calls it '$25 billion of total capex' and says it will 'only commit material capital once appropriate commercial arrangements are secured' (BIP Q2 2026 letter). No gigawatt figure is given for it, and Bloom's Q3 2026 10-Q does not mention it. About $2B of projects were committed when it was announced (capex-committed)
    “Bloom Energy (NYSE: BE), a global leader in power solutions, and Brookfield today announced the expansion of their strategic partnership as Brookfield increases its framework to finance power projects for AI infrastructure – from previously announced $5 billion to $25 billion – a fivefold expansion since October 2025.”
    Bloom–Brookfield release (Jun 30 2026) · bloomenergy.com
  • gw-scopeup to 1 GW
    up to 1 GW for the original $5B, in Brookfield Infrastructure's words — 'to install up to 1 GW of behind the meter power solutions for data centers and AI factories' at the start (Q3 2025 letter) and again in April 2026, when a $430M project took the capex committed to about $1.6B (capex-committed). BIP's own equity commitment was then 'approximately $60 million'
    “Our $5 billion strategic partnership with Bloom Energy to install up to 1 GW of behind-the-meter power generation advanced further during the quarter, with the signing of an additional $430 million capex project, bringing total capex committed under the framework to approximately $1.6 billion.”
    Brookfield Infrastructure Q1 2026 letter (6-K ex-99.1, Apr 29 2026) · sec.gov
  • capex-committed$2B
    $2B of project capex committed under the framework by Q2 2026, up from about $1.6B at Q1 (gw-scope), after 'a new project during the quarter under a long-term take-or-pay arrangement with a highly rated counterparty', unnamed — 8% of the $25B ceiling (our division). BIP's own share is small and has been stated four ways (contested bip-capital): $80M 'prospective' here
    “Expanded our partnership with Bloom Energy from $5 billion to $25 billion and signed a new project during the quarter under a long-term take-or-pay arrangement with a highly rated counterparty, increasing total capex committed under the framework to $2 billion (BIP’s prospective share - $80 million)”
    Brookfield Infrastructure Q2 2026 supplemental information · bip.brookfield.com
  • fund-jv-revenue$809.8M
    $862.1M of Bloom's 2025 revenue came from the ventures, the 'Fund JVs' — $809.8M of product and $52.3M of installation ($809.8M + $52.3M, our addition), about 43% of its $2,024.0M (our division; the 10-K puts its largest customer, a related party, at 'approximately 43%'), 'transacted at arms-length and prevailing market terms', Bloom says. Bloom contributed $36.5M to the ventures in the year and recorded a $40.4M loss on its equity in them — the line through which it takes back its share of the profit on these sales. In 2026 the flow went on: $697.7M in the first nine months (related-revenue-2026)
    “For the year ended December 31, 2025, we recognized $809.8 million and $52.3 million of product and installation revenue, respectively, from sales of Energy Server systems and other products to the Fund JVs, which were transacted at arms-length and prevailing market terms.”
    Bloom FY2025 10-K, Note 12 · sec.gov
  • related-revenue-2026$697.725M
    $697.7M of Bloom's revenue came from related parties in the nine months to Sep 30 2026 — the Fund JVs, since the footnote's only other related party, SK ecoplant, ceased to be one on Jul 10 2025 — $321.6M of it in Q3. Of $3,052.3M in all, 23% (our division); the 10-Q's second-largest customer, 'our related party', was 'approximately 23%' over the nine months and 26% in Q3
    “Total revenue from related parties1 $ 321,644 $ 287,985 $ 697,725 $ 317,845”
    Bloom Q3 2026 10-Q, Note 11 (Oct 22 2026) · sec.gov
  • ownership-rulesup to 9.9%
    Bloom's stake is passive and capped: at most 9.9% in shorter projects, and in projects of five years or more the lesser of 9.9% of the equity or 2% of the projected investment, on which 'we retain a put right back to the AI Fund at a set rate of return' — and 15% in one project completed outside the AI Fund (10-K). At Sep 30 2026 it held 6.2% of the AI Fund's two Bolt US ventures, down from 9.9% at Dec 31 2025, and 15.0% of ORC HoldCo (bloom-stakes)
    “For shorter-term projects, our equity interest will not exceed 9.9%, while for longer-term projects (five years or more), our interest will be capped at the lesser of 9.9% of equity or 2% of projected investment.”
    Bloom FY2025 10-K, Financing Partners · sec.gov
  • bloom-stakes6.2%
    6.2% of the AI Fund's ventures (Bolt US Class A JVCo and Bolt US JVCo) at Sep 30 2026, down from 9.9% at Dec 31 2025 with no reason given, and 15.0% of ORC HoldCo, outside the AI Fund; 'The AI Fund and Brookfield hold the remaining ownership interests and serve as the primary beneficiaries', so Bloom does not consolidate them. Its maximum exposure was $63.4M: $28.2M carried, $14.5M of capital still to fund and $20.7M of deferred profit on its sales to them (capital-commitment)
    “AI Fund JVs Bolt US Class A JVCo LLC 6.2% 9.9% Bolt US JVCo LLC 6.2% 9.9% Other JVs ORC HoldCo LLC 15.0% 15.0%”
    Bloom Q3 2026 10-Q, Note 7 (Oct 22 2026) · sec.gov
  • capital-commitment$71.6M
    $71.6M of capital Bloom has committed to the ventures in all, at Sep 30 2026 — up from $58.2M at Dec 31 2025, after $36.5M contributed in 2025 (10-K). Its share of the profit on its sales to them is taken back through its equity in them until the plants depreciate ('Deferred profit')
    “Our total capital commitment to the Fund JVs as of September 30, 2026 is $71.6 million.”
    Bloom Q3 2026 10-Q, Note 7 (Oct 22 2026) · sec.gov
  • inaugural-project55 MW
    55 MW 'for a data center site in the U.S.', completed in Q4 2025 — announced in November as providing 'a hyperscale customer with 55 MW of power for an AI data center in the U.S.', BIP having 'invested approximately $140 million in the project' (Q3 2025 letter; contested bip-capital). By Jan 29 2026, projects 'for several hyperscaler customers' totalled 'approximately 230 MW', on contracts 'at least 15 years in length'. BIP names neither the site nor the customer. A Bloom plant of about that size sits at the address of a campus leased to Oracle: a FERC filing for the Bolt ORC project, facility ORC003.Z at 6477 Wells Park Road, West Jordan, Utah, gives 54,600 kW gross and 51,870 kW average net, Bloom as operator, and its owner, Bolt ORC OpCo, held 85% by Brookfield ORC HoldCo and 15% by Bloom (bolt-orc); HR Ratings puts Project Novva, a data-center campus '100.0% leased to Oracle America, Inc', at the same address. No document links that plant to this project. That Bolt ORC is the framework's inaugural project is the monitor's reading, resting on 54.6 MW ≈ 55 MW and on Bloom's 15% in 'one project outside the AI Fund structure' (10-K), the 15.0% it holds in ORC HoldCo; that it is also the first Oracle system Bloom says it delivered in 55 days is a second reading (pw-orcl-bloom first-delivery; contested systems-owner)
    “During the quarter, we completed the inaugural project under the framework agreement with Bloom Energy, installing 55 MW of behind the meter power for a data center site in the U.S.”
    Brookfield Infrastructure Q4 2025 letter (6-K ex-99.1, Jan 29 2026) · sec.gov
  • bolt-orc85%
    the Utah plant's owners, as filed with FERC (the framework's first project only on the monitor's reading: inaugural-project): Bolt ORC OpCo JV LLC owns the project; Brookfield ORC HoldCo LLC, itself held through Brookfield Bolt LLC and Brookfield Bolt Parent LLC, owns 85% of it and Bloom Energy Corporation 15%; Bloom is the facility operator. Bloom's 10-Qs carry the same 15% as 'ORC HoldCo LLC', its one venture outside the AI Fund (bloom-stakes). No document on file says what 'ORC' stands for
    “2) Brookfield ORC HoldCo LLC ("Brookfield HoldCo") owns 85% of Bolt OpCo”
    FERC Form 556, Bolt ORC Project SPV (May 18 2026, as filed with the Utah PSC) · pscdocs.utah.gov
  • project-option$50M
    a $50.0M bridge for an Oracle-linked project: in May 2026 Bloom paid $50.0M for 'an option to purchase a 100% ownership interest in the shares of an unaffiliated third-party entity associated with a customer project arrangement' (Q2 10-Q); in July the rights went to a Brookfield vehicle, and if it had not proceeded they 'could have been put back to the original holder, Oracle'. Brookfield paid Bloom $50.0M in Q3, and Bloom, which does not mean to keep any long-term interest, no longer holds the rights (Q3 10-Q). The project is not named; whether it is Project Jupiter's plant no document says
    “In May 2026, we made a $50.0 million payment to acquire contractual rights under an option arrangement. Under the related agreements, the rights were assigned in July 2026 to a Brookfield Asset Management (“Brookfield”) vehicle, which agreed to reimburse Bloom upon exercise of the option and acquisition of the underlying project.”
    Bloom Q3 2026 10-Q, MD&A (Oct 22 2026) · sec.gov
  • sales-model
    why a fund sits between Bloom and the data centers: most of Bloom's end users would rather pay for power than own the plant, so Bloom sells the systems to a financier that owns them and sells the power — the role the ventures play (10-K). For Bloom's concentration figures a 'customer' may be 'a project‑finance affiliate rather than the ultimate end user', a note that points to this framework (Q3 2026 10-Q, Note 1)
    “To date, the majority of our end user customers prefer to pay for the power they will consume from our Energy Server product, which means the sale of the Energy Server from Bloom is made to a financier or other strategic partner that owns the Energy Server product which is used to produce power for the end customer.”
    Bloom FY2025 10-K, Business · sec.gov

Contested figures 4 not reconciled — every position side by side, with its source and tier

framework-nature2 positions, side by side
a ceiling, conditional, project by project: 'a prospective financing framework of up to $5.0 billion over five years for future Bloom Energy fuel cell projects that meet agreed investment and contractual criteria' (Bloom 10-K); Brookfield Infrastructure: 'from $5 billion to $25 billion of total capex', committing 'material capital once appropriate commercial arrangements are secured' (Q2 2026 letter) — about $2B committed by then (capex-committed) Bloom FY2025 10-K; Brookfield Infrastructure Q2 2026 letter (6-K ex-99.1, Jul 30 2026)
a commitment or an investment, in the parties' own announcements: 'Brookfield will invest up to $5 billion to deploy Bloom’s advanced fuel cell technology' (Oct 13 2025 release); Bloom on its Q3 2025 call: Brookfield 'made an initial investment of $5 billion', 'an inaugural investment'; Bloom's commercial chief on the $25B: 'Today’s commitment reflects the momentum we are seeing' (Jun 30 2026 release); Brookfield Asset Management's Q2 2026 supplemental: '$25B Commitment'. None says any of it has been paid beyond the projects committed Bloom–Brookfield releases (Oct 13 2025; Jun 30 2026); Bloom Q3 2025 call (Motley Fool transcript); BAM Q2 2026 supplemental information
bip-capital2 positions, side by side
about $140M in the first project: 'BIP invested approximately $140 million in the project which should be completed in the fourth quarter' — the 55 MW for a hyperscale customer (Q3 2025 letter, Nov 2025) Brookfield Infrastructure Q3 2025 letter (6-K ex-99.1, Nov 7 2025)
about $50M across all the projects, twelve weeks later: 'BIP’s total equity investment associated with these projects to date is expected to be approximately $50 million, and fully deployed by mid-2027' (Q4 2025 letter, ~230 MW); then 'approximately $60 million' of equity commitment (Q1 2026 letter) and an '$80 million' prospective share of $2B of capex (Q2 2026 supplemental). No Brookfield document reconciles these with the $140M; BIP is one Brookfield vehicle, and the AI Fund's own capital is not stated Brookfield Infrastructure Q4 2025 and Q1 2026 letters (6-K ex-99.1, Jan 29 and Apr 29 2026); Q2 2026 supplemental information

Scope note what this record leaves to other records

NOT this record (carried elsewhere or not carried): Oracle's warrant and supply agreement → pw-orcl-bloom (this record keeps the Oracle-linked project option, Brookfield's money); Brookfield's AI Infrastructure Fund as a fund, its target and its anchor investor → the brookfield entity; Bloom's company figures → the bloomenergy entity. Not carried here: Brookfield Infrastructure's investor-day illustration of the expanded framework (about $5B of equity over five years, about $750M of it BIP's); the Brookfield Infrastructure Income Fund's holdings; HR Ratings' Novva loan terms; Bloom's equity-method and deferred-profit detail beyond its stakes and exposure; the European AI factory the October 2025 release promised by year-end, which no document on file names. Not adopted: 'just under 300 MW' (an analyst's question on BIP's Q4 2025 call, not Brookfield's figure); Bloom's 'made an initial investment of $5 billion' (Q3 2025 call) and BAM's '$25B Commitment' read as money paid (framework-nature). Bloom's stake in the AI Fund ventures fell from 9.9% to 6.2% in Q3 2026 with no reason given (bloom-stakes).

More between Brookfield and Bloom Energy

The record holds no other deal between them.

Everything between Brookfield and Bloom Energy →