Hut 8–Fluidstack, River Bend (West Feliciana LA)

Fluidstack is renting a 245 data center Hut 8 is building in Louisiana for Anthropic — $7.0B over 15 years — and Google guarantees the rent, amount undisclosed.

A deal between Fluidstack, Hut 8, Google, Anthropic, Lenders & bondholders

Why it matters

At Hut 8's River Bend data center, $3.25B in notes at 6.192% cover ~95% of the cost alongside a rent guarantee from Google. Hut 8 discloses no dollar cap or for Google's guarantee of all rent and certain other obligations for fifteen years. Hut 8's 10-K names Anthropic as a development partner.

Tap a figure for the line in its source.

Fluidstack gives

  • of rent over the 15-year lease; up to $17.7B with three 5-year renewals → Hut 8
  • of computing 'for Anthropic', in Hut 8's words — part of a plan for up to 2,295 → Anthropic

Hut 8 gives Fluidstack

  • of data-center capacity at River Bend, Louisiana; first hall due Q2 2027

Google gives Hut 8

  • guarantee of all base-term rent and some other payments; no amount, no disclosed

Lenders & bondholders gives Hut 8

  • of 6.192% bonds to build it, about 95% of cost, with no recourse to Hut 8

Dec 17, 2025 announced by Hut 8 (8-K and press release)updated Nov 20, 2026signed Dec 2025 disclosed by the parties

What happened

Hut 8, a former bitcoin miner, leased the data center it is building at its River Bend campus in Louisiana to a Fluidstack subsidiary. The 245-megawatt center is leased for 15 years and $7.0 billion. The rent could total up to $17.7 billion if Fluidstack renews three times. A Hut 8 subsidiary borrowed $3.25 billion to build the center through investment-grade bonds, which have credit ratings that indicate a lower risk of default. The borrowing covers about 95% of the cost. Lenders on that debt have no claim against Hut 8 itself. Google guarantees rent and certain other payments throughout the 15-year base term. Hut 8 has not said how large the guarantee is and has disclosed no , or rights to buy shares, for Google. Hut 8 stood apart from the other landlords by announcing the deal as a partnership with Anthropic. Hut 8 described the project as at least 245 and up to 2,295 megawatts “for Anthropic.” Only the first 245 are covered by a signed agreement. The rest consists of a right of first offer for Fluidstack and options Hut 8 and Anthropic may explore together. A right of first offer gives Fluidstack the first chance to make an offer. The first data hall, a room for computing equipment, is due in the second quarter of 2027.

Sources 13 documents — 11 SEC filings · 2 company releases

Research trail Found 853 documents and read 578 of them while checking this deal and related ones.

  1. SEC filingsec.gov
    States 7 figures: $7B base contract value · $17.7B renewal ceiling · up to 1,000 MW rofo · up to 1,050 MW tranche 3 · 330 MW utility capacity · delivery · site acreage
  2. SEC filingsec.gov
    States 3 figures: tenant and debt service · backstop scope · $3.25B project notes
  3. SEC filingsec.gov
    States 2 figures: 3% escalator · $6.9B expected NOI
  4. PR Newswire · company releaseprnewswire.com
    States 2 figures: 2,295 MW for anthropic · anthropic statement
  5. SEC filingsec.gov
    States 245 MW lease
  6. SEC filingsec.gov
    States anthropic recognition agreement
  7. SEC filingsec.gov
    States construction progress
  8. SEC filingsec.gov
    States 95% loan to cost
  9. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  10. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  11. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  12. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  13. company releaseentergy.com
    Cited by the record; no single figure is quoted from it.

The record's own summary of its sourcing: Hut 8 8-K Item 8.01 + ex-99.1 (Dec 17 2025, filed), PR Newswire release (Dec 17 2025), FY-2025 10-K, May-1 2026 notes 8-K, Q1-2026 10-Q and results release (furnished), Q2-2026 10-Q and results release (furnished); Entergy release (read 2026-09); Q3-2026 10-Q and results release (furnished, Nov 4 2026); Anthropic S-1 ex-10.11 (updated 2026-11) · as of Nov 2026

The evidence 18 sourced figures · 2 disputes

The record's headline Hut 8–Fluidstack, River Bend (West Feliciana LA): 15-year lease for 245 of critical IT, $7.0B base term ($17.7B with options) — Google all base-term rent, amount undisclosed, no disclosed; $3.25B 6.192% investment-grade notes at ~95% of cost; the one landlord that writes 'for Anthropic'

Size
$7.0B base term (15 yrs incl. 3% escalator; $17.7B with three 5-yr options) · 245 MW critical IT on 330 MW utility · Google backstop: all base-term rent, amount undisclosed · $3.25B 6.192% notes due 2042
When
Dec 17 2025 lease + Google backstop + Anthropic partnership → Apr 30 2026 $3.25B notes → Sep 30 2026 steel and foundations done on all four halls, substation energized → Q2 2027 first hall → balance of 2027; 15-yr base + 3 × 5-yr options
Status
signed Dec 2025 (announced Dec 17); notes closed Apr 30 2026; under construction — by Sep 30 2026 steel and foundations were complete on all four data halls and the substation energized; initial data hall Q2 2027, the rest over 2027; no lease revenue yet
Structure
15-year triple-net lease of the whole River Bend data center to Fluidstack USA IV Inc., three 5-year renewals; Fluidstack holds a ROFO on up to 1,000 MW more at the campus. Google provides 'a financial backstop … for all rent and certain other financial obligations under the lease agreement' for the base term — no dollar cap and no warrants in any Hut 8 filing. The project bond sits at Hut 8 DC LLC, secured on the project and its equity and 'not guaranteed by the Company, the tenant, or the lease guarantor'; rent under the lease is its principal source of repayment. Around it, a Hut 8–Anthropic–Fluidstack partnership framework: up to 2,295 MW, of which only these 245 MW are signed
Programme
Fluidstack leases, Google backstop
Parties
Fluidstack tenant — Fluidstack USA IV Inc., which leases the data center 'in its entirety'; holds a ROFO on up to 1,000 MW more · Hut 8 landlord and developer; notes issuer through Hut 8 DC LLC (non-recourse to Hut 8 Corp.) · Google financial backstop for all rent and certain other obligations over the 15-year base term — amount undisclosed, no warrants disclosed; not a lease party · Anthropic named in Hut 8's own documents as the partner the capacity is 'for' ('leveraging high-performance clusters operated by Fluidstack') and, in the 10-K, as co-developer of up to 1,050 MW of options; not a party to the lease; its Head of Compute: 'an expansion of our existing work with Fluidstack'; its own S-1 ex-10.11 names a 'Hut 8 Recognition Agreement' (anthropic-recognition-agreement) · Lenders & bondholders bondholders — the 6.192% project bonds, no recourse to Hut 8
Record
disclosed / primary source · as of Nov 2026

Flows 4 as the record states them

  • Fluidstack → Hut 8lease-payments$7.0B over the 15-year base term incl. a 3.0% annual escalator (10-K; filed release); ~$17.7B if all three 5-year renewals are exercised; Hut 8 expects $6.9B of cumulative NOI (~$454M a year). Rent from delivery (first hall Q2 2027)
  • Hut 8 → Fluidstackcapacity245 MW critical IT on 330 MW of Entergy Louisiana utility capacity; Fluidstack's ROFO covers up to 1,000 MW more, 'subject to the expansion of power at the site'
  • Google → Hut 8guaranteefinancial backstop of 'all rent and certain other financial obligations' for the 15-year base term — no dollar amount in any Hut 8 document (TNW's '$7bn at River Bend' is the lease value relabelled)
  • Fluidstack → Anthropiccomputethe 245 MW's end use, in Hut 8's words only: infrastructure 'for Anthropic, leveraging high-performance clusters operated by Fluidstack' — the lease, the 8-K Item 8.01 and the 10-Qs name only Fluidstack as tenant

Resolved figures 18 each with the verbatim line from its document

  • lease245 MW
    a 15-year lease with a subsidiary of Fluidstack Ltd. for 245 MW of IT capacity, 'along with … a financial backstop provided by Google LLC for all rent and certain other financial obligations' — the filed Item 8.01. The widest guarantee language of the four campuses
    “On December 17, 2025, Hut 8 Corp., a Delaware corporation (the “Company”), issued a press release (the “Press Release”) announcing that it entered into a 15-year lease agreement with a subsidiary of Fluidstack Ltd. (“Fluidstack”) for 245 megawatts of IT capacity at the Company’s River Bend data center campus in Louisiana, along with certain related transactions, including a financial backstop provided by Google LLC for all rent and certain other financial obligations under the lease agreement (the “Transactions”).”
    Hut 8 8-K Item 8.01 (filed 2025-12-17) · sec.gov
  • tenant-and-debt-service
    the tenant entity is Fluidstack USA IV Inc., and its rent is what services the bond — the lender's whole case rests on the lease and the guarantee behind it. Restated unchanged in Hut 8's Q3 10-Q
    “The data center is leased in its entirety to Fluidstack USA IV Inc. ("Fluidstack") and rent payable under the lease is the principal source of cash flow expected to service the River Bend Notes.”
    Hut 8 Q3-2026 10-Q — River Bend Notes · sec.gov
  • base-contract-value$7B
    $7.0B over the 15-year base term — FILED, which is why this is the one campus ribbon drawn solid. The 10-K words the backstop's scope as 'the lease payments and related pass-through obligations for the initial 15-year base term'
    “The lease has a base contract value of approximately $7.0 billion, with the potential to increase to $17.7 billion through renewal options, and is supported by a financial backstop from Google, which covers the lease payments and related pass-through obligations for the initial 15-year base term of the lease.”
    Hut 8 FY-2025 10-K · sec.gov
  • renewal-ceiling$17.7B
    ~$17.7B if all three 5-year renewals are exercised — INCLUSIVE of the $7.0B, and outside Google's base-term backstop; not drawn
    “The lease has a base contract value of approximately $7.0 billion, with the potential to increase to $17.7 billion through renewal options, and is supported by a financial backstop from Google, which covers the lease payments and related pass-through obligations for the initial 15-year base term of the lease.”
    Hut 8 FY-2025 10-K · sec.gov
  • escalator3%
    the $7.0B includes a 3.0% annual base-rent escalator (the release filed with the Item 8.01 8-K)
    “Base-Term Contract Value: Total contract value of $7.0 billion over a 15-year base lease term, inclusive of a 3.0% annual base rent escalator.”
    Hut 8 8-K ex-99.1 (filed with Item 8.01, 2025-12-17) · sec.gov
  • expected-noi$6.9B
    $6.9B cumulative NOI over the base term, ~$454M a year — Hut 8's projection (triple-net, so NOI ≈ rent less Hut 8's own costs)
    “NOI Contribution: Expected cumulative NOI contribution of $6.9 billion over the base lease term, translating to an expected average annual NOI contribution of $454 million.”
    Hut 8 8-K ex-99.1 (filed with Item 8.01, 2025-12-17) · sec.gov
  • backstop-scope
    the guarantee as the latest filing words it — 'rent payments and certain other financial obligations', no amount. No Hut 8 filing, release or deck on file discloses a dollar figure or any warrant for Google. Hut 8's Q3 10-Q (Nov 4 2026) words it the same way, and its Q3 release does not mention the backstop
    “The lease agreement is supported by a financial backstop provided by Google LLC for rent payments and certain other financial obligations thereunder.”
    Hut 8 Q3-2026 10-Q — River Bend Notes · sec.gov
  • for-anthropic2,295 MW
    the only landlord that ties its Fluidstack campus to Anthropic in its own words. The release (PR Newswire, not an 8-K exhibit — the filed ex-99.1 names only Fluidstack and Google): 'at least 245 MW and up to 2,295 MW … for Anthropic'. Only the 245 MW is contracted; the same release also calls the 2,295 'utility capacity' (see contested). Anthropic's own S-1 now names Hut 8 once, in its lease exhibit (anthropic-recognition-agreement)
    “As part of the partnership, Hut 8 will develop and deliver at least 245 megawatts (MW) and up to 2,295 MW of AI data center infrastructure for Anthropic, leveraging high-performance clusters operated by Fluidstack.”
    Hut 8 release (PR Newswire, Dec 17 2025) · prnewswire.com
  • anthropic-statement
    Anthropic's own words, via Hut 8's release (James Bradbury, Head of Compute): the partnership extends 'our existing work with Fluidstack' — the nearest thing on the record to Anthropic acknowledging a Fluidstack landlord
    “This partnership is an expansion of our existing work with Fluidstack and marks a new opportunity to collaborate with Hut 8 to bring additional capacity online by early 2027.”
    Hut 8 release (PR Newswire, Dec 17 2025) · prnewswire.com
  • anthropic-recognition-agreement
    Anthropic's own filing names Hut 8, once: the lease for its TPU8i pods (S-1 ex-10.11, Broadcom Inc. / AI Infrastructure OpCo II, LLC, Mar 31 2026) says that where Google ('Enso') gives credit support and agrees to the 'Google Assumption Obligation' — both defined in a Google–Broadcom order form the S-1 does not file — the lessor will accept a landlord's Recognition Agreement 'substantially consistent with' the 'Hut 8 Recognition Agreement', with edits, one of them 'for each day during the Notice Period that the Equipment remains at the Fluidstack Property'. Hut 8's only Fluidstack lease in this record is River Bend, so the pair fits it, but the exhibit names neither River Bend nor any location, date, pod count or amount, and the Hut 8 agreement itself is redacted: that TPU8i pods are to sit at River Bend is not stated. It shows what Google's backstop is from Anthropic's side — credit support the lease calls 'Required Credit Support', with a different, redacted pod price at locations where Google gives none (goog-anth-backstops). Anthropic's S-1/A names neither Hut 8 nor Louisiana
    “provided that if Enso is providing Credit Support (as defined in HSA Local TPU8i Order Form No. 1) and agreeing to the Google Assumption Obligation (as defined in HSA Local TPU8i Order Form No. 1) with respect to the applicable Delivery Location, Lessor will not unreasonably withhold, delay or condition its acceptance of a Recognition Agreement that is substantially consistent with, or more favorable to Lessor than, that certain Recognition Agreement [***] (the “Hut 8 Recognition Agreement”)”
    Anthropic S-1 ex-10.11 — Master Equipment Lease Agreement (Mar 31 2026), definition of 'Recognition Agreement' · sec.gov
  • rofoup to 1,000 MW
    Tranche 2: Fluidstack's right of first offer on up to 1,000 MW more at River Bend, 'subject to the expansion of power at the site' — a right, not a lease
    “The agreement grants Fluidstack a Right of First Offer for up to an additional 1,000 MW of IT capacity at future expansion phases of campus, subject to the expansion of power at the site.”
    Hut 8 FY-2025 10-K · sec.gov
  • tranche-3up to 1,050 MW
    Tranche 3: up to 1,050 MW of 'additional optional capacity' that Hut 8 and Anthropic 'may jointly diligence and develop' beyond River Bend (for comparison, DCD's 'up to 1GW' rounds). 245 + 1,000 + 1,050 = 2,295. Anthropic named in a FILED Hut 8 document, as a development partner, not a tenant. No later Hut 8 filing restates it: the three 2026 10-Qs (Q1–Q3) and the Q1–Q3 results releases name neither Anthropic nor the 1,050 MW or 2,295 MW
    “As part of the partnership, Hut 8 and Anthropic may jointly diligence and develop up to 1,050 MW of additional optional capacity across our broader pipeline for a total of up to 2,295 MW of AI data center infrastructure, reflecting our power-first development model and strategic focus on scaling AI infrastructure.”
    Hut 8 FY-2025 10-K · sec.gov
  • utility-capacity330 MW
    330 MW of Entergy Louisiana utility capacity for the 245 MW of IT (~1.35 utility-to-IT), with 'up to an additional 1,000 MW' of utility capacity possible
    “The project will commercialize 330 MW of utility capacity and is targeted for initial delivery and commissioning in Q2 2027.”
    Hut 8 FY-2025 10-K · sec.gov
  • delivery2027
    initial data hall Q2 2027, the others over the balance of 2027 — later than the '$50B' programme's 'sites coming online throughout 2026' and than Anthropic's 'by early 2027'
    “The initial data hall at River Bend is scheduled for completion and commissioning in Q2 2027, with additional data halls scheduled to come online over the balance of 2027.”
    Hut 8 FY-2025 10-K · sec.gov
  • construction-progress2027
    construction on schedule at Sep 30 2026: structural steel and building foundations complete across all four data halls and the campus substation initially energized, with 'initial data hall delivery targeted for Q2 2027' — the 10-K's date (delivery). Hut 8's CEO: 'Construction at both River Bend and Beacon Point remains on track to meet our delivery targets'. Hut 8's own release, furnished (8-K Items 2.02/9.01), not filed: the filed Q3 10-Q repeats the 245 MW, the tenant and the notes but gives no schedule. The same release says Fluidstack 'holds a ROFO under the River Bend lease' on the 1,000 MW of potential expansion (rofo)
    “Advanced the buildout of River Bend, with initial data hall delivery targeted for Q2 2027. Progress during the quarter included completion of structural steel and building foundations across all four data halls and initial energization of the campus substation.”
    Hut 8 Q3-2026 results release (8-K ex-99.1, furnished, 2026-11-04) · sec.gov
  • project-notes$3.25B
    $3.25B of 6.192% senior secured notes due Nov 15 2042 at Hut 8 DC LLC, closed Apr 30 2026 at par — fully amortizing over ~16.5 years (a tenor matched to the lease): interest semi-annually from Nov 15 2026, scheduled principal from May 15 2028; effective rate 6.41%, net carrying amount $3.20B ($52.5M of issuance costs unamortized), estimated fair value $3.05B at Sep 30 2026 (Level 2 inputs; $3.30B at Jun 30 2026); 'obligations solely of Hut 8 DC … not guaranteed by the Company, the tenant, or the lease guarantor'
    “On April 30, 2026, Hut 8 DC LLC ("Hut 8 DC"), an indirect wholly owned subsidiary of the Company, issued $3.25 billion aggregate principal amount of 6.192% senior secured notes due November 15, 2042 (the "River Bend Notes") in a private offering.”
    Hut 8 Q3-2026 10-Q — River Bend Notes · sec.gov
  • loan-to-cost95%
    ~95% loan-to-cost — a dated series: 'up to 85%' planned at the lease announcement (Dec 2025, JPM/Goldman bank loan) → '90% LTC at SOFR plus 240' (Q4-2025 call; interim terms that never closed) → ~95% through the bond, with $184M of equity returned to Hut 8. The same release calls them 'fully amortizing 16.5-year investment-grade senior secured notes' and River Bend 'the first single-sponsor data center project to access the investment-grade construction bond market' — Hut 8's words: no rating report is on file, and no document attributes the rating or the leverage to Google's backstop. Hut 8's own release, furnished, not filed (tier 1, read from its own copy on EDGAR); the filed 10-Q gives the notes, not the ratio
    “The transaction increased loan-to-cost from approximately 85% contemplated at lease announcement to 95% and, through a tenor aligned to the lease term, eliminated refinancing risk, and fully funded the project with $184 million of equity to be returned to Hut 8 at closing for redeployment, with no incremental equity contribution expected from Hut 8.”
    Hut 8 Q1-2026 results release (8-K ex-99.1, furnished, 2026-05-06) · sec.gov
  • site-acreage627
    627 acres in West Feliciana Parish at Dec 31 2025: the 592 acres bought in Feb 2025 for $18.1M plus 35 more bought in Dec 2025 (DCD uses both numbers). Hut 8's call speaks of a '3,000 acre opportunity' for the wider campus — a plan, not holdings
    “We also own 627 acres of land in West Feliciana Parish, Louisiana, 524 acres of land in Nueces County, Texas, and 7.2 acres of land in Batavia, Illinois.”
    Hut 8 FY-2025 10-K · sec.gov

Contested figures 2 not reconciled — every position side by side, with its source and tier

headline-dollarone entry, in its own words
four quantities that share the name 'River Bend', never one: $7.0B lease value (10-K) · 'up to $10 billion investment in Phase I, including Hut 8's investment in data center infrastructure' (Entergy / Louisiana Economic Development — capex incl. the tenant's equipment) · '$7bn' as Google's guarantee (TNW relaying The Information — the lease value relabelled; no Hut 8 document sizes the guarantee) · $3.25B of project debt Hut 8 10-K vs Entergy/LED vs TNW
partnership-unitsone entry, in its own words
2,295 MW 'of AI data center infrastructure' vs 2,295 MW 'of utility capacity' — the same PR Newswire release uses both, while its Tranche 1 counts 245 MW of IT on 330 MW of utility and Tranche 2 is 'IT capacity'. The 245 + 1,000 + 1,050 arithmetic mixes an IT figure with ceilings of unstated basis; only the 245 MW of IT is contracted Hut 8 release (PR Newswire, Dec 17 2025)

Scope note what this record leaves to other records

NOT this record: Beacon Point (nv-hut8-beacon-point) — Hut 8's aggregates ($16.8B / 597 MW at Q1; $26.6B / 949 MW after Jul 20 2026) mix River Bend with Beacon Point and are never Fluidstack's or Anthropic's; the ~8.5 GW development pipeline; American Bitcoin. Entergy's $100M community commitment and LED's job counts (75 direct / 268 total) are Phase I colour. MeasuredAI's hall layout (65 MW + 3 × 60 MW) and '$159/kW/month' are tier-3 arithmetic. The Google backstop's aggregate on Alphabet's side → goog-anth-backstops. Anthropic's S-1 colocation agreement is with Fluidstack USA I Inc. (anth-fluidstack), not River Bend's tenant, Fluidstack USA IV.

More between these companies

  1. Nov 9, 2026 updated Nov 19
  2. Aug 20, 2026 updated Nov 19
  3. Jul 6, 2026 updated Nov 20
  4. May 6, 2026 updated Nov 19
  5. Apr 24, 2026 updated Nov 21
  6. Nov 12, 2025 updated Nov 21
  7. Oct 28, 2025 updated Nov 21
  8. Oct 23, 2025 updated Nov 21
  9. Sep 25, 2025 updated Nov 20
  10. Sep 4, 2025 updated Nov 21
  11. Aug 14, 2025 updated Nov 20
  12. Aug 2025 updated Nov 21

Everything between Google and Anthropic → · Everything between Fluidstack and Google → · Everything between Hut 8 and Anthropic → · Everything between Fluidstack and Anthropic →