Why it matters
Meta is paying for an existing reactor's output, not a new one's. Both companies say the 20-year contract, starting in June 2027 as an Illinois subsidy for Clinton ends, keeps the plant running without it. Only 30 of its 1,121 , from upgrades expected by 2029, is new. Constellation calls it a virtual PPA for the plant's clean-energy attributes, though both say the energy will support Meta's regional operations.
Tap a figure for the line in its source.
Constellation gives Meta
- of the plant's output for 20 years from June 2027, counting 30 from upgrades expected to be complete in 2029; Constellation calls it a virtual PPA
- the plant's clean-energy attributes, which Meta buys toward matching its electricity use with clean power; Constellation says the plant's power will keep flowing onto the local grid
Meta gives Constellation
- payments at an undisclosed price; outside estimates, none from either company, run about $70–90 per MWh
What happened
Meta signed a 20-year agreement for the output of Constellation's Clinton nuclear plant in Illinois. It starts in June 2027, when an Illinois subsidy for the plant ends. Constellation says that subsidy kept the plant from closing in 2017, and that Meta's deal essentially replaces it. The agreement covers 1,121 megawatts. That counts 30 megawatts of new output from upgrades, which Constellation expects to finish in 2029. The rest is the plant's output before the upgrades. The Nuclear Regulatory Commission renewed the plant's licence in December 2025, so it may run through 2047. Constellation calls the deal a virtual power purchase agreement. Under it, Constellation says, Meta buys the plant's clean-energy attributes, and the power keeps flowing onto the local grid. Both companies also say the energy will support Meta's operations in the region. Neither company disclosed the price. Outside estimates, none from either company, run from about $70 to $90 per megawatt-hour.
Sources 34 documents — 10 company releases · 9 SEC filings · 8 other documents · 4 press reports · 1 regulatory filing · 1 government statement · 1 social post
- States 3 figures: zec replacement · attributes · homes
- States 2 figures: start · 30 MW uprate
- States 1,121 MW contract volume
- States term years
- States licence
- States 1–4 GW rfp (for context)
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: Constellation–Meta releases (Jun 3 2025) + Constellation FY25 10-K, Q2'25 10-Q and earnings release, 2026 outlook deck (8-K ex-99.1, furnished), 2026 proxy, Dec 16 2025 and Oct 27 2026 releases, Clinton page, fact sheet and 2026 sustainability report; NRC environmental review; MISO interconnection queue; EIA-860M; Utility Dive, Bloomberg, Heatmap, Chicago Tribune, Munro, Yellow Cake · as of Nov 2026
The evidence 8 sourced figures · 7 disputes · 1 for context
The record's headline Meta–Constellation: 20-yr PPA for the Clinton nuclear plant's output, 1,121 incl. a 30 MW uprate, from Jun 2027
- Size
- 1,121 MW / 20 yr (incl. a 30 MW uprate, expected complete 2029) · from Jun 2027 · price undisclosed
- When
- Feb 14 2024 (licence renewal application) → Apr 30 2025 (a 21 MW nuclear request at the Clinton substation enters MISO's queue) → Jun 3 2025 (agreement announced) → Aug 26 2025 (on-site event with Meta) → Dec 16 2025 (NRC renews the licence to 2047) → May 2027 (Illinois' ZEC program ends) → Jun 2027 (the PPA begins) → 2027 (generator uprate, Constellation's aim) → 2029 (uprates fully complete, expected) → Apr 17 2047 (the renewed licence ends)
- Status
- signed by Jun 3 2025 (announced; the FY25 10-K: 'In June 2025, we signed'); the NRC renewed Clinton's licence on Dec 16 2025, to Apr 17 2047; the term begins Jun 2027, as Illinois' ZEC program ends; the uprates are expected to be fully complete in 2029
- Structure
- 20-year power purchase agreement for the output of the Clinton Clean Energy Center, 1,121 MW including the 30 MW uprate, from June 2027 — a 'virtual PPA' in Constellation's 2026 outlook deck. Meta buys the plant's clean-energy attributes, and Constellation says the plant's power will keep flowing onto MISO's grid in central and southern Illinois (zone 4); whether Meta also takes power is contested (settlement). The contract is not filed
- Programme
- Time-to-power
- Parties
- Meta buyer — 20 years of Clinton's output; Meta says the energy will support its operations in the region, and Constellation that Meta buys the plant's clean-energy attributes · Constellation seller — owns and runs the plant, relicensed to 2047, and is to make the 30 MW uprate, expected to be complete in 2029
- Record
- disclosed / primary source · as of Nov 2026
Flows 3 as the record states them
- Constellation → Metaoutput1,121 MW of Clinton's output for 20 years from June 2027, inclusive of the 30 MW uprate expected to be fully complete in 2029; no document on file gives an annual MWh or a delivery shape; a 'virtual PPA' by Constellation's deck, whether Meta also takes power contested (settlement)
- Constellation → Metaattributesthe plant's clean-energy attributes, toward Meta's commitment to match 100% of its electricity use with clean and renewable energy
- Meta → Constellationppa-paymentsprice undisclosed — outside estimates ~$70–90/MWh, tier 3 (contested ppa-price); the 20-year total contested too (total-value)
Resolved figures 8 each with the verbatim line from its document
- contract-volume1,121 MW1,121 MW for 20 years, counting the 30 MW uprate — Constellation's 2026 outlook deck: '1,121 MWs including uprate under virtual PPA Clinton'. The announcement gave the figure without saying so: Constellation's release, 'with 1,121 megawatts of emissions-free nuclear energy' and 'This deal will expand Clinton’s clean energy output by 30 megawatts'; Meta's, 'providing 1,121 megawatts' and 'adds 30 megawatts of incremental capacity to the grid'. A week later Utility Dive reported Constellation's spokesperson as saying the two uprate steps would be 'boosting total plant output to 1,121 MW', and the FY2025 10-K rates the plant 1,092 MW before them (1,092 + 30 = 1,122, our addition; see plant-capacity). Reuters, via AOL, read it the other way: Clinton 'has a capacity of 1,121 megawatts', to grow 'by 30 MW'. The agreement is 'for the output' (release; the Q2 2025 earnings release: 'full output'); Constellation's 10-Qs and 10-K describe it with no MW, its 2026 proxy repeats the 1,121, and no document on file gives an annual MWh or says whether the volume ramps with the uprates
“1,121 MWs including uprate under virtual PPA Clinton”
Constellation 2026 outlook deck (8-K ex-99.1, furnished, Mar 31 2026) · sec.gov - term-years20 years20 years, 'starting in 2027' by Meta's account and in June 2027 by Constellation's (see start). Begun then, it would end about mid-2047 (our addition), the year the renewed licence ends (see licence); Constellation's 2026 proxy says the deal 'will allow us to operate Clinton until mid-century'
“Responding to these needs, our 20-year agreement with Constellation, starting in 2027, secures the long-term operation of the Clinton Clean Energy Center, providing 1,121 megawatts of emissions-free nuclear energy.”
Meta newsroom (Jun 3 2025) · about.fb.com - start2027June 2027, as Illinois' zero-emission-credit (ZEC) program ends: the release has the program providing 'financial support to the plant through mid-2027', the FY2025 10-K lists Clinton's and Quad Cities' ZECs as expiring in 2027, and Constellation's Dec 16 2025 release puts the expiration 'in May 2027'. The licence then in force also ran out in 2027, on April 17, by the NRC's environmental review for the renewal (see licence). No document on file gives the first day
“In June 2025, we signed a 20-year PPA with Meta Platforms, Inc. (Meta) for the output of the Clinton Clean Energy Center to support Meta’s clean energy goals and operations in the region with emissions-free nuclear energy. The agreement, beginning in June 2027, supports the relicensing and continued operations of Clinton for another two decades after the state’s ZEC program expires.”
CEG FY2025 10-K · sec.gov - zec-replacementwhat both companies say the deal does: Constellation's release says Clinton was 'slated for premature closure in 2017 after years of financial losses', until Illinois' Future Energy Jobs Act set up the ZEC program, and that the PPA 'essentially replaces' it; Meta's post says the agreement keeps the plant running 'without relying on the state’s Zero Emission Credit program, maintaining operations without additional ratepayer support'. Not everyone agrees Clinton needed Meta: ''Saved' might have been a strong word' (Charles Hua of the advocacy group PowerLines, to Utility Dive), since 'a deal would have been struck with someone, somewhere' (Tremaine Phillips, a former member of Michigan's Public Service Commission)
“Constellation’s agreement with Meta is a market-based solution that essentially replaces the ZEC program and ensures long-term operations of the plant without ratepayer support.”
Constellation–Meta release (Jun 3 2025) · constellationenergy.com - uprate30 MW30 MW of added output from uprates at the running reactor, 'expected to be fully complete in 2029'. Two steps, by Utility Dive's account of Constellation's spokesperson: first the plant's high-pressure steam turbine is modified to raise generator capacity, then reactor power measurement is improved so the plant can run closer to full capacity; Constellation 'aims to finish the generator uprate in 2027 and the measurement uncertainty recapture project in 2029'. The 10-K expects the uprates to qualify for the 45Y clean-electricity tax credit for their first 10 years. Constellation's Oct 27 2026 release, on DOE's conditional loan commitment of up to $5B for uprates at eight of its plants, Clinton among them: 'An agreement announced last year with Meta also supports a 30-megawatt expansion at Clinton Clean Energy Center in Illinois'; whether the loan would fund this uprate it does not say. The only grid record on file shows 21 MW (see uprate-grid-queue)
“This deal will expand Clinton’s clean energy output by 30 megawatts through plant uprates, expected to be fully complete in 2029, and will enable the Clinton Clean Energy Center to continue to flow power onto the local grid, providing grid reliability and low-cost power to the region for decades to come.”
CEG FY2025 10-K · sec.gov - attributesMeta buys the plant's clean-energy attributes, toward its commitment to match all its electricity use with clean and renewable energy; the same paragraph says the PPA 'will enable the Clinton Clean Energy Center to continue to flow power onto the local grid', and the release that the deal lets Constellation add energy 'to the grid in the Midcontinent Independent System Operator’s (MISO) zone four territory, covering central and southern Illinois'. Whether Meta also takes the power: contested settlement
“Meta is purchasing the plant’s clean energy attributes as part of its commitment to match 100% of its electricity use with clean and renewable energy.”
Constellation–Meta release (Jun 3 2025) · constellationenergy.com - licence2047the NRC approved a 20-year renewal of Clinton's operating licence on Dec 16 2025; Constellation's Clinton page: 'licensed until April 17, 2047'. The licence then in force would have expired on April 17, 2027 (the NRC's environmental review; the application was filed Feb 14 2024, before the deal). The same release: 'actual operation is contingent on each plant's financial viability', and at Clinton 'the facility's carbon-free energy is secure as a result of the 20-year agreement with Meta announced in August' — both companies' releases are dated Jun 3 2025; Constellation's Clinton page records an on-site event with Meta representatives on Aug 26 2025 'to celebrate the 20-year agreement'
“The approvals allow Clinton to operate through 2047 and the Dresden reactors to operate through 2049 and 2051.”
Constellation release (Dec 16 2025) · constellationenergy.com - homesmore than 800,000more than 800,000 homes' worth of electricity, by Constellation's own estimate for the plant (its Clinton page: 'enough electricity to power the equivalent of 800,000 homes'); Bloomberg's 'about 1 million homes' gives no basis
“The Center directly employs over 530 people, contributes approximately $13.5 million in annual taxes, and generates enough carbon-free electricity to power over 800,000 homes.”
Constellation–Meta release (Jun 3 2025) · constellationenergy.com
Contested figures 7 not reconciled — every position side by side, with its source and tier
For context, not this deal's figures 1 kept beside the deal so they are not mistaken for its numbers
- rfp1–4 GWMeta's request for proposals of Dec 3 2024: 1–4 GW of new nuclear generation capacity in the US, delivered from the early 2030s. Not this deal: Clinton is a running plant, and Meta's Jun 3 2025 post announced the Clinton agreement and, 'Separately', a shortlist from that request. Its Jan 2026 agreements with Vistra, TerraPower and Oklo are pw-meta-6gw
“Our aim is to add 1-4 GW of new nuclear generation capacity in the U.S. to be delivered starting in the early 2030s.”
Meta sustainability post (Dec 3 2024) · sustainability.atmeta.com
Scope note what this record leaves to other records
Not this deal — carried elsewhere or not carried: the Brattle Group's study for Constellation of what retiring Clinton would cost Illinois (more than 34 million metric tons of added carbon over 20 years and $765 million a year of state GDP, both cited in the release; its state-tax loss reads $733 million in its text and $773 million in its table); the Illinois ZEC program's prices and caps, which cover Clinton and Quad Cities together; DOE's conditional loan commitment of up to $5B (Oct 27 2026) for uprates at eight Constellation plants, Clinton among them, not final and with no split by plant (pw-goog-constellation's note); Constellation's options at the site — extending its early site permit or seeking a construction permit for an advanced reactor or SMR, which the release says it is 'evaluating'; Constellation's $1 million of local giving over five years from 2026; Meta's other nuclear agreements (pw-meta-6gw) and its request for 1–4 GW of new nuclear (rfp); Microsoft's Three Mile Island PPA (pw-msft-tmi), the other 'virtual PPA' in the same deck. Not adopted: Gabelli's 'On May 16, 2024, CEG and Meta announced a 20-year, 1,092 MW front-of- the-meter power purchase agreement' — the dated releases are Jun 3 2025, and 1,092 MW is the plant's rating. Constellation's 10-Qs for the Jun and Sep 2026 quarters and its Nov 9 2026 earnings release and deck, as read for this record, do not mention Meta; the agreement itself is not filed.