data-center developer

TeraWulf

A former bitcoin miner turned data-center landlord, based in Maryland and listed on Nasdaq. It owns power-rich industrial sites — a retired coal-plant site on Lake Ontario and the shuttered Century Aluminum smelter in Hawesville, Kentucky — and builds data halls on them that AI companies rent for decades. At Lake Mariner its tenant is the cloud operator Fluidstack, with Google backstopping part of the rent; at Hawesville, for the first time, the tenant is Anthropic itself, and Google has agreed to back that rent too.

4 deals (4 T1) · 2 flows on the money map ·

Where it standsfrom TeraWulf’s 10-Q for the quarter to Sep 30, 2026

Market cap
$4.91B
at the Nov 20, 2026 close
P/Eworked out
Loss-making
net loss of $784M over the last 12 months
Revenue
$76.2M
latest quarter · up 51% from $50.6M a year before
Operating loss
$88.2M
latest quarter · 116% of revenue
Net income
$710M
latest quarter · after $703M of gains outside its operations
Capexworked out
$852M
latest quarter · $2.85B over the last 12 months
Free cash flowworked out
−$3.11B
last 12 months: −$267M from operations, less $2.85B capex
Cash
$1.6B

Deals 4

sort: · · ·
  1. Jul 6, 2026 updated Nov 20
  2. Oct 28, 2025 updated Nov 21
  3. Aug 14, 2025 updated Nov 20
  4. Aug 2025 updated Nov 21

Money in and out 2 ribbons

Who pays TeraWulf (left), and whom it pays (right). Width is a rough size in $B, per year for multi-year deals.

← swipe to see the whole chart →

sourced deal · 2 of 2

As a table · 2 ribbons
Timeline 7 dated entries
  1. Nov 2026Google agrees to backstop Anthropic's Justified leases (Nov 4, 8-K Item 1.01): three Credit Support Agreements, one per building (CB-1–CB-3), each effective at its building's last hall and ending once Anthropic is investment grade for three months; on a default Google takes the lease over, or after six years (sooner if the TPU pods can draw under half the critical power) may pay an amortizing termination fee and take equity in Raylan; amount unfiled; only Google-approved TPUs as the halls' accelerators (T1, ex-10.1 form) · leases amended the same day (T1) · delivery now late 2027 → Q2 2028, was early 2028 (T1) · Fluor EPC for the three buildings, pricing still being set (T2 release) — anth-terawulf-hawesville
  2. Aug 2026Kentucky PSC approves the Big Rivers/Kenergy RESA for Justified DataPower LLC (Aug 21): 482 MW Maximum Contract Demand, 15-yr + automatic 5-yr renewals, 482 MW take-or-pay for six years, market pass-through pricing — Anthropic unnamed in the docket (T1 order) · TeraWulf's own release puts the build at $4.0–4.5B vs the $3.5–4.0B in its regulatory record (contested, both T1) · Q2 release (Aug 5): ~$33B with both Anthropic options (T2, furnished); 10-Q: the lease 'had not commenced' (T1)
  3. Jul 2026Anthropic lease at Justified (Jul 6, 8-K Item 8.01): 20 yrs from delivery, ~401 MW critical IT, ~$19B initial term, 2 × 5-yr options, 'expected to be supported by an investment-grade credit' — unnamed (T1) · same 8-K: 50.1% of the Abernathy JV sold to a Fluidstack-led group for ~$530M in three instalments — fs-terawulf-abernathy (T1) · Lake Mariner CB-3 delivered to Fluidstack; $600M of Google's backstop effective; CB-4/CB-5 upsized to 168 MW each (T1 10-Q + call) — fs-terawulf-lake-mariner
  4. Feb 2026Justified Data Campus (former Century Aluminum smelter, Hawesville KY) bought Feb 2 for $200.0M cash + a 6.8% minority interest in the development subsidiary; up to 480 MW gross power on existing transmission (T1 10-Q)
  5. Dec 2025Abernathy JV notes: $1.3B 7.250% senior secured notes due 2030 at Flash Compute LLC, closed Dec 29 (T1 8-K) — fs-terawulf-abernathy
  6. Oct 2025Abernathy TX JV with Fluidstack (TeraWulf 50.1% for $450.0M / Fluidstack 49.9%): 168 MW critical IT leased to Fluidstack USA III for 25 years, ~$9.5B; Google backstop $1.3B, no TeraWulf warrants (T1 8-K) · $3,200.0M 7.75% WULF Compute notes due 2030 for Lake Mariner closed Oct 22 (T1 10-K)
  7. Aug 2025Lake Mariner: three 10-yr leases to Fluidstack USA I (CB-3/CB-4 Aug 13, CB-5 Aug 18) — ~$6.7B base term (furnished); Google backstop $1.8B → ~$3.2B for 73,580,000 penny warrants (~14% pro forma; FERC: 'unexecuted warrants do not convey … ownership') (T1 8-Ks) — fs-terawulf-lake-mariner

Timeline entries carry no source field yet; some name one inline.

Notes in the record on TeraWulf

TeraWulf Inc. (Nasdaq: WULF; CIK 1083301). Sites in this monitor: Justified Data Campus, Hawesville KY (Anthropic, ~401 critical IT in three buildings, 20-yr — each lease expiring 20 years after its final phase commences — delivered late 2027 to Q2 2028, not commenced at Sep 30 2026 — anth-terawulf-hawesville; Google agreed Nov 4 2026 to Anthropic's rent from each building's last hall until Anthropic is investment grade, amount unfiled, the halls' accelerators Google-approved TPUs only; Fluor the EPC contractor since Oct 2026, guaranteed maximum price still to be set; bought Feb 2 2026 from Century Aluminum for $200.0M cash + a 6.8% minority interest in the development subsidiary, TeraWulf holding the other 93.2%; 482 MW contract demand under the KY PSC-approved Big Rivers/Kenergy RESA — the Q2 10-Q's 'up to 480 MW of gross power availability' is not repeated in the Q3 10-Q). Fluidstack sites: Lake Mariner NY — three Akela leases to Fluidstack USA I, 378 MW critical IT, one commenced at Sep 30 2026 and the rest due from Q4 2026 to the first half of 2027, ~$3.2B Google backstop, 73,580,000 penny (8,443,606 exercisable since that first lease commenced), $3.2B 7.75% WULF Compute notes (fs-terawulf-lake-mariner; Core42's 60 MW at the same campus, 72.5 MW gross in the Q3-2025 10-Q, is not Fluidstack's — all four of its leases have commenced and the 60 MW is in service, 102 MW operating on the campus in all); Abernathy TX — 168 MW JV leased to Fluidstack USA III for 25 years, $1.3B Google backstop without warrants, TeraWulf's 50.1% sold to a Fluidstack-led group for ~$530M (effective Jul 5–6 2026: $250.0M received in July, $280.0M deferred and secured by pledged JV interests, TeraWulf 'no longer holds any equity interest') (fs-terawulf-abernathy). Also: Muskie (Grayson KY: in May 2026 TeraWulf bought 100% of Industrial Equity Partners, which 'owned or had the contractual purchase rights to approximately 308 acres'; the Q3 10-Q has TeraWulf 'owning the entire 308 acres' once it bought the optional parcels in the quarter; Kentucky Power service from Q4 2028 — the Q3 10-Q describes the May 22 electric service agreement as 'up to 500 MW' beside a letter agreement for 1,000 MW, under which Kentucky Power builds a 345 kV substation for the full 1,000 MW; amended and restated agreements executed Oct 1 2026 raise the contracted power from 500 MW to 1 and move the second 500 MW phase from 2030 to 2029, subject to Kentucky PSC approval (8-K filed Oct 5; the Q2 10-Q had already called the agreement 1,000 MW)) and Morgantown MD (the Q3 10-Q: FERC authorized the purchase on Jul 29 2026 but 'certain other closing conditions and required consents remain outstanding' — FERC EC26-58, where TeraWulf told the Commission 'Google does not own any equity in TeraWulf'). Converts and the April-2026 equity raise are parent-level, not in any record.