Why it matters
Google's guarantee helped Cipher borrow against Fluidstack's lease at the Barber Lake data center. Cipher booked the guarantee at $544.5M and borrowed exactly $1.733B at 7.125%, covering ~71% of the cost. Cipher also promised to make up any shortfall in shares or cash if Google's were worth less than $435M when they first became exercisable.
Tap a figure for the line in its source.
Fluidstack gives Cipher Digital
- of rent over the 10-year base term, with two 5-year extension options
Cipher Digital gives
- 207 MWof computing load — the whole 300 site near Colorado City, Texas → Fluidstack
- of Cipher as rights to buy about 24 million shares at $0.01 each → Google
- floor on those shares' value when they open; Cipher pays any gap in shares or cash → Google
Google gives Cipher Digital
- promise to cover Fluidstack's rent if it defaults, effective only once rent starts
What happened
Cipher, a bitcoin miner now called Cipher Digital, is building a data center at Barber Lake near Colorado City, Texas. It leased the whole 300-megawatt site to a Fluidstack subsidiary for ten years. The agreement was signed in two steps in September and November 2025. The lease covers 207 megawatts of power for computing equipment and about $3.8 billion in rent over the initial term. Cipher borrowed $1.733 billion against the lease. Google promised to cover up to $1.73 billion of Fluidstack's rent if Fluidstack defaults. Google received , or rights to buy about 24 million Cipher shares at one cent each. Those shares represent about 5.4% of Cipher. Cipher promised that the shares would be worth at least $435 million when Google could first use the warrants. Cipher would make up any shortfall in shares or cash. Anthropic has not been named as the tenant or the user. In September 2026, Anthropic joined Cipher and Fluidstack in giving $10 million to fix the town's water system.
Sources 12 documents — 10 SEC filings · 1 company release · 1 research note
Research trail Found 646 documents and read 383 of them while checking this deal and related ones.
- States 4 figures: 300 MW gross capacity · 244 MW phases · backstop timing · $1733M project notes
- States 3 figures: 168 MW critical IT phase 1 · $3B original value · 5.4% pro forma equity
- States 3 figures: 39 MW critical IT expansion · $3.8B base term value · $1.73B google backstop
- States 2 figures: google warrants · $544.5M backstop asset
- States tenant
- States lease term
- States warrant pledge
- States $435M top up floor
- States 71% loan to cost
- States $10M anthropic presence
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: Cipher 8-Ks Sep 25 and Nov 20 2025 (Items 1.01 filed; releases furnished) + A&R warrant ex-4.1; FY-2025 10-K, Q1/Q2-2026 10-Qs; Feb-2026 business update (furnished); Cipher/Fluidstack/Anthropic release (Sep 14 2026) (read 2026-09) · as of Sep 2026
The evidence 18 sourced figures · 3 disputes
The record's headline Cipher–Fluidstack, Barber Lake (Colorado City TX): 207 of critical IT (300 MW gross) for 10 years, ~$3.8B — Google $1.73B and holds 24,178,576 penny (~5.4%) with a $435M value floor; $1.733B 7.125% notes; Anthropic on the record only as a co-donor to the town's water system
- Size
- ~$3.8B base term (10 yrs; ~$9.0B with all options) · 207 MW critical IT / 300 MW gross · Google backstop $1.73B · 24,178,576 penny warrants (~5.4%), $435M top-up floor · $1.733B 7.125% notes
- When
- Sep 24–25 2025 lease + backstop + warrants → Nov 13 2025 $1.4B notes → Nov 20 2025 expansion + A&R warrant ($435M floor) → Nov 24 2025 $333M tack-on → Oct 2026 target lease start → Sep 14 2026 water commitment with Anthropic
- Status
- signed Sep 24–25 2025, expanded Nov 20 2025; notes issued Nov 13 and Nov 24 2025; lease start targeted Oct 2026 (Cipher, Feb 2026), the added 39 MW by Jan 2027; not yet energized in Epoch's Jul 2026 imagery
- Structure
- one site leased whole in two steps: the Sep 2025 Datacenter Lease (168 MW critical IT / 244 MW gross, ~$3.0B) and the Nov 2025 amendment (+39 MW / +56 MW gross, ~$830M) between Cipher Barber Lake LLC and Fluidstack USA II Inc. — 'the entire 300 MW of capacity'; 10-year base term from commencement + two 5-year extensions; modified gross lease with annual escalators. Google backstops Fluidstack's obligations under a Recognition Agreement (Sep 24 2025; amended and restated Nov 20 2025), effective only after rent commencement, and takes penny warrants with a value floor — if the warrant shares are worth less than $435M when exercise opens, Cipher issues more shares or pays cash — which Google pledges to the noteholders through construction, released at commencement. Project debt at Cipher Compute LLC, non-recourse, amortizing from rent
- Programme
- Fluidstack leases, Google backstop
- Parties
- Fluidstack tenant — Fluidstack USA II Inc., leasing the whole 300 MW site · Cipher Digital landlord and developer (Cipher Barber Lake LLC); notes issuer (Cipher Compute LLC); warrant issuer · Google backstop provider ($1.73B) and warrant holder (24,178,576 at $0.01, $435M floor) — not a lease party
- Record
- disclosed / primary source · as of Sep 2026
Flows 4 as the record states them
- Fluidstack → Cipher Digitallease-payments~$3.8B over the 10-year base term (~$3.0B Sep 2025 + ~$830M Nov 2025); '~$9.0 billion of total contract value across the partnership if all extension options are exercised' (Cipher) vs Sacra's 'up to $7.8B' (contested); rent from commencement (target Oct 2026)
- Cipher Digital → Fluidstackcapacity207 MW critical IT / 300 MW gross — Phase I 168 MW / 244 MW gross, Phase II 39 MW / 56 MW gross — on 250 acres near Colorado City TX
- Google → Cipher Digitalguarantee$1.73B backstop of Fluidstack's lease obligations ($1.4B + $333M) — the same $1.733B as the notes it supports; effective only after rent commencement
- Cipher Digital → Googlewarrants24,178,576 warrants at $0.01 (~5.4% pro forma), exercisable from lease commencement, expiring Sep 24 2030; value floor $435M (A&R); pledged by Google to the noteholders' collateral agent until commencement (indenture); booked by Cipher as a $544.5M asset — 'the value of Google agreeing to make the lease payments'
Resolved figures 18 each with the verbatim line from its document
- tenantFluidstack USA II Inc. is the tenant of Cipher Barber Lake LLC's facility — named in the filed Item 1.01, with the Cipher Barber Lake / Fluidstack USA II / Google Recognition Agreement filed as ex-10.1. Anthropic appears in no Cipher filing about the lease
“On September 25, 2025, Cipher Mining Inc. (the “Company”) announced that its wholly owned indirect subsidiary Cipher Barber Lake LLC (“Cipher Barber Lake”) had entered into a Datacenter Lease (the “Fluidstack Lease”) with Fluidstack USA II Inc. (“Fluidstack”)”
Cipher Mining 8-K Item 1.01 (filed 2025-09-25) · sec.gov - gross-capacity300 MW300 MW gross on 250 acres — all of it Fluidstack's after the Nov 2025 amendment
“The Barber Lake Facility is being constructed on 250 acres of land owned by Cipher Barber Lake, and will have a gross capacity of 300 MW.”
Cipher Digital FY-2025 10-K · sec.gov - phases244 MWPhase I 244 MW gross, Phase II 56 MW gross — the filed split; the critical-IT figures (168 + 39 = 207 MW) are in the furnished releases only. DCD's '244MW' is Phase I's gross, not IT
“244 MW of gross capacity will be allocated to Fluidstack in Barber Lake Phase I, and the remaining 56 MW will be allocated to Fluidstack in Barber Lake Phase II.”
Cipher Digital FY-2025 10-K · sec.gov - critical-it-phase-1168 MW168 MW of critical IT on a maximum 244 MW gross, delivery 'by September of 2026' in the original release. Furnished
“Under the agreement, Cipher will deliver 168 MW of critical IT load, supported by a maximum of 244 MW of gross capacity, at its Barber Lake site in Colorado City, Texas.”
Cipher release, Sep 25 2025 (8-K ex-99.1, furnished) · sec.gov - critical-it-expansion39 MW+39 MW of critical IT on +56 MW gross — 'Fluidstack will … lease the entire 300 MW of capacity' → 207 MW critical IT in total; the added megawatts due by Jan 2027. Furnished
“Under the agreement, Cipher will deliver an additional 39 MW of critical IT load, supported by a maximum of 56 MW of additional gross capacity, at its Barber Lake site in Colorado City, Texas.”
Cipher release, Nov 20 2025 (8-K ex-99.1, furnished) · sec.gov - lease-term10 years10 years from commencement plus two 5-year extensions — FILED
“Fluidstack’s obligations to pay rent under the lease begins on the commencement date of the lease and will continue for a 10-year term, as well as for the two five-year extension options, as applicable.”
Cipher Digital Q1-2026 10-Q · sec.gov - original-value$3B~$3B over the initial 10-year term of the Sep 2025 lease (~$7B with both extensions). Furnished
“The agreement represents approximately $3 billion in contracted revenue over the initial 10-year term and includes two five-year extension options.”
Cipher release, Sep 25 2025 (8-K ex-99.1, furnished) · sec.gov - base-term-value$3.8B~$3.8B over the initial 10-year term — ~$3.0B + ~$830M from the Nov 2025 expansion; the figure Cipher repeats in every later deck ('~$3.8Bn lease with Fluidstack/Google'). Furnished only: Cipher's 10-K and 10-Qs never state a dollar value for the lease
“Total Contracted Revenue Across the Partnership Reaches ~$3.8 Billion Over Initial 10-Year Term”
Cipher release, Nov 20 2025 (8-K ex-99.1, furnished) · sec.gov - google-backstop$1.73B$1.73B = $1.4B (Sep 2025) + $333M (Nov 2025) — exactly the notes it supports ($1,400.0M + $333.0M). TheNextWeb's '$1.4bn in Texas' (Jul 2026) is the pre-expansion figure. Furnished; the filed 10-K describes the backstop without an amount
“Google Expands Backstop of Fluidstack’s Obligations by Additional $333 Million, Increasing Total Backstop to $1.73 Billion”
Cipher release, Nov 20 2025 (8-K ex-99.1, furnished) · sec.gov - backstop-timingthe landlord's own risk factor: the guarantee does nothing before rent starts, and it has triggers and caps — so through construction what the noteholders hold of Google's is the pledged warrants (see warrant-pledge), not the guarantee
“Our tenants’ guarantees and other backstop arrangements under our HPC leases will only be effective after rent commencement under such leases and are subject to certain limitations, like event of default triggers or caps.”
Cipher Digital FY-2025 10-K — Risk Factors summary · sec.gov - google-warrants24,178,57624,178,576 Cipher shares at $0.01, 'as consideration for Google agreeing to backstop certain obligations of Fluidstack', exercisable from lease commencement to Sep 24 2030
“On September 24, 2025, as consideration for Google agreeing to backstop certain obligations of Fluidstack in connection with the Barber Lake Facility lease, the Company entered into the Google Warrant Agreement, pursuant to which the Company issued to Google warrants to purchase 24,178,576 shares (the “Warrant Shares”) of the Company’s Common Stock for an exercise price of $0.01 per share of Common Stock (the “Google Warrants”).”
Cipher Digital Q2-2026 10-Q · sec.gov - warrant-pledgethe same double duty as Lake Mariner's warrants: under the notes indenture Google pledges its Cipher warrants (defined there as the 24,178,576) to the noteholders' collateral agent, Wilmington Trust, for the Construction Period, and the lien on them is released 'upon the occurrence of the Commencement Date' (§12.04(a)(8)) — the day the backstop of the rent takes effect. On paper only in the filed indenture — Cipher's FY-2025 10-K and Q1/Q2-2026 10-Qs never mention it
““Google Warrant Pledge Agreement” means the Google Warrant Pledge Agreement, dated as of the Issue Date, between the Issuer, Google and the Collateral Agent relating to the pledge by Google of the Warrants during the Construction Period”
Cipher Compute LLC indenture, 7.125% senior secured notes due 2030 (8-K ex-4.1, filed 2025-11-13) · sec.gov - pro-forma-equity5.4%~5.4% 'pro forma equity ownership stake', 'subject to adjustment and a potential cash settlement' — unexercised penny warrants, not a shareholding (no Alphabet/Google 13D/13G on Cipher). Furnished
“In addition, Google will backstop $1.4 billion of Fluidstack’s lease obligations to support project-related debt financing and will receive warrants to acquire approximately 24 million shares of Cipher common stock, equating to an approximately 5.4% pro forma equity ownership stake, subject to adjustment and a potential cash settlement under certain circumstances.”
Cipher release, Sep 25 2025 (8-K ex-99.1, furnished) · sec.gov - top-up-floor$435M$435M: if the warrant shares are worth less than this when exercise opens, Cipher issues more shares or pays the shortfall in cash — a floor under Google's consideration. Confirmed in the executed A&R warrant (8-K ex-4.1 §3.08: 'does not exceed $435 million'). The FY-2025 10-K and Q2-2026 10-Q still describe the ORIGINAL agreement at '$430.0 million' and never mention the A&R; the executed instrument is operative
“Under the A&R Warrant Agreement, the Top-Up Threshold was adjusted from $430 million to $435 million.”
Cipher Mining 8-K Item 1.01 (filed 2025-11-20) · sec.gov - backstop-asset$544.5MCipher's own price for Google's guarantee: a $544.5M asset at the warrants' issuance fair value, amortized over the lease. The warrants then swing through earnings — a $525.16M liability at Dec 31 2025, $632.06M at Jun 30 2026 (balance sheet, in thousands); a $150.5M loss in Q2-2026 after a $43.6M gain in Q1
“The Company recorded an asset of $544.5 million in Other noncurrent assets on the condensed consolidated balance sheets at the initial fair value of the Google Warrants at issuance to represent the value of Google agreeing to make the lease payments from Fluidstack in the event of Fluidstack not fulfilling its obligations under the lease.”
Cipher Digital Q2-2026 10-Q · sec.gov - project-notes$1733M$1,733.0M of 7.125% senior secured notes due Nov 15 2030 at Cipher Compute LLC ($1,400.0M Nov 13 + $333.0M tack-on Nov 24 2025), non-recourse, amortizing from rent; plus $477M of Cipher equity 'in connection with the financings' (Q4-2025 call)
“Additionally, in November 2025, Cipher Compute LLC, our wholly owned indirect subsidiary, incurred $1,733.0 million of indebtedness from offerings of $1,400.0 million and $333.0 million of our senior secured notes due 2030.”
Cipher Digital FY-2025 10-K · sec.gov - loan-to-cost71%~71% loan-to-cost at 7.125% (high yield) for the Fluidstack/Google site — against ~85% at 6.125% for the $2.0B Black Pearl bond, where Amazon Web Services is the tenant itself (same deck). What a guaranteed neocloud tenant borrows at, next to a hyperscaler tenant. Furnished
“$1.73 Bn Issuance at Par 7.125 % Coupon 2030 Nov. Maturity Date ~71 % Loan -to-Cost”
Cipher business update, Feb 2026 (8-K ex-99.1, furnished) · sec.gov - anthropic-presence$10MAnthropic's only appearance on Barber Lake's record: co-donor with Cipher and Fluidstack of $10M to Colorado City's water system, 'stepping forward to help their new neighbors'; Anthropic's Head of Economic Development: 'Communities that host AI infrastructure should be better off for it.' Presence in the town — not a lease, and not a statement of whose chips the building runs. So Anthropic is not a participant in this record — that would list the $3.8B lease among Anthropic's deals; this cell carries the tie at the tier Cipher gives it
“COLORADO CITY, Texas, Sept. 14, 2026 (GLOBE NEWSWIRE) -- Cipher Digital Inc. (NASDAQ:CIFR), a leading developer and operator of industrial-scale data centers, Fluidstack Ltd., an American builder of AI infrastructure, and Anthropic, the AI research and development company behind Claude, today committed a combined $10 million in repairs and upgrades to Colorado City's water system.”
Cipher Digital / Fluidstack / Anthropic joint release (GlobeNewswire, Sep 14 2026) · globenewswire.com
Contested figures 3 not reconciled — every position side by side, with its source and tier
Scope note what this record leaves to other records
NOT this record: Cipher's AWS lease at Black Pearl (~$5.5B, 15 years, 300 MW gross; $2.0B 6.125% notes — the comparator in loan-to-cost) and the Q4-2025 '$9.3B' two-lease total (= 3.8 + 5.5); the third lease signed in 2026 (100 MW, per the Q1-2026 call); the 500 MW '2030 and beyond' Barber Lake expansion (uncontracted). TCEQ generator permits (four buildings × 30 diesel generators; 32 more requested May 2026) are site colour. Not adopted: TNW's '$1.4bn in Texas' (stale); DCD's '244MW project' (gross, not IT); Epoch's 'is operational' line (a projection dated Dec 30 2026).