Entergy Louisiana

Meta signed 15- and 20-year power contracts with Entergy Louisiana, which plans about 7.5 of new gas plants for Meta's Hyperion campus; Meta's total payments are not public.

A deal between Meta, Entergy Louisiana

Why it matters

Meta's long-term power contracts turn Hyperion's need for power into a utility buildout. Two shell subsidiaries commit to fifteen and twenty years of load, and Entergy fast-tracks 7.5 of gas. The political case rests on calculations of projected benefits to utility customers while Meta's own dollar commitment stays redacted.

Tap a figure for the line in its source.

Entergy Louisiana gives Meta

  • from three new gas units entering service 2028–29, plus a ~$546M power line
  • from seven more gas units costing about $12.9B, filed for approval in Mar 2026

Meta gives Entergy Louisiana

  • toward Entergy's existing costs over the 20-year contract, plus $695M for storm costs
  • to Entergy's bill-assistance and energy-efficiency programs

Oct 30, 2024 filed by Entergy Louisiana with the state regulator, its customer unnamedupdated Nov 20, 2026Laidley ESA approved Aug 2025 disclosed by the parties

What happened

Two Meta shell subsidiaries signed 15- and 20-year electricity contracts with Entergy, Louisiana's utility. Entergy plans ~7.5 of new gas plants and transmission lines for the Hyperion campus. It plans to recover the cost through its regulated rates. The public filings black out what Meta pays in total. The political case for the buildout rests on calculations of the projected benefits to utility customers.

Sources 6 documents — 3 regulatory filings · 2 company releases · 1 SEC filing

Research trail Found 209 documents and read 205 of them while checking this deal and related ones.

  1. Louisiana PSC · regulatory filinglpscpubvalence.lpsc.louisiana.gov
    States $695M evest ESA terms
  2. Louisiana PSC · regulatory filinglpsc.louisiana.gov
    States 2,262 MW phase1 generation
  3. SEC filingsec.gov
    States 5,278 MW phase2 generation
  4. company releasedatacenters.atmeta.com
    States $215M affordability funding
  5. company releaseentergy.com
    Cited by the record; no single figure is quoted from it.
  6. regulatory filinglpscpubvalence.lpsc.louisiana.gov
    Cited by the record; no single figure is quoted from it.

The record's own summary of its sourcing: LPSC U-37425 (application filed Oct 30 2024; order decided Aug 20 2025) + Evest application (public redacted) + LPSC transcripts + Entergy 10-K/10-Q · as of Mar 2026

The evidence 4 sourced figures · 2 disputes

The record's headline Entergy Louisiana: two Meta ESAs, ~7.5 of new gas for Hyperion

Size
2,262 MW + 5,278 MW
When
Aug 2025 (Laidley) + Mar 2026 (Evest)
Status
Laidley ESA approved Aug 2025; the Evest ESA takes effect only on LPSC approval, its 5,278 MW awaiting certification (Entergy Q1 2026 10-Q)
Structure
two electric service agreements (two Meta shell subsidiaries)
Programme
Meta buildout
Parties
Meta load customer — Laidley LLC (15-yr ESA) + Evest LLC (20-yr ESA) · Entergy Louisiana utility (builds, rate-recovers, matches affordability funds)
Site
Meta Hyperion
Record
disclosed / primary source · as of Mar 2026

Resolved figures 4 each with the verbatim line from its document

  • evest-esa-terms$695M
    Evest ESA (the 20-yr): >$1B embedded-cost contribution + $695M storm/resilience over the term. The SEPARATE Laidley ESA (U-37425, settled 8/2025) is the 15-yr with up to three 5-yr extensions
    “over the twenty-year Original Term of the ESA, the Customer will also contribute more than $1 billion toward ELL's embedded cost of service through base rates and the Company's Formula Rate Plan ("FRP") and will also contribute an additional $695 million toward storm and resilience costs on current customer bills”
    ELL direct testimony (LPSC, public redacted) · lpscpubvalence.lpsc.louisiana.gov
  • phase1-generation2,262 MW
    3 CCCTs totaling 2,262 MW, in service 2028-29 (Entergy PR's '2,260 MW' is rounding); ~$546M new 500kV line
    “three combined cycle combustion turbines, totaling 2,262 megawatts”
    LPSC hearing transcript 8/20/2025 · lpsc.louisiana.gov
  • phase2-generation5,278 MW
    7 CCCTs × 754 MW = 5,278 MW ≈ $12.9B (itemization: Richland 1&2 $3,487M + 3&4 $3,622M + Pointe Coupee 1-3 $5,802M; the filed total row is REDACTED in the public LPSC version — $12.9B is the components' sum, stated whole only in Entergy's 10-Q); WFC–St. Landry 500kV line $1,395M
    “Also in March 2026, Entergy Louisiana filed an application with the LPSC for certification to construct seven new combined cycle combustion turbine generation resources totaling 5,278 MW at a total cost of approximately $12.9 billion”
    Entergy 10-Q (etr-20260331) · sec.gov
  • affordability-funding$215M
    $215M Meta total across programs — composition ($140M efficiency + $60M Power to Care + ~$15M Laidley) is arithmetic no single source states; ELL matches PtC dollar-for-dollar ($120M matched total is a DIFFERENT measure). Ratepayer benefit: $650M (Laidley) + ~$2B (Evest) ≈ $2.65B combined
    “We've also contributed $215 million to Entergy's low- and fixed-income bill assistance and energy efficiency programs.”
    Meta Richland Parish page · datacenters.atmeta.com

Contested figures 2 not reconciled — every position side by side, with its source and tier

phase1-costone entry, in its own words
$3.2B (LPSC hearing, plants only) → ≥$3.7B (UCS, incl. infrastructure) → ~$4B (DataCenterFrontier, no stated scope; its '$1.2B 100-mile line' matches no filed figure) LPSC transcript / UCS / DCF
meta-committed-dollarsone entry, in its own words
Meta's own committed $ under the ESAs is in no public filing: the ESA is filed with the LPSC as 'Highly Sensitive Protected Materials' and the testimony is public only as a redacted version — minimum-bill mechanics are described only qualitatively; the est ribbon uses the filed build cost as proxy LPSC filings

More between Meta and Entergy Louisiana

The record holds no other deal between them.