Why it matters
Google stands behind ~$3.2B of Fluidstack's rent and is a party to none of the three leases. As payment it received penny for ~14% of TeraWulf, which it pledged to the bondholders to secure construction debt until the guarantee takes effect. The filings never say whose computers will fill the 378 .
Tap a figure for the line in its source.
Fluidstack gives TeraWulf
- of rent over three 10-year leases; ~$15–16B if all are extended
TeraWulf gives
- of data-center capacity in three New York buildings; the first delivered Jul 2026 → Fluidstack
- that Google may buy at $0.01 each — about 14% of TeraWulf if all are exercised → Google
Google gives TeraWulf
- promise to cover the leases if Fluidstack defaults; $600M in force since Jul 2026
- pledged those share rights to TeraWulf's lenders until its guarantee starts
What happened
TeraWulf, a former bitcoin miner, is building three data center buildings at its Lake Mariner site in western New York. It leased all three to a subsidiary of the cloud company Fluidstack for ten years. The leases cover 378 megawatts of computing load and about $6.7 billion in rent over the first ten years. Fluidstack is a young company without a long credit record, so Google agreed to step in if Fluidstack stops paying. Google would cover up to about $3.2 billion by paying a termination fee or taking over the lease itself. In return, TeraWulf gave Google , or rights to buy 73.58 million TeraWulf shares at one cent each. That would amount to roughly 14% of TeraWulf if Google exercises them. Google pledged the warrants to the lenders behind TeraWulf's $3.2 billion construction bond until the guarantee takes effect. The first building was handed over in July 2026. No TeraWulf filing identifies whose computers Fluidstack will run there. The press and analysts guess it's Anthropic.
Sources 13 documents — 11 SEC filings · 1 transcript · 1 press report
Research trail Found 854 documents and read 576 of them while checking this deal and related ones.
- States 7 figures: 378 MW critical IT load · lease term · google warrants · warrant pledge · 102 MW energized · $728.4M warrant gain Q3 · $1.1M backstop amortization
- States 3 figures: tenant and leases · $844.7M warrant liability · $3200M project notes
- States 3 figures: $6.7B base term value · $3.2B backstop total · 14% pro forma equity
- States 2 figures: 336 MW under construction · $8–10M cost per MW low end
- States 2 figures: $600M backstop effective · $500M amendments
- States $3.7B first two leases value
- States backstop mechanics
- States ferc no ownership
- States $755.7M warrant loss 2026
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: TeraWulf 8-Ks Aug 14 and Aug 18 2025 (Items 1.01 filed; ex-99.1 releases furnished), FY-2025 10-K, Q2-2026 10-Q, Q3-2025 investor update (furnished), Q2-2026 call; FERC order EC26-58 (Jul 29 2026) (read 2026-09); TeraWulf Q3-2026 release and investor update, furnished (2026-11-06) (updated 2026-11-06); TeraWulf Q3-2026 10-Q (2026-11-06) (updated 2026-11-08) · as of Nov 2026
The evidence 21 sourced figures · 4 disputes
The record's headline TeraWulf–Fluidstack, Lake Mariner (Barker NY): three 10-year leases for 378 of critical IT, ~$6.7B base term — Google ~$3.2B of the tenant's rent and holds 73,580,000 penny in the landlord, pledged to the landlord's noteholders until the backstop starts; no TeraWulf filing names Anthropic
- Size
- ~$6.7B base term (three 10-yr leases; ~$15–16B with extensions) · 378 MW critical IT · Google backstop ~$3.2B · 73,580,000 penny warrants (~14% pro forma) · $3.2B 7.75% notes
- When
- Aug 13–18 2025 leases + backstop + warrants → Oct 22 2025 $3.2B notes → Jul 2026 amendments and CB-3 delivery → CB-4 target Nov–Dec 2026, CB-5 target Q1 2027 (Nov 6 2026 update); 10-yr terms + 2 × 5-yr options
- Status
- signed Aug 13 (CB-3/CB-4) and Aug 18 2025 (CB-5); CB-4/CB-5 upsized 162 → 168 MW each and a tenant fit-out amendment executed Jul 2026; CB-3 delivered Jul 2026, triggering $600M of Google's support; Nov 6 2026 update: CB-4 phased delivery and rent commencement due in Q4 2026 (deck: Nov–Dec), CB-5 targeted for early 2027 (deck: Q1 2027); the Q3 10-Q agrees — one of the three leases had commenced at Sep 30 2026, the rest due 'in the fourth quarter of 2026 and in early 2027'
- Structure
- three data-center leases (buildings CB-3, CB-4, CB-5) between TeraWulf's Akela Data LLC and Fluidstack USA I Inc., each 10 years from its building's delivery + two 5-year renewals. Google is a party to none of them: it signs a Recognition Agreement per lease under which, on a Fluidstack payment default or insolvency, it may pay the lease's termination fee or pay the rent due and assume the lease as tenant — effective only from that lease's commencement. Its consideration is penny warrants over TeraWulf stock, pledged by Google to the lenders of TeraWulf's $3.2B WULF Compute notes until the backstop becomes effective
- Programme
- Fluidstack leases, Google backstop
- Parties
- Fluidstack tenant — Fluidstack USA I Inc., named in TeraWulf's 8-K Item 1.01 and every periodic report since; its own customer at this site is named in no party document · TeraWulf landlord and developer (Akela Data LLC); borrower of the $3.2B 7.75% notes (WULF Compute LLC); issuer of the Google warrants · Google backstop provider and warrant holder — customer in none of the leases; told FERC via TeraWulf that it owns no TeraWulf equity
- Record
- disclosed / primary source · as of Nov 2026
Flows 4 as the record states them
- Fluidstack → TeraWulflease-payments~$6.7B over the initial 10-year terms of the three leases (TeraWulf, Aug 18 2025 — ~$3.7B for CB-3/CB-4 on Aug 14, then CB-5); ~$16B with extensions per the same release, ~$15B per the Q3-2025 investor update (contested). The Jul 2026 amendments add '>$500M' over the terms; no restated total exists. Rent starts per building on delivery
- TeraWulf → Fluidstackcapacity378 MW critical IT — CB-3 42 MW + CB-4 168 MW + CB-5 168 MW (10-K; Q2-2026 10-Q) at the Lake Mariner Data Campus, Barker NY; CB-3 delivered Jul 2026
- Google → TeraWulfguarantee~$3.2B backstop of Fluidstack's lease obligations ($1.8B for CB-3/CB-4 + $1.4B for CB-5, each 'in support of project-related debt financing'), each tranche effective from its lease's commencement; $600M effective after CB-3's completion (Q2-2026). On default: pay the termination fee, or pay the rent due and assume the lease
- TeraWulf → Googlewarrants73,580,000 warrants at $0.01 (41,011,803 for CB-3/CB-4 + 32,568,197 for CB-5; ~14% pro forma), expiring Aug 13 and Aug 17 2030; fair value $515.5M at issuance, carried as a $844.7M liability at Dec 31 2025
Resolved figures 21 each with the verbatim line from its document
- tenant-and-leases3three leases between TeraWulf's Akela Data LLC and Fluidstack USA I Inc. — CB-3 and CB-4 signed Aug 13 2025, CB-5 on Aug 18 after Fluidstack 'exercised its option to expand'. The tenant is named in every filing; its customer in none: TeraWulf's Q2-2026 deck labels the capacity 'Fluidstack (LMD)' next to 'Anthropic (Hawesville)'
“In August 2025, Akela entered into three data center lease agreements (the “Akela Fluidstack Leases”) with Fluidstack USA I Inc. (together with its affiliates, “Fluidstack”), a leading AI cloud platform.”
TeraWulf FY-2025 10-K · sec.gov - critical-it-load378 MW378 MW of critical IT — a build-up, not a dispute: 'more than 200 MW' at signing (CB-3 42 + CB-4 162), 'over 360' / 366 MW with CB-5 (162), 378 after CB-4 and CB-5 were each upsized from 162 to 168 MW (announced Feb 2026, executed Jul 2026). The '450 MW' and '380' labels in TeraWulf's releases are contested below. Core42's separate leases at the same campus make the '438 MW of contracted critical IT HPC capacity' (60 + 378) — never Fluidstack's. The Q3-2026 10-Q says that sum itself ('Collectively, La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus', MD&A) and calls the 378 MW the Akela leases 'as amended'
“Under the Akela Fluidstack Leases, as amended, we agreed to provide 378 MW of critical IT load at the Lake Mariner Data Campus, which represents the majority of the remaining contracted HPC capacity at the Lake Mariner Data Campus.”
TeraWulf Q3-2026 10-Q, MD&A — Lake Mariner Data Campus · sec.gov - lease-term10 years10 years from each building's delivery, plus two 5-year renewal options — so the base terms end ~2036–2037, after the WULF Compute notes mature (Oct 15 2030). Restated unchanged in the Q3-2026 10-Q, which also says the July 2026 amendments make the two upsized leases commence 'on a data hall-by-data hall basis' (amendments) — the term is still the lease's, and the 10-Q does not say how a hall-by-hall start moves the end
“Each Fluidstack HPC Lease includes an initial 10-year term and two five-year renewal options.”
TeraWulf Q3-2026 10-Q, Note 8 — Leases · sec.gov - first-two-leases-value$3.7B~$3.7B over the initial terms of CB-3/CB-4 (~$8.7B with extensions) — the Aug 14 2025 stage, before CB-5. Furnished release only (Item 7.01), never filed. Tier 1 all the same: TeraWulf's own release, read from its own copy on EDGAR
“The agreements represent approximately $3.7 billion in contracted revenue over the initial 10-year terms and include two five-year extension options which, if exercised, would bring the total contract revenue to approximately $8.7 billion.”
TeraWulf release, Aug 14 2025 (8-K ex-99.1, furnished) · sec.gov - base-term-value$6.7B~$6.7B over the initial 10-year terms of all three leases — TeraWulf's figure, restated unchanged in its Q3-2025 release and investor update ('~$6.7B total contracted revenues', '~$570MM average annual NOI'). Furnished-only: no TeraWulf 10-K or 10-Q states a dollar value for these leases. Tier 1 all the same, as TeraWulf's own release read from its own copy on EDGAR, and its ribbon is solid. The Jul 2026 amendments add '>$500M' (see amendments); no restated total is disclosed, so $6.7B is the signing value (the Nov-6 2026 deck's '~$8B' is the campus's contracted revenue with Core42's leases included — see the note — not a restated total for these three)
“Total Contracted Capacity Increases to Over 360 MW of Critical IT Load Represents $6.7 Billion in Contracted Revenue, with Potential to Reach $16 Billion with Lease Extensions”
TeraWulf release, Aug 18 2025 (8-K ex-99.1, furnished) · sec.gov - backstop-total$3.2B~$3.2B — a SEQUENCE, not a range: $1.8B for CB-3/CB-4 (Aug 14) + $1.4B for CB-5 (Aug 18). The Telegraph's '$1.8bn backstop' (Apr 2026, via Yahoo) is the superseded first tranche; Forbes' '$3.2 billion' deal value is this number (and, separately, the WULF notes), never the lease value. Furnished release only — the filed 8-Ks describe the backstop without an amount; tier 1 all the same, TeraWulf's own release read from its own copy on EDGAR. The Nov-6 2026 Q3 deck restates it unchanged in its campus tile ('~$3.2B Google backstop (WULF Compute)', furnished)
“With this incremental commitment, Google’s total backstop increases to approximately $3.2 billion, and its total pro forma equity ownership in TeraWulf increases to approximately 14%.”
TeraWulf release, Aug 18 2025 (8-K ex-99.1, furnished) · sec.gov - backstop-mechanicswhat Google actually promised, in the FILED 8-K: per lease, effective only from that lease's commencement; on a Fluidstack payment default or insolvency, Google chooses between paying the termination fee and paying the rent due and taking the lease over as tenant. Not a guarantee of the $6.7B — of a termination payment or of stepping into the tenancy
“The Google BackStop under each Google Recognition Agreement will become effective as of the commencement date under the corresponding Fluidstack Lease. In the event of a payment default under a Fluidstack Lease, or if Fluidstack becomes subject to an insolvency event, following notice from Akela, Google will have the option to either (i) pay the termination fee under such Fluidstack Lease or (ii) pay all rent currently due under the Fluidstack Lease and assume the Fluidstack Lease as the tenant thereunder.”
TeraWulf 8-K Item 1.01 (filed 2025-08-14) · sec.gov - backstop-effective$600M$600M of Google's support became effective when CB-3 was completed (Jul 2026) — the first money actually behind the rent; the rest waits on CB-4 and CB-5. On the call, not only in the furnished release. The Q3-2026 10-Q (filed) gives the mechanism but no amount: the Google Backstop 'becomes effective as of the commencement date under the corresponding Fluidstack HPC Lease', and one of the three leases had commenced by Sep 30 2026
“Importantly, completion of CB-3 also satisfied the applicable conditions for $600 million of Google's credit support for FluidStack's lease obligations to become effective.”
TeraWulf Q2-2026 earnings call (Motley Fool transcript) · fool.com - google-warrants73,580,00073,580,000 TeraWulf shares at $0.01 — 41,011,803 for CB-3/CB-4 (expiring Aug 13 2030) + 32,568,197 for CB-5 (Aug 17 2030), exercisable from the earlier of each lease's commencement or 180 days after its target date. Restated unchanged in the Q3-2026 10-Q, which adds the first tranche to open: 'During the three and nine months ended September 30, 2026, 8,443,606 of the Google Warrants became exercisable upon the commencement date of one of the Fluidstack HPC Leases' — about 11% of the 73.58M, and within one share of 42/204 of the CB-3/CB-4 block's 41,011,803 (CB-3's 42 MW of the pair's 204 MW at signing; our arithmetic — the 10-Q gives no allocation formula, and says nothing of whether Google has exercised any). The Q3-2025 deck's '73,722' (thousands) counts ALL of TeraWulf's $0.01 warrants, not Google's alone
“In consideration of Google providing the Google Backstop, the Company entered into Warrant Agreements with Google, pursuant to which the Company issued to Google Warrants (the “Google Warrants”) to purchase a total of 73,580,000 shares of Common Stock for an exercise price of $0.01 per share of Common Stock.”
TeraWulf Q3-2026 10-Q, Note 8 — Leases · sec.gov - warrant-pledgethe warrants do double duty: until the backstop turns on, Google has pledged them to the lenders financing construction — the 10-Q ties the pledge to the $3,200.0M 2030 notes (Wilmington Trust as collateral agent). The deck's '~$850M warrant pledge (~14% WULF equity)' is TeraWulf's furnished valuation of the same pledge. The Q3-2026 10-Q repeats the sentence and, in its debt note (Note 10), says when the lenders' hold ends: 'The security interests associated with the Google Warrants shall automatically terminate and/or be released upon the earlier of (i) the occurrence of the commencement date of the respective Fluidstack HPC Leases or the (ii) the payment and discharge in full of the 2030 Secured Notes' — 'respective' reads as each lease's commencement releasing the lien on its own warrants (our reading); the first lease commenced in Q3, when 8,443,606 warrants became exercisable (google-warrants), but the 10-Q does not say that lien was released
“As a condition to receiving the Google Warrants prior to the effective date applicable to the Google Backstop, Google has agreed to pledge the Google Warrants for the benefit of the lenders under certain financing transactions in connection with construction of the HPC buildings pursuant to a customary warrant pledge agreement until such time as the Google Backstop becomes effective.”
TeraWulf Q3-2026 10-Q, Note 8 — Leases · sec.gov - pro-forma-equity14%'~14%' is 'total pro forma equity ownership' on exercise of unexercised penny warrants (~8% after the first tranche) — not a shareholding. TeraWulf's own furnished release (tier 1); the same sentence as backstop-total
“With this incremental commitment, Google’s total backstop increases to approximately $3.2 billion, and its total pro forma equity ownership in TeraWulf increases to approximately 14%.”
TeraWulf release, Aug 18 2025 (8-K ex-99.1, furnished) · sec.gov - ferc-no-ownershipthe regulator's reading, Jul 29 2026 (EC26-58, TeraWulf's Morgantown MD purchase): TeraWulf told FERC 'Google does not own any equity in TeraWulf' and the warrants confer no present ownership, voting rights or control; the Commission accepted that the unexecuted warrants convey neither. So the record never writes 'Google owns 14% of TeraWulf'. No Alphabet/Google Schedule 13D/13G on TeraWulf exists (EDGAR, Aug 2025 → Sep 2026)
“Morgantown has clarified Google’s current relationship to TeraWulf and that the unexecuted warrants do not convey to Google control or ownership of TeraWulf.”
FERC order, Docket EC26-58-000 (Jul 29 2026) · thebaynet.com - warrant-liability$844.7Mwhat the backstop cost the landlord, on its own books: $515.5M fair value at issuance (booked as a deferred charge — the price of the guarantee), a $844.7M liability at Dec 31 2025 after a $329.2M FY-2025 loss; the noteholder consolidating schedules mark it at $1,816.690M (thousands table) at Jun 30 2026. The warrants rose in value with TeraWulf's stock — the better the landlord does, the more the guarantee costs it (in Q3-2026 the liability fell: see warrant-gain-q3)
“As of December 31, 2025, the Company had recorded warrant liabilities of $844.7 million relating to the warrants issued in connection with the Google Backstop (see Note 8).”
TeraWulf FY-2025 10-K · sec.gov - warrant-loss-2026$755.7M$755.7M in Q2-2026 and $972.0M in H1-2026 (Q1 $216.3M — consistent: 972.0 − 755.7 = 216.3), 'driven by the increase in the Company's stock price'
“Change in fair value of warrants during the three and six months ended June 30, 2026 was $755.7 million and $972.0 million, respectively, related to the Google Warrants driven by the increase in the Company’s stock price.”
TeraWulf Q2-2026 10-Q · sec.gov - project-notes$3200M$3,200.0M 7.75% senior secured notes due Oct 15 2030 at WULF Compute LLC (priced Oct 16, closed Oct 22 2025) — 'to finance the construction of 522.5 MW' at Lake Mariner, Core42's halls included; the same $3.2B as Google's backstop, which the releases describe as 'in support of project-related debt financing'. '75-25 debt equity' and $9.1M per MW of project cost (Q2-2026 call)
“On October 22, 2025, the Company, through its wholly owned subsidiary Wulf Compute LLC (“Wulf Compute”), completed a private offering of $3,200.0 million aggregate principal amount of 7.75% Senior Secured Notes due 2030”
TeraWulf FY-2025 10-K · sec.gov - amendments$500MJul 2026: TeraWulf contributes ~$150M toward Fluidstack's fit-out costs, and the amendments plus the earlier 162 → 168 MW upsizing are 'expected to generate more than $500 million of incremental lease revenue' over the initial terms (~$200M + >$300M). Incremental, never added here to the $6.7B. The filed account (Q2 and Q3 10-Qs): two leases go from 162 MW to 168 MW, commence 'on a data hall-by-data hall basis' and carry 'additional base rent per kilowatt of tenant critical power' 'subject to annual escalation'; the Q3 10-Q has the affected leases commencing 'during the fourth quarter of 2026 and early 2027' where the Q2 10-Q had 'the second half of 2026 and early 2027' — the same plan, one quarter closer. Neither 10-Q gives a dollar figure
“Together with the previously announced increase in contracted capacity from 162 to 168 critical megawatts at each of CB-4 and CB-5, the amendments are expected to generate more than $500 million of incremental lease revenue for WULF Compute over the initial lease terms.”
TeraWulf Q2-2026 earnings call (Motley Fool transcript) · fool.com - energized102 MW102 MW of critical IT operational and revenue-generating at the campus on Sep 30 2026 — campus-wide, Core42's leases included: 'all Core42 Leases and one Akela Fluidstack Lease had commenced'. Core42's 60 MW is in service in full, so the Fluidstack part is 102 − 60 = 42 MW, CB-3's size (our subtraction; the 10-Q gives no split). The Q2 10-Q had the same 102 MW as energized in July 2026, when at Jun 30 only 'part of the one of the Akela Fluidstack Leases' had commenced (81 MW). Not a Fluidstack-only figure
“As of September 30, 2026, all Core42 Leases and one Akela Fluidstack Lease had commenced, representing an aggregate of 102 MW of operational, revenue-generating critical IT capacity.”
TeraWulf Q3-2026 10-Q, MD&A — HPC lease revenue · sec.gov - under-construction336 MW336 MW still to come at the campus — CB-4 and CB-5, 168 MW each, the two Fluidstack buildings not yet delivered (CB-3's 42 MW is the one that is). TeraWulf's Q3-2026 release (Nov 6 2026; furnished under Items 2.02/7.01) says CB-4 'remains on track for phased delivery and rent commencement during the fourth quarter' and CB-5 'remains targeted to begin phased delivery in early 2027'; its deck dates them Nov–Dec 2026 and Q1 2027, and says CB-4's delivery runs 'under amended lease schedule' without saying what was amended (the Q3 10-Q does: the July 2026 amendments put the two upsized leases on commencement 'on a data hall-by-data hall basis' — see amendments). The same bullet gives 102 MW of revenue-generating critical IT at Sep 30: the campus-wide figure of energized, not Fluidstack's alone — the deck lists the buildings behind it as WULF Den, CB-1, CB-2A, CB-2B and CB-3. The Q3 10-Q (filed) agrees on the timing: 'one Akela Fluidstack Lease had commenced operations, with the remaining contracted capacity scheduled for phased commencement during the fourth quarter of 2026 and the first half of 2027' — it gives no MW for the remainder (378 − 42 = 336 is our subtraction, and the release's number). Targets, not deliveries
“Lake Mariner: Operated 102 MW of revenue-generating critical IT capacity as of September 30, 2026, with an additional 336 MW under construction across CB-4 and CB-5. CB-4 remains on track for phased delivery and rent commencement during the fourth quarter. CB-5 remains targeted to begin phased delivery in early 2027.”
TeraWulf Q3-2026 earnings release (8-K ex-99.1, furnished 2026-11-06) · sec.gov - cost-per-mw-low-end$8–10M$8–10M per critical-IT MW — TeraWulf's Q3-2026 release (Nov 6 2026; furnished) says WULF Compute 'continues to progress within' its 'previously disclosed cost guidance' of that range. WULF Compute is the notes issuer (project-notes) that builds Core42's halls and the three Akela Fluidstack buildings, so this is the campus's build cost, not the leases' rent; the Q2 call's $9.1M per MW sits inside the range. The release does not say where in the range Lake Mariner stands or give a total, and 'previously disclosed' is its own phrase. num is the range's low end
“WULF Compute continues to progress within the Company’s previously disclosed cost guidance of $8 million to $10 million per critical IT MW.”
TeraWulf Q3-2026 earnings release (8-K ex-99.1, furnished 2026-11-06) · sec.gov - warrant-gain-q3$728.4Ma $728.4M non-cash gain in Q3-2026 on the Google Warrants — the swing back after the $972.0M H1 loss (warrant-loss-2026) — and a $243.6M loss over the nine months. TeraWulf's Q3-2026 10-Q (filed Nov 6; the release and deck, furnished, had the quarter first) states both and gives the cause: the Q2 10-Q put the earlier rise down to 'the increase in the Company’s stock price', and the Q3 one says the change was 'driven by the fluctuation in the Company’s stock price during the respective periods'. Its balance sheet carries 'Warrant liabilities 1,088,248' (thousands) at Sep 30 against 844,698 at Dec 31 2025 — the $844.7M the 10-K ties to the Google Backstop's warrants — and the 1,816,690 the Q2 10-Q's balance sheet showed at Jun 30 (warrant-liability): 1,816,690 less 1,088,248 is 728,442, the quarter's gain to the thousand, and 844,698 plus the nine months' 243,550 loss is exactly 1,088,248 (both sums ours). The release says Q3 net income of about $709.9M was 'benefiting from a non-cash change in fair value of warrants'. So the guarantee's price on the landlord's books fell by about $728M in a quarter after rising by $972M in the half-year before — a mark on TeraWulf's own share price, not a new term of the backstop
“Change in fair value of warrant and derivative liabilities during the three and nine months ended September 30, 2026 was $728.4 million and $(243.6) million, respectively, related to the fair value of the Google Warrants driven by the fluctuation in the Company’s stock price during the respective periods.”
TeraWulf Q3-2026 10-Q, MD&A — change in fair value of warrant and derivative liabilities · sec.gov - backstop-amortization$1.1Mthe price of the guarantee starts to be expensed: the $515.5M asset TeraWulf booked for the warrants at issuance (warrant-liability) began to amortize 'over the life of the applicable Fluidstack HPC Lease' once the first lease commenced in Q3-2026, and the 10-Q reports $1.1M of expense for the quarter — a start-up figure, since only one of three leases had commenced and only part of the quarter had run (our reading; the 10-Q gives no schedule). It is the 10-Q's own account of the backstop becoming effective for that lease, beside the $600M the release and call report as in force (backstop-effective)
“Upon the commencement of one of the Fluidstack HPC Leases, during the three months ended September 30, 2026, the Company began amortizing this asset over the life of the applicable Fluidstack HPC Lease on a straight-line basis to recognize the benefit derived from the Google Backstop. During the three and nine months ended September 30, 2026, the Company recorded amortization expense related to the Google Backstop of $1.1 million, in operating expenses in the condensed consolidated statements of operations.”
TeraWulf Q3-2026 10-Q, Note 8 — Leases · sec.gov
Contested figures 4 not reconciled — every position side by side, with its source and tier
Scope note what this record leaves to other records
NOT this record (carried elsewhere): Core42's La Lupa leases at the same campus (72.5 MW / ~$1.1B in the Q3-2025 10-Q; 60 MW / ~$1.0B in the 10-K and deck — G42-backed, not Fluidstack); TeraWulf's portfolio aggregates ('more than $17 billion', '$16.2Bn', 'over $12.8 billion', '~$27B+' contracted; '522.5 MW' = 72.5 + 450; '522 MW' including 50.1% of Abernathy) — TeraWulf-wide, never this lease's (the Nov-6 2026 deck's '~$8B' of contracted revenue and ~$700M of average annual NOI for Lake Mariner cover 438 MW — Core42's 60 MW as well as Fluidstack's 378 — so they are the campus's, not the three leases'; the same deck splits its ~$27B as ~$19B Justified plus ~$8B Lake Mariner, 839 MW in all); the Q3-2025 '$4.5Bn' of Google backstops = this $3.2B + Abernathy's $1.3B (fs-terawulf-abernathy); Hawesville → anth-terawulf-hawesville (Anthropic direct, no Google warrant); Alphabet's aggregate exposure → goog-anth-backstops; Morgantown MD itself (FERC EC26-58) → the terawulf entity. Not adopted: the Telegraph's stale '$1.8bn'; Forbes' '$3.2 billion' deal value; DCD's 'taken an equity stake in the company of ~14 percent' (reads as Fluidstack; it is TeraWulf warrants, which FERC says convey no ownership).