Nvidia–KYEC

Nvidia says it's paying King Yuan Electronics $1.1B up front for new US chip-testing capacity. King Yuan says it will credit the advance against testing fees.

A deal between Nvidia, KYEC

Why it matters

Nvidia is using advance payments at the last step before a chip ships. Nvidia puts its advance to KYEC for reserved US testing capacity at $1.1B. KYEC's filing says the money is repaid only as credits on Nvidia's testing bills.

Tap a figure for the line in its source.

Nvidia gives KYEC

  • a capacity reservation advance to support new US testing facilities and equipment — Nvidia's figure; KYEC's filings give no amount, and no document says when it is paid

KYEC gives Nvidia

  • testing capacity that KYEC and its US subsidiary AeternZ build in the US and reserve for Nvidia, and the testing services themselves — high-volume production targeted for April 2027 by Nvidia, contested
  • credit for the advance against the fees for those services until it is fully used up, which is when the agreement ends, by KYEC's filing; volumes and prices undisclosed

Oct 13, 2026 announced by KYEC, naming Nvidia but no amount disclosed by the parties

What happened

On Oct 13 2026, KYEC told the Taiwan exchange that Nvidia would pay it in advance while US testing capacity is being built. KYEC (King Yuan Electronics) is a Taiwanese company that tests chips for other companies. KYEC told the exchange that it and its US subsidiary AeternZ would build the capacity and reserve it for Nvidia. The disclosure says KYEC and AeternZ would work off the advance through credits on Nvidia's testing bills until it is used up. KYEC gave no amount. Nvidia's own release a week later put the advance at $1.1 billion and targeted high-volume production for April 2027. A Taiwanese paper had reported that KYEC planned to start at small volumes in 2028. AeternZ has since bought a site in Fort Worth, Texas. Nvidia receives no shares.

Sources 19 documents — 5 regulatory filings · 4 press reports · 3 SEC filings · 2 company releases · 2 government statements · 2 other documents · 1 research note

Research trail Found 109 documents and read 99 of them while checking this deal and related ones.

  1. company releasenvidianews.nvidia.com
    States 2 figures: $1.1B advance · nvidia side
  2. TWSE filing · regulatory filingmopsov.twse.com.tw
    States 2 figures: kyec announcement · credit back
  3. company releasekyec.com.tw
    States Q3 subsequent event
  4. TWSE filing · regulatory filingmopsov.twse.com.tw
    States $0.3B parent guarantee
  5. TWSE filing · regulatory filingmopsov.twse.com.tw
    States up to $1.4B US investment ceiling
  6. fortworthtexas.gov · government statementfortworthtexas.gov
    States $1B US site
  7. regulatory filingmopsov.twse.com.tw
    Cited by the record; no single figure is quoted from it.
  8. regulatory filingmopsov.twse.com.tw
    Cited by the record; no single figure is quoted from it.
  9. government statementtdlr.texas.gov
    Cited by the record; no single figure is quoted from it.
  10. press reportcna.com.tw
    Cited by the record; no single figure is quoted from it.
  11. press reportOct 14, 2026finance.technews.tw
    Cited by the record; no single figure is quoted from it.
  12. other documentieknet.iek.org.tw
    Cited by the record; no single figure is quoted from it.
  13. press reportww2.money-link.com.tw
    Cited by the record; no single figure is quoted from it.
  14. press reportww2.money-link.com.tw
    Cited by the record; no single figure is quoted from it.
  15. other documenttaiwannews.com.tw
    Cited by the record; no single figure is quoted from it.
  16. research notegooptions.substack.com
    Cited by the record; no single figure is quoted from it.
  17. SEC filingefts.sec.gov
    Cited by the record; no single figure is quoted from it.
  18. SEC filingefts.sec.gov
    Cited by the record; no single figure is quoted from it.
  19. SEC filingefts.sec.gov
    Cited by the record; no single figure is quoted from it.

The record's own summary of its sourcing: Nvidia release (Oct 21 2026); KYEC MOPS announcements (Jul 10, Sep 17, Oct 13 ×2 and Oct 29 2026) and Q3 2026 consolidated report (Nov 5 2026); City of Fort Worth tax-abatement notice; TDLR registration; CNA (Oct 13), TechNews, Commercial Times via IEK and Money-link (Oct 14 2026); EDGAR full-text searches of Nvidia's 2026 filings · as of Nov 2026

The evidence 8 sourced figures · 2 disputes

The record's headline Nvidia–KYEC: a $1.1B capacity reservation advance (Nvidia's figure; KYEC's filings state no amount) for US chip-testing capacity that KYEC and its US subsidiary build and reserve for Nvidia, credited against KYEC's testing fees until used up — high-volume production targeted for April 2027 by Nvidia, a small-volume start in 2028 as reported for KYEC; no equity, no published agreement

Size
$1.1B capacity reservation advance (Nvidia's figure; KYEC states none), credited back against testing fees
When
Jul 10 2026 (KYEC's board allows up to US$1.4B for a US subsidiary and plant) → Sep 17 2026 (KYEC to guarantee AeternZ's capacity contract with a customer, up to US$300M) → Oct 13 2026 (prepayment agreement with Nvidia announced; the guarantee cancelled) → Oct 21 2026 (Nvidia's release: $1.1B) → Oct 28 2026 – Aug 15 2027 (renovation and addition registered at AeternZ's Fort Worth building) → Oct 29 2026 (AeternZ buys the Fort Worth site) → April 2027 (Nvidia's high-volume target; contested) → until the advance is fully offset (the agreement ends)
Status
approved by KYEC's board and announced Oct 13 2026 · booked by KYEC as a subsequent event after Sep 30, nothing received by then · $1.1B disclosed by Nvidia Oct 21 2026 · high-volume production targeted for April 2027 by Nvidia, the US start contested · agreement unpublished, and no Nvidia SEC filing names KYEC
Structure
a customer prepayment agreement between NVIDIA International, Inc. and KYEC with its wholly owned US subsidiary AeternZ Semiconductor Testing Corporation: Nvidia pays in advance; KYEC and AeternZ build testing capacity in the US, reserve it for Nvidia and provide the testing services, and the advance is offset against the fees for those services until it is used up, which is when the agreement ends. $1.1B by Nvidia; no amount, schedule or capacity from KYEC, whose filing leaves restrictions, commitments and other terms 'per the agreement', which is unpublished. It replaced an earlier arrangement in which KYEC was to guarantee AeternZ's side of a capacity contract with a customer, up to US$300M, at that customer's request — cancelled the same minute, because 'the contract structure' changed. No equity or warrant passes either way
Parties
Nvidia customer — pays ahead, through NVIDIA International, Inc., for US testing capacity reserved for it; its 2026 SEC filings to Nov 16 name neither KYEC nor King Yuan (EDGAR full-text search) · KYEC chip tester — with its US subsidiary AeternZ, builds and reserves the capacity and credits the advance against its testing fees; announced the agreement with no amount
Record
disclosed / primary source · as of Nov 2026

Flows 2 as the record states them

  • Nvidia → KYECprepayments$1.1B capacity reservation advance by Nvidia's Oct 21 2026 release; KYEC's filings give no amount, and no document gives a payment date or schedule
  • KYEC → Nvidiatesting-serviceschip-testing capacity built in the US by KYEC and AeternZ and reserved for Nvidia, and the testing services, whose fees the advance is credited against until used up; the capacity's size, volumes and prices undisclosed

Resolved figures 8 each with the verbatim line from its document

  • advance$1.1B
    $1.1B — Nvidia's figure, the payer's own, in its Oct 21 2026 release at GTC Berlin (its summary: 'KYEC will build new facilities in the U.S., supported by a $1.1 billion capacity reservation advance from NVIDIA'). Single-sourced: KYEC's filings never give the amount — its Oct 13 announcement names Nvidia and states none, its Q3 report says only that the customer 'will prepay part of the payments' (q3-subsequent-event) — and TechNews (Oct 14) notes that KYEC did not disclose it. Neither side says when the advance is paid, in what instalments, or whether any of it is refundable. Not the press figures: Taiwan News's 'up to NT$45 billion (US$1.4 billion) in advance' is KYEC's US investment ceiling (us-investment-ceiling), and gooptions's 'about US$300 million' (Oct 14) was its author's estimate from the cancelled guarantee (parent-guarantee)
    “NVIDIA’s $1.1 billion capacity reservation advance to KYEC will support new U.S. testing facilities and equipment, with high-volume production targeted for April 2027.”
    Nvidia release, Oct 21 2026 (GTC Berlin; Nvidia newsroom) · nvidianews.nvidia.com
  • kyec-announcement
    the agreement as KYEC announced it on the Taiwan exchange (MOPS, Oct 13 2026, 14:10:02), the day its board approved it: KYEC and its wholly owned US subsidiary AeternZ Semiconductor Testing Corporation signed a customer prepayment agreement with NVIDIA International, Inc., under which the customer pays in advance and KYEC and AeternZ build capacity in the US, reserve it for the customer and provide testing services, the prepayment to be offset against the later service fees (credit-back). Its stated purpose: to deepen the long-term relationship with the customer and expand US testing capacity. It states no amount, schedule or size of capacity, and gives restrictions, commitments and other terms only as 'per the agreement'. This filing is the first public naming of Nvidia in the deal, eight days before Nvidia's release; CNA reported it that day
    “2.契約或承諾相對人:NVIDIA International, Inc.”
    KYEC MOPS announcement (Oct 13 2026, 14:10:02), item 2 — the counterparty · mopsov.twse.com.tw
  • credit-back
    how the money comes back, in KYEC's filed words: not in cash but as credits — 'the prepayment is offset against later service fees' — and the agreement runs 'from the signing date until the day the prepayment is fully offset' (item 4, quoted). So its length depends on how fast Nvidia uses the capacity; no document gives the rate, a minimum volume, the price of the services, or what happens if either side falls short. KYEC's Q3 report repeats the mechanism (q3-subsequent-event)
    “4.契約或承諾起迄日期(或解除日期):自簽約日起至預付款全數抵減完畢之日止”
    KYEC MOPS announcement (Oct 13 2026, 14:10:02), item 4 — the term · mopsov.twse.com.tw
  • q3-subsequent-event
    KYEC's Q3 2026 consolidated report, reviewed by its auditors and dated Nov 5 2026, books the agreement among significant events after the Sep 30 balance-sheet date: under it 'the customer will prepay part of the payments' so that KYEC and AeternZ can build and reserve capacity in the US for future testing services, and the advance will be offset against the service fees the customer owes as the services are provided. So nothing had been received at Sep 30; the note names no customer and no amount. The same report shows the US subsidiary's start — US$250K into AeternZ Technology Holding Corp. and US$250K from it into AeternZ Semiconductor Testing Corp. in Q3 2026 — and the US$300M guarantee still outstanding at Sep 30 (parent-guarantee)
    “依協議約定,客戶將預付部分款項,以供本公司及 AeternZ 於美國建置”
    KYEC Q3 2026 consolidated financial report (reviewed; dated Nov 5 2026), note 11 — significant subsequent events · kyec.com.tw
  • parent-guarantee$0.3B
    a guarantee that was given and then taken back. On Sep 17 2026 KYEC's board agreed to act as joint guarantor for AeternZ, up to US$300M (NT$9,566,400K; nothing drawn), because AeternZ had a contract with a customer on building and reserving capacity and the customer asked for it (MOPS, Sep 17). On Oct 13, seventeen seconds after the prepayment announcement (14:10:02 → 14:10:19), KYEC cancelled it: 'because the contract structure was adjusted', it no longer needs to guarantee AeternZ. Its Q3 report still shows the guarantee at Sep 30 (NT$9,555,000K, 14.54% of net worth), before the cancellation. Neither filing names the customer; that the guaranteed contract is the Nvidia agreement in an earlier form is an inference from timing and scope (gooptions), not a disclosure, and KYEC's two filings disagree on whether that contract had been signed (september-contract-status). Not the advance: gooptions's 'about US$300 million' estimate of the advance was drawn from this cap
    “上限為美金300,000,000元之背書保證額度,並於同日公告。現因合約架構調整,”
    KYEC MOPS announcement (Oct 13 2026, 14:10:19), cancelling the guarantee of Sep 17 2026 · mopsov.twse.com.tw
  • us-investment-ceilingup to $1.4B
    what KYEC may spend in the US: on Jul 10 2026 its board authorized the chairman to set up a US subsidiary and invest in a plant within US$1.4B, funded by 'own funds or borrowings' — a ceiling, not a budget, and not the advance; the advance came three months later. CNA (NT$44.9B) and TechNews (NT$45B) give this ceiling beside the prepayment news as the investment's; Taiwan News, on Oct 14, reported it as the advance itself ('up to NT$45 billion (US$1.4 billion) in advance'), which no filing supports
    “3.預計投資金額:本次董事會決議授權董事長於美金1,400,000,000元額度內全權處理”
    KYEC MOPS announcement (Jul 10 2026, 12:10:17), item 3 · mopsov.twse.com.tw
  • us-site$1B
    where the capacity is being built, as far as the record shows: AeternZ, the subsidiary in the agreement, bought the land and buildings at 201 & 273 W. Everman Parkway, Fort Worth, Texas, for US$79,350,000 (KYEC MOPS, Oct 29 2026), and Fort Worth's notice of a tax-abatement agreement with AeternZ, 'a Texas subsidiary of King Yuan Electronics', for its council's Oct 27 2026 meeting, estimates the improvements for 'a manufacturing facility' at $1 billion of real property and $300 million of new business personal property — $1.3B together, our sum, inside the board's US$1.4B ceiling. Texas's accessibility registry lists an 'AeternZ Factory Renovation and Addition' of one building there, Oct 28 2026 to Aug 15 2027, estimated cost $300,000,000. Nvidia's release speaks of 'new U.S. testing facilities' without naming a site, so whether all the reserved capacity is in Fort Worth, no document says
    “$1 billion in real property improvements; and (ii) $300 million in new business personal property.”
    City of Fort Worth, notice of a tax-abatement agreement with AeternZ (for the Oct 27 2026 council meeting), item 4 · fortworthtexas.gov
  • nvidia-side
    Nvidia's own frame, and its silence on file: the release sets the KYEC advance inside a goal for all its testing capacity — to double from calendar 2026 to 2027 through buildouts in the US, Taiwan and Singapore, with expanded testing in Singapore expected to begin high-volume production in February 2027 — and assigns none of the Taiwan or Singapore buildouts to KYEC. Of the six suppliers the release names, KYEC's is the one advance with a figure; IBIDEN's is 'multibillion-dollar' (nv-ibiden). EDGAR full-text searches of Nvidia's filings from Jan 1 to Nov 16 2026 find neither 'King Yuan' nor 'KYEC', and none to Nov 13 uses 'capacity reservation'
    “NVIDIA expects its total semiconductor testing capacity to double from calendar 2026 to 2027, supported by buildouts in the U.S., Taiwan and Singapore.”
    Nvidia release, Oct 21 2026; EDGAR full-text searches of Nvidia's filings (CIK 1045810), Jan 1 – Nov 16 2026 · nvidianews.nvidia.com

Contested figures 4 not reconciled — every position side by side, with its source and tier

us-production-start3 positions, side by side
April 2027 — Nvidia, Oct 21 2026: the advance 'will support new U.S. testing facilities and equipment, with high-volume production targeted for April 2027' (advance). The payer's word, a week after the other two first appeared, for 'facilities' in the plural at no named site. Beside it, Texas's registry has the renovation and addition of one of AeternZ's Fort Worth buildings running Oct 28 2026 to Aug 15 2027 (us-site) — after the April target, unless the April volume is elsewhere or in space ready sooner, which no document says Nvidia release, Oct 21 2026; TDLR registration TABS2027004751 (Oct 29 2026)
2028, at small volume — KYEC as reported by Commercial Times on Oct 14 2026, before Nvidia gave a date: '京元電表示,美國新廠初步規劃2028年開始小量運轉,實際產能規模將視客戶需求、設備導入及建廠進度調整' (KYEC said the US plant is initially planned to begin small-volume operation in 2028, its actual capacity to depend on customer demand, equipment and construction). One article, carried by IEK and USTV — one source, not several; no KYEC filing gives a date Commercial Times, Oct 14 2026, via IEK
Q4 2027 at the earliest — unattributed market talk in Times reporting: '市場傳出選址德州沃斯堡,最快2027年第四季量產' (the market says the site is Fort Worth, Texas, with mass production in Q4 2027 at the earliest; Money-link, Oct 14 2026), repeated on Nov 5. Neither KYEC's nor Nvidia's word Money-link (Times news), Oct 14 and Nov 5 2026
september-contract-statusone entry, in its own words
whether the capacity contract behind the cancelled guarantee (parent-guarantee) had been signed, in KYEC's own two filings a month apart. Sep 17 2026: '子公司與客戶簽署有關產能建置與保留之合約' — the subsidiary has signed a contract with a customer on building and reserving capacity — vs Oct 13 2026: AeternZ '前擬與客戶簽署' it — had planned to sign it. Neither names the customer, and whether that contract became the Nvidia agreement, no filing says KYEC MOPS, Sep 17 2026 vs Oct 13 2026

Scope note what this record leaves to other records

NOT this record (carried elsewhere or not carried): Nvidia's advance to IBIDEN in the same release (nv-ibiden) and its packaging, substrate and optics plans with Amkor (nv-amkor), Samsung Electro-Mechanics, Unimicron and SPIL, for which the release gives no amount; the Fort Worth site's own figures — land, price, abatement estimate, renovation (the kyec entity) — and the disputed floor areas, acreage and equipment purchases; KYEC's results, its 2026 capex budget and its largest customer's share of 2025 revenue (36% by KYEC's annual report as relayed, a customer KYEC does not name, which this record does not decode); Nvidia's testing capacity in Taiwan and Singapore, which its release does not assign to KYEC. Not adopted: Taiwan News's 'up to NT$45 billion (US$1.4 billion) in advance' is KYEC's US investment ceiling relabelled (us-investment-ceiling); gooptions's '約 3 億美元' was its author's estimate, rated at 30% confidence, a week before Nvidia gave a figure; Tom's Hardware's line that KYEC 'currently handles nearly all of Nvidia's chip testing' names no source, and it puts Nvidia's Taiwan and Singapore buildouts at KYEC's facilities, which Nvidia's release does not. Not circular: Nvidia takes no equity or warrant and no money runs back to it — it pays ahead for services, as with Amkor (nv-amkor).

More between Nvidia and KYEC

The record holds no other deal between them.

Everything between Nvidia and KYEC →