SK Telecom–AWS Ulsan AI-DC

SK Telecom is building a 103 AI data center in Korea with AWS as its 15-year partner. Korea's science ministry, not SK or AWS, puts AWS's investment at $4B.

A deal between SK Telecom, Amazon / AWS

Why it matters

SK Telecom said twice in mid-2026 that nothing was decided on a reported KKR investment in an AI data-center project it is developing. Its Aug 27 filing of a 49% sale of a new data-center company does not name Ulsan. Every financial figure for the 103 project comes from the ministry or the press. The government press office puts Amazon's investment at $4B, a figure AWS has never stated.

Tap a figure for the line in its source.

Amazon / AWS gives SK Telecom

  • investment in the ~KRW 7 trillion project — a ministry figure AWS and SK never confirmed

SK Telecom gives Amazon / AWS

  • of AI data-center capacity in Ulsan, used by AWS for 15 years; exclusive use unconfirmed

Jun 2025 announced by SK Telecom and AWSupdated Nov 21, 2026under construction outside estimate

What happened

SK Telecom is building a 100-megawatt-class AI data center in Ulsan, an industrial port city. Amazon Web Services is its partner for 15 years. The Korean science ministry puts the project at roughly KRW 7 trillion and Amazon's investment at $4 billion. The companies did not supply those figures, and neither has ever disclosed them in a filing. Korean investment-banking press reports that SK is selling 49% of the project to KKR and Korean funds. The reports put the price between KRW 1.5 trillion and 3 trillion, with the range drifting upward from report to report. In July and August 2026 SK Telecom filed twice with the SEC to say nothing had been decided. On Aug 27 it filed a plan for KKR and an IMM group to take 49% of SK Horizon, for about KRW 3.08 trillion. That sum covers shares bought from SK Telecom and new shares. SK Horizon is to be a new company holding SK Broadband's data centers and subsea cables. The filing does not name Ulsan or AWS, so whether this project is in the sale is not stated.

Sources 10 documents — 4 SEC filings · 2 company releases · 1 government statement · 1 regulatory filing · 1 press report · 1 research note

Research trail Found 193 documents and read 191 of them while checking this deal and related ones.

  1. SK Telecom · company releasenews.sktelecom.com
    States 2 figures: partnership term · $5.88B aws korea program distinct (for context)
  2. Korea's science ministry · government statementmsit.go.kr
    States 2 figures: 103 MW ministry schedule · $4B aws investment
  3. Korea Power Exchange · regulatory filingnew.kpx.or.kr
    States 1,227 MW ulsan gps capacity context (for context)
  4. SK Telecom · SEC filingsec.gov
    States stake sale non confirmation
  5. SK Telecom · SEC filingsec.gov
    States sk horizon sale
  6. SK Telecom · company releaseJul 31, 2026sktelecom.com
    States more than 1 GW expansion target
  7. Seoul Economic Daily · press reportsedaily.com
    States GPU count
  8. Korea Energy Economics Institute · research notekeei.re.kr
    States 60.4% siting context (for context)
  9. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  10. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.

The record's own summary of its sourcing: MSIT release 6/2025 + SKT/AWS joint release + SKT 6-K clarifications 7/2026 and 8/2026 + SKT 6-Ks on the SK Horizon sale and SK Broadband spin-off 8/27/2026 + SKT Sustainability Report 2025 · as of Aug 2026

The evidence 7 sourced figures · 10 disputes · 3 for context

The record's headline SK Telecom–AWS Ulsan AI-DC: 103 / ~KRW 7tn reported ($4B AWS, ministry-sourced) — a 49% stake sale in the press; SKT's filed 49% SK Horizon sale names no Ulsan

Size
103 MW (→ 'over 1GW' ambition) / ~KRW 7tn reported — $4B AWS, ministry figure, never company-filed
When
Jun 2025 → 41 MW Nov 2027 → 103 MW Feb 2029 (ministry schedule; city says Jun 2027)
Status
under construction — groundbreaking ceremony Aug 29 2025; the start DATE is contested (SKT's own releases say 'end of August' and 'September 2025' — see contested); progress 31.5% (May 2026, Block A basis) → 34% (Jun 2026)
Structure
SK-led build (SK Hyper/SKT) + AWS 15-yr anchor partnership; a 49% stake sale the press reports (KKR 29% / IMM·Stonebridge 20%), on which SKT's Jul 10 and Aug 7 6-Ks said nothing was decided; SKT's Aug 27 6-K files a 49% sale of SK Horizon, SK Broadband's data-center and subsea-cable spin-off, to KKR (29%) and Korea Digital Infra ('IMM Consortium', 20%), naming no Ulsan or AWS
Programme
SK Telecom–AWS Ulsan
Parties
SK Telecom builder/owner (via SK Hyper) + reported stake seller · Amazon / AWS anchor partner + $4B investor (ministry-attributed)
Record
serious third-party estimate · as of Aug 2026

Flows 2 as the record states them

  • Amazon / AWS → SK Telecomproject-investment$4B (MSIT-attributed, INSIDE the ~KRW 7tn project, not additive; never confirmed by AWS or SK)
  • Amazon / AWS → SK Telecomofftake15-yr partnership use of the facility — no $ disclosed; 'exclusive use' exists only in one anonymous phone quote (contested)

Resolved figures 7 each with the verbatim line from its document

  • ministry-schedule103 MW
    103 MW full capacity by Feb 2029, first 41 MW Nov 2027, groundbreaking SCHEDULED for Sep 2025 (a Jun 2025 plan date — the actual start is contested, see contested), ~KRW 7tn — one ministry sentence carries the project's entire headline schedule and cost; '100MW-class' is the same facility's rounded class descriptor, not a competing figure. Ulsan City (sibling government source, two days apart) says 'complete by Jun 2027' — see contested
    “The roundtable was organized to coincide with the launch of the large-scale (100MW-class) Ulsan AI Data Center, a project led by SK Group, which recently secured a $4 billion investment from Amazon Web Services (AWS). The project, valued at approximately KRW 7 trillion, is scheduled to break ground in September 2025, begin partial operations with 41MW in November 2027, and reach full capacity of 103MW by February 2029.”
    MSIT (Korean ICT ministry) release, Jun 2025 · msit.go.kr
  • aws-investment$4B
    $4B, INSIDE the ~KRW 7tn project (not additive) — a government (MSIT) figure never confirmed by AWS, SK, or any filing; press '78%'/'81%' project shares are FX artifacts of converting $4bn and 7조 at different rates. Cite as ministry-sourced, in USD
    “The roundtable was organized to coincide with the launch of the large-scale (100MW-class) Ulsan AI Data Center, a project led by SK Group, which recently secured a $4 billion investment from Amazon Web Services (AWS). The project, valued at approximately KRW 7 trillion, is scheduled to break ground in September 2025, begin partial operations with 41MW in November 2027, and reach full capacity of 103MW by February 2029.”
    MSIT release, Jun 2025 — never company-confirmed · msit.go.kr
  • partnership-term15 years
    15-year SK–AWS partnership, operations from 2027 — the duration is first-party; EXCLUSIVITY is not (see contested). The 'up to 78,000 jobs' in the same passage is 'over time', horizon unstated (see contested)
    “The data center in Ulsan is scheduled to begin operations by 2027 and is expected to generate up to 78,000 direct and indirect jobs over time as the data center scales and operations expand. The AI Zone in Ulsan will combine industry-leading capabilities from SK Group and AWS through a 15-year partnership to provide top-tier network operations, a semiconductor supply chain, and efficient power infrastructure. This partnership is in addition to AWS’s long-term US $5.88 billion (approx. 7.85 trillion won) planned investment in Korea by 2027.”
    SKT/AWS joint release (SKT newsroom en/1948), Jun 2025 · news.sktelecom.com
  • expansion-targetmore than 1 GW
    'over 1GW' long-term Ulsan expansion — SKT's own report, with NO completion date in any first-party or government source; '1 GW by 2029' is a single trade-press compression (2029 belongs to the 103 MW milestone, per MSIT)
    “SK Telecom aims to establish a core hub in Asia by constructing a hyper-scale AI Data Center (DC) infrastructure of over 1GW in Ulsan.”
    SKT Sustainability Report 2025 (Jul 2026) · sktelecom.com
  • gpu-count
    ~60,000 GPUs planned ('GPU 6만 장') — stated by SKT CEO Ryu Young-sang at MWC (Mar 2025, pre-announcement: '100MW-class, non-capital-region') and restated in the government material on file (KEEI: '약 6만 장의 AI 반도체'). Unanimous but single-origin, and never printed in an English first-party document
    “글로벌 빅테크와 협력해 비수도권 지역에 GPU 6만 장, 소비 전력 100㎿(메가와트)급의 하이퍼스케일(초대형) AI 데이터센터 구축을 준비하고 있다”
    SKT CEO remarks via Sedaily 3/2025 + KEEI report · sedaily.com
  • stake-sale-non-confirmation
    SKT's two SEC filings answering the press — the Jul 10 2026 clarification and this follow-up 6-K — each say 'no specific determinations or decisions have been made'. They answer a News Tomato report that KKR was weighing 'a potential equity investment in an artificial intelligence (“AI”) data center project being developed by SK Telecom', with 'a capital increase of approximately Won 1 trillion'; neither names Ulsan, AWS, a stake size or a split. That the project they mean is Ulsan, and the deal a 49% stake sale, is the press's account. SKT's Aug 27 6-K on the SK Horizon sale lists both as related disclosure (sk-horizon-sale)
    “As a follow-up to its July 10, 2026 clarification, the Company hereby confirms that it continues to review various strategic options in connection with its AI data center business. However, no specific determinations or decisions have been made as of the date hereof.”
    SKT 6-K (follow-up to the 7/10/2026 clarification) · sec.gov
  • sk-horizon-sale
    On Aug 27 2026 SKT's board approved selling 24,481,427 shares of SK Horizon Co., Ltd. (a tentative name for SK Broadband's data-center, including CDN, and subsea-cable leased-line businesses, to be spun off on Feb 1 2027) to Quantum Asia Holdings II ('KKR' in the filing) and Korea Digital Infra ('IMM Consortium') for KRW 1,881,128,369,253. SK Horizon is to issue the same two about KRW 1.20tn of new shares: about KRW 3.08tn in all, leaving SKT 51%, KKR 29% and IMM Consortium 20%, scheduled for Mar 4 2027 and 'subject to change'. The filing lists the Jul 10 and Aug 7 6-Ks as related disclosure but names no Ulsan, AWS or Amazon, and the spin-off 6-K does not reproduce its list of transferred real properties. The 29/20 split is the one the press reported for Ulsan, and the ~KRW 1.20tn of new shares sits beside the press's ~KRW 1tn of new equity (stake-sale-terms), but no filing says whether this project is in SK Horizon or whether the two are one transaction
    “The aggregate transaction value of the Share Sale and the Primary Share Subscription is approximately Won 3.08 trillion, and upon completion of the contemplated Primary Share Subscription, the Company, KKR and IMM Consortium are expected to hold 51%, 29% and 20%, respectively, of the shares of SK Horizon.”
    SKT 6-Ks, Decision on Disposal of Shares and Decision on Spin-off (Aug 27 2026) · sec.gov

Contested figures 10 not reconciled — every position side by side, with its source and tier

completion-milestonesone entry, in its own words
two government sources, two days apart (Jun 2025), give incompatible completion dates: Ulsan City 'whole facility by Jun 2027' vs MSIT '41 MW Nov 2027 → 103 MW Feb 2029'; a year into the build, trade press shifts both milestones a month earlier (Oct 2027 / Jan 2029), and SK Inc.'s 1Q26 deck has Block A EPC ending May 2027. Plausible-but-unstated reconciliation: construction-complete vs capacity-in-service — NO source states the mapping, so the milestone type is an explicit unknown Ulsan City vs MSIT vs iusm vs SK Inc. 1Q26 deck
construction-startone entry, in its own words
late Aug 2025 vs Sep 2025 — SKT's own two releases date the same event differently: the 3Q25 release says 'At the end of August ... held the groundbreaking ceremony ... and entered the full-scale construction phase' (the ceremony was Aug 29 2025: sedaily filed an on-site, same-day dispatch naming the attendees, and Nov 2025 site-tour coverage counts from '8월 말 착공'), while the FY25 release says 'since its groundbreaking in September 2025' and SK Inc.'s 1Q26 deck books the Block A EPC as '25.9~. MSIT and Ulsan City's 'September' (Jun 2025) was a forward-looking plan date that may simply have survived into later company copy. No source distinguishes ceremony / notice-to-proceed / site-prep. Two lone trade-press retrospectives say May 2025 (iusm 7/2026: '지난해 5월 착공') and Jun 2025 (bloter 10/2025: '올 6월 첫 삽을 뜬') — contradicted by the on-site dispatch and by SKT's own copy. Do not pick SKT 3Q25 vs FY25 results releases + SK Inc. 1Q26 deck; iusm/bloter outliers
phase-2-decompositionone entry, in its own words
only one source decomposes phase 2 (60 MW, completing Jan 2029) and it does not reconcile to the total: 40+60=100 or 41+60=101, not 103; every other source states only the balance-to-103 by Feb 2029 iusm 7/2026 vs ministry schedule
phase-1-capacityone entry, in its own words
41 MW (MSIT, zdnet, KEEI) vs ~40 MW — Korean press that prints 40 hedges it ('40여MW', '40MW 정도'), and English retellings drop the hedge to an unhedged '40 megawatts'; same rounding relationship as 100/103 MSIT vs Korean trade press
site-areaone entry, in its own words
36,000 m² vs 66,000 m² — one Korean digit apart (3만6000 / 6만6000), and Hankyung printed BOTH on different dates; its '11 football pitches' cross-check supports 66,000. No land-registry document on file; the KRW 28.3bn SK Chemicals land purchase states a price but no area, so it cannot arbitrate Hankyung 11/2025 vs 4/2026
cost-escalationone entry, in its own words
~KRW 7tn (ministry + joint announcement; ~20 restatements of one or two origins) vs 'up to ~KRW 10tn' — the 10조 appears once, attributed to unnamed observers ('관측') and explicitly conditioned on expansion possibility; it may be a 1 GW-expansion figure, not a 103 MW cost revision. An unconfirmed high-side marker, not a replacement MSIT vs Ajunews 1/2026
jobs-horizonone entry, in its own words
'up to 78,000 direct+indirect jobs over time' (joint release — no horizon, no methodology) vs '78,000 jobs + KRW 25tn economic effect over 30 years' (Korean press) — a 30-year horizon is a materially weaker claim than an undated one, and no source gives the model behind either joint release vs sedaily/edaily
aws-exclusivityone entry, in its own words
the deal's most economically significant unconfirmed term: 'AWS contracted to use the facility EXCLUSIVELY for 15 years' rests on one paraphrased telephone remark by an unnamed SKT official to IB Tomato — no contract, filing, or release carries it, and several stake-sale valuations implicitly depend on it. The 15-year duration itself is first-party (see resolved) IB Tomato via anonymous SKT official
stake-sale-termsone entry, in its own words
reported 49% of the Ulsan project (KKR 29% + IMM/Stonebridge 20%) for KRW ~1.5tn → 3tn — every report traces to anonymous 'IB업계' sourcing, and no filing names Ulsan with a stake, price or buyer; the size drifts UP monotonically (Dec 2025 '1.5–2tn' → Mar 2026 '2–2.5tn' → Jul 2026 '2.5–3tn incl. ~KRW 1tn new equity'), i.e. a live negotiation's time series with old/new-share bases unreconciled — do not average. SKT's Aug 27 6-K files the same 29/20 split, with ~KRW 1.20tn of new shares and ~KRW 3.08tn in all, but for 49% of SK Horizon, SK Broadband's data-center and subsea-cable spin-off, and names no Ulsan (sk-horizon-sale): whether the press's Ulsan stake and the filed SK Horizon sale are one transaction is not stated. Before it, SKT twice said 'no specific determinations' (see resolved) thebell/ddaily/investchosun/ebn via anonymous IB sourcing vs SKT 6-K (Aug 27 2026)
implied-evone entry, in its own words
KRW 3–4tn enterprise value — SELL-SIDE, self-described ('매각 측은 평가'); no buy-side or independent mark exists, and no source addresses the arithmetic tension of a 3–4tn EV against a stated ~KRW 7tn build cost (carve-out scope, post-money basis both unstated) Hankyung/EBN, sellers' own valuation

For context, not this deal's figures 3 kept beside the deal so they are not mistaken for its numbers

  • aws-korea-program-distinct$5.88B
    AWS's US$5.88B (approx. KRW 7.85tn) Korea-wide investment by 2027 is 'in addition to' this partnership — a SEPARATE program whose KRW rendering nearly collides with the project's own ~KRW 7tn; never sum or swap the two 7조s
    “The data center in Ulsan is scheduled to begin operations by 2027 and is expected to generate up to 78,000 direct and indirect jobs over time as the data center scales and operations expand. The AI Zone in Ulsan will combine industry-leading capabilities from SK Group and AWS through a 15-year partnership to provide top-tier network operations, a semiconductor supply chain, and efficient power infrastructure. This partnership is in addition to AWS’s long-term US $5.88 billion (approx. 7.85 trillion won) planned investment in Korea by 2027.”
    SKT/AWS joint release, Jun 2025 · news.sktelecom.com
  • ulsan-gps-capacity-context1,227 MW
    1,227 MW — Ulsan GPS combined-cycle, from the 11th Basic Electricity Plan's construction table (설비용량 MW column, Dec 2024 commissioning): the registry-grade figure that settles the 1.2GW / 1,122 / 1,227 press spread. Power context for the ADJACENT genco stake-sale reports (see note); the plant is SK Gas's, not part of this deal's capex
    “울산GPS복합 1,227”
    11th Basic Plan for Long-Term Electricity (KPX-hosted) · new.kpx.or.kr
  • siting-context60.4%
    60.4% of Korea's 165 data centres (2024) sit in the capital region — the concentration this project is the counter-move to; 75.3% is the same KEEI report's private-sector-only subset, not a competing figure
    “국내 데이터센터의 수는 2024년 기준 165개소로 조사되었으며, 전체 DC의 약 60.4%가 수도권(서울, 경기, 인천 등)에 위치함”
    KEEI (Korea Energy Economics Institute) · keei.re.kr

Scope note what this record leaves to other records

NOT this deal: the reported 49% sale of Ulsan GPS + SK Multi Utility (sellers SK Gas/SK Chemicals — two power gencos, 'KRW 2tn value / KRW 1tn stake price') is a SEPARATE transaction, reported as packaged into KKR's bid — its numbers must never be folded into the AIDC stake-sale range below. Same-number traps: the documents on file contain THREE distinct 'KRW ~7tn' figures — this project's ~7조; AWS's Korea-wide US$5.88B ≈ KRW 7.85tn by 2027 (joint release, see resolved); and AWS Korea's 'additional 7 trillion won' by 2031 (Oct 2025) — the closest collision, since it is literally 7조 and is itself rendered $5B (AWS's own denomination) and $4.6B (Korea Herald). Press USD conversions of THIS project's 7조 span $5–5.13B on undated FX (Reuters ~$5B, Forbes/Korea Herald $5.1B, JoongAng $5.13B); no primary states one, and the $4.6B belongs to the 2031 program, not here — carry KRW, and never let a bare '7조' or '$5B' cross between the three. Nor is any '$5B' AWS's share: Reuters' Oct 2025 wire compresses the project into 'AWS unveiled in June a $5 billion investment plan in South Korea with local conglomerate SK Group', crediting the project's ~$5B total to AWS alone, while AWS's figure on file is the ministry's $4B, inside that total (aws-investment). Power context: the site sits in SK's Ulsan/Mipo energy complex (Ulsan GPS 1,227 MW + SKMU 300 MW CHP). Nearly every commercial figure descends from two origins — the Jun 2025 joint announcement and the MSIT release; unanimity across ~20 restatements is republication, not corroboration.

More between SK Telecom and Amazon / AWS

The record holds no other deal between them.