Companies
Who's in the record
174 companies, funds and data-center sites, by where they sit in the supply chain.
AI labs 10on the supply chain →
- GoogleGOOGL / GOOGalso in AI chips · Clouds & compute providersA company playing several positions at once: frontier lab (Gemini/DeepMind), major cloud, and chipmaker (its TPUs are an at-scale alternative to Nvidia). At Anthropic alone it is investor, chip supplier, landlord-guarantor, reseller, and competitor.28 deals · with Anthropic, TeraWulf, Fluidstack +29
- AnthropicANTThe lab behind the Claude models. It rents compute from Amazon, Google, Microsoft, SpaceX (at the Colossus data centers) and others. Three of them, Amazon, Google and Microsoft, are also investors in it, Amazon and Google among its largest.21 deals · with Google, Broadcom, Hut 8 +21
- OpenAIThe lab behind ChatGPT. It designs and trains frontier models but owns almost none of the computers it runs on — it rents compute at enormous scale from Microsoft, Oracle, Amazon, CoreWeave and others, which is why so many of the largest deals here trace back to it. Two of those landlords, Microsoft and Amazon, are also shareholders — Amazon through the $50B of Series C preferred it bought in 2026, a stake no filing has sized.21 deals · with SoftBank, Oracle, Nvidia +21
- MetaMETAFacebook and Instagram's parent, run as a frontier AI lab. Unlike the startups it pays for its buildout largely from its own ad profits — erecting gigawatt-scale data centers (Prometheus; Hyperion partly with outside money), buying nuclear power, and designing its own chips.14 deals · with Lenders & bondholders, AMD, CoreWeave +14
- SpaceXSPCXalso in Clouds & compute providersElon Musk's rocket-and-satellite company, which absorbed his AI lab xAI in February 2026 and listed on Nasdaq that June. In this system it is the owner of the Colossus data centers in and around Memphis and, since May 2026, a landlord: it rents capacity out by the month to Anthropic and Google — and, by Reflection AI's own account, to Reflection AI — while training its own Grok models on what it keeps, and after an initial period (for Google, the end of 2026) either side can end each rental on 90 days' notice.6 deals · with Anthropic, Google, Reflection AI +7
- CohereA Canadian AI company, founded in Toronto in 2019, that builds language models and an AI platform for businesses and governments, sold on the promise that customers keep control of their data and of where their AI runs. It rents its computing rather than owning it — from CoreWeave, from Bell's AI Fabric in Canada, where HIVE's BUZZ HPC is installing Nvidia GPUs for it at Merritt, British Columbia, and, from 2027, from Boost Run — and in October 2026 began raising a round of up to C$7 billion, with Bell new among its investors, Nvidia returning, and the Government of Canada committing an equity investment of up to C$1.6 billion.2 deals · with Boost Run, HIVE Digital, Bell Canada +1
- Thinking Machines LabAn AI lab founded by Mira Murati, OpenAI's former chief technology officer, that builds its own models — among them Inkling, whose weights it publishes for anyone to download — and charges for fine-tuning and running models on its Tinker platform. It gets its computing from several suppliers: Google Cloud's Nvidia GB300 machines, a gigawatt-scale partnership with Nvidia announced in March 2026, since May 2026 5,000 Nvidia B300 GPUs from Boost Run under orders it cannot cancel, and, since September 2026, Crusoe, which it pays $65 million a year to serve its open models.2 deals · with Boost Run, Crusoe
- PoolsideAn AI lab founded in San Francisco in 2023 to build models that write software, among them its open-weight Laguna models. In August 2026, by its letter to investors as the press reported it, it licensed its model-building system to Nvidia for $6B, agreed a $1B investment from Nvidia at a $12B valuation before the new money and saw Nvidia offer jobs to 109 of its staff, while its founders stayed.1 deal · with Nvidia
- Reflection AIA small open-weights AI lab founded in 2024 by two former Google DeepMind researchers and backed by Nvidia. It owns no data centers: its first compute deal is the monthly SpaceX rental recorded here, followed by a second with Nebius.1 deal · with SpaceX
- World LabsAn AI lab in San Francisco, co-founded in 2024 by the AI researcher Fei-Fei Li, that builds models which generate, reconstruct and simulate 3D environments from text, images and video, and technology for robot learning and simulation. AMD, one of its investors since 2024 and since 2025 its partner in training and running its models on AMD GPUs, agreed in September 2026 to buy it outright for about $8.2 billion in AMD shares; the deal is pending, and AMD's latest 10-Q expects it to close by the end of 2026.1 deal · with AMD
GPU buyers outside the chain 2
- Hyundai Motor GroupThe Korean car group behind Hyundai and Kia. In the Korea–Nvidia GPU plan it is one of four companies allotted Nvidia chips: 50,000 Blackwell GPUs to train and run AI for its factories, self-driving cars and robots, in a collaboration with Nvidia and the government that Nvidia's announcement puts at about $3 billion.1 deal · with Korean government, Nvidia, Samsung +2
- TeslaTSLAThe American electric-car maker, which also builds robots and designs its own AI chips for its cars, robots and data centers. It does not make those chips itself: in July 2025 it signed a contract with Samsung to make them at Samsung's new fab in Texas, which Samsung values at about $16.5 billion through 2033.1 deal · with Samsung
Clouds & compute providers 25on the supply chain →
- GoogleGOOGL / GOOGalso in AI chips · AI labsA company playing several positions at once: frontier lab (Gemini/DeepMind), major cloud, and chipmaker (its TPUs are an at-scale alternative to Nvidia). At Anthropic alone it is investor, chip supplier, landlord-guarantor, reseller, and competitor.28 deals · with Anthropic, TeraWulf, Fluidstack +29
- CoreWeaveCRWVThe archetypal 'neocloud': it borrows billions, buys Nvidia GPUs, and rents the computing power out under long-term contracts to Microsoft, OpenAI, Meta and others. Born as a crypto-mining shop; whether GPUs hold value long enough to repay the debt is the open dispute about it.20 deals · with Lenders & bondholders, Blackstone, Nvidia +10
- MicrosoftMSFTA software giant and owner of the Azure cloud. It is OpenAI's biggest investor by stake (about 24%) and original compute landlord, holds one of the world's largest AI chip fleets, and increasingly also rents capacity from smaller clouds.18 deals · with Nvidia, Anthropic, OpenAI +21
- Amazon / AWSAMZNOwner of AWS, the biggest cloud. It is Anthropic's largest investor and compute landlord, and since 2026 a $50B shareholder in OpenAI as well — both labs have committed more than $100B each of cloud spend back to AWS. It designs its own AI training chip (Trainium) to reduce its dependence on Nvidia.17 deals · with Vistra, Lenders & bondholders, Anthropic +13
- OracleORCLA database-software giant reinvented as an AI landlord: its cloud arm leases and operates giant GPU data centers, with OpenAI as the anchor tenant via a Stargate partnership the companies say exceeds $300B.10 deals · with OpenAI, SoftBank, MGX +14
- NebiusNBISAn Amsterdam-headquartered neocloud (the former Dutch parent of Russia's Yandex) that rents out GPU capacity. Nvidia is an investor; Microsoft and Meta are anchor customers.7 deals · with Nvidia, Lenders & bondholders, AIB Data Centers +2
- LambdaA California 'neocloud' that buys Nvidia GPUs, installs them in leased data-center space and rents the computing time out, borrowing against the chips and its customers' contracts to pay for them; Nvidia is one of its investors. Microsoft, which Lambda says it has worked with for more than eight years, signed a multibillion-dollar agreement with it in November 2025. Anthropic's IPO filing says Anthropic agreed in May, June and August 2026 to spend about $41.3 billion on computing on Nvidia GPUs from Lambda over terms running into 2034, owed only as capacity is delivered and accepted — about $34.9 billion of it under the August agreement, which either side may now end: the filing says Lambda did not secure the facility lease in time, and that neither side has given notice. The Wall Street Journal had reported a $35 billion deal at the data center Hut 8 is developing in Nueces County, Texas (its Beacon Point campus), in buildings whose lease, it said, Nvidia holds — a site and a lease the filing does not name.6 deals · with Anthropic, Lenders & bondholders, Hut 8 +3
- SK TelecomSKMKorea's biggest mobile carrier (by its own count) and SK Group's data-center arm — the entity that will build and run the 'AI factories' in the SK–NVIDIA partnership.6 deals · with SK Hynix, Samsung, Nvidia +7
- SpaceXSPCXalso in AI labsElon Musk's rocket-and-satellite company, which absorbed his AI lab xAI in February 2026 and listed on Nasdaq that June. In this system it is the owner of the Colossus data centers in and around Memphis and, since May 2026, a landlord: it rents capacity out by the month to Anthropic and Google — and, by Reflection AI's own account, to Reflection AI — while training its own Grok models on what it keeps, and after an initial period (for Google, the end of 2026) either side can end each rental on 90 days' notice.6 deals · with Anthropic, Google, Reflection AI +7
- FluidstackA UK-registered, New York-headquartered AI cloud company that, since 2025, has leased whole data-center buildings from former bitcoin miners to fill with computing capacity for AI labs. Google guarantees much of that rent, and in November 2025 Anthropic named it the builder of its $50 billion US data-center programme. It is private: its last published accounts, for 2024, describe a business far smaller than the leases it has since signed, and no filing names the customers behind them.5 deals · with Google, Anthropic, TeraWulf +6
- NscaleA London-based AI-cloud company, incorporated in 2024, that builds or rents data centers in Europe and the US, fills them with Nvidia GPUs and rents the computing power out under multi-year contracts. Microsoft is its anchor customer — contracts worth up to about $43.8 billion through 2033, which its filing does not split by site, and GPUs announced for Microsoft in Texas, Norway, Portugal and the UK — and in August 2026 Anthropic signed for up to about $44.6 billion more at a West Virginia campus. Most of that is still to be delivered: of the $105.8 billion of contracts on its books in November 2026, $6.4 billion was in service. Nvidia is at once its chip supplier, a shareholder, a customer and the guarantor of its Texas rent. It filed to list its shares in New York in September 2026.5 deals · with Microsoft, OpenAI, Anthropic +3
- Crusoealso in Data centersA startup data-center developer (it began by mining bitcoin with waste gas from oil fields) that is building the flagship Stargate campus in Abilene on joint-venture money. It also runs its own AI cloud, renting out GPUs and running AI models for customers — among them Thinking Machines Lab, which pays it $65 million a year to serve its open models.4 deals · with Blue Owl, Oracle, Lenders & bondholders +3
- G42Abu Dhabi's state-backed AI conglomerate — builder of the Stargate UAE cluster, parent of data-center arm Khazna and cloud arm Core42, and cleared by Washington to buy advanced Nvidia chips. Microsoft owns a minority stake.4 deals · with Khazna, MGX, OpenAI +8
- Boost RunBRUNA small GPU cloud based in Northbrook, Illinois, that rents out servers of Nvidia GPUs — by the hour through its own platform and GPU marketplaces, or under multi-year orders — from data-center space it leases. It listed on Nasdaq in May 2026 by merging with a SPAC, and its two contracts with AI labs, Thinking Machines Lab's in May 2026 and Cohere's in September, are each worth more than ten times its revenue in 2025.2 deals · with Thinking Machines Lab, Cohere
- ChronoScaleCHRNA small Nasdaq-listed GPU cloud company: Applied Digital's former cloud business, which went public in May 2026 by merging into Ekso Bionics, a listed maker of exoskeletons whose business it has since sold. Applied Digital, a data-center developer, owns about 96% of it and keeps a majority of its board. It runs about 6,000 Nvidia H100 GPUs at three leased sites, and in August 2026 it agreed to give Microsoft about 50 MW of new GB300 capacity in Texas, before it had leased the building, with the deployment subject in part to its obtaining financing. In November 2026 it formed a venture with the developer STN, to be owned half each on US antitrust clearance, which took over STN's contract to supply GPU computing to an unnamed frontier AI lab in Odessa, Texas.2 deals · with Microsoft, STN, OD1 JV Holdings +3
- HUMAINSaudi Arabia's national AI company, launched by the sovereign wealth fund PIF in May 2025 to build data centers, run an AI cloud and make AI models, among them ALLaM, an Arabic-language model. PIF owns 51% and, since November 2026, the state oil company Aramco 49%.2 deals · with Aramco, PIF, Infra
- IRENIRENA Sydney-founded, Nasdaq-listed bitcoin miner turning itself into a GPU cloud provider: it owns power-rich sites in Texas and British Columbia, is decommissioning its mining rigs, and now rents Nvidia chips to Microsoft, Nvidia and AI developers from liquid-cooled halls it designs and builds itself. Its Microsoft contract is the anchor — nearly $10 billion over five years — and it borrowed against that contract at an investment-grade rating to buy the chips. It is also one of the companies Nvidia has taken an equity option in while selling it chips.2 deals · with Dell, Microsoft, Nvidia
- NAVER035420Korea's largest internet company and the operator of its No. 1 search engine. Its cloud arm, NAVER Cloud, is one of the companies that run the Korean government's Nvidia GPUs, and is allotted about 60,000 Nvidia GPUs of its own in the national plan (a minimum in Nvidia's release, a maximum in its Korean blog). In July 2026 Nvidia agreed to invest $1B in new NAVER shares, payable once NAVER lined up at least $9B to build an 'AI factory' of Nvidia chips, for which Brookfield offered up to $9B. Nvidia paid in November.2 deals · with Nvidia, Korean government, Samsung +3
- TensorWaveA Las Vegas-based AI cloud company, set up in 2023, that rents out computing built only on AMD's Instinct GPUs; AMD's venture arm co-led its $350 million funding round in June 2026. In November 2026 it announced a six-year agreement to provide OpenAI with 457 megawatts of computing on AMD's MI455X chips from 2027, days after the 222-megawatt Texas data-center lease it had signed with Fermi in August, with AMD backing the rent, was terminated without ever taking effect.2 deals · with AMD, Fermi America, OpenAI
- AkamaiAKAMA Cambridge, Massachusetts company best known for delivering and securing other companies' web traffic over thousands of points of presence, which has been building a cloud business since it bought Linode in 2022. In September 2026 Anthropic committed about $11.6 billion, over seven-year terms, for dedicated CPU computing capacity that Akamai expects to spend about $5.5 billion to build — the largest contract in its history, by its CEO's account — and Akamai gave Anthropic a warrant for up to about 5% of its shares.1 deal · with Anthropic
- Bell CanadaBCE / BCECanada's largest communications company, by its own count, which through Bell AI Fabric builds AI data centers across Canada — starting with a planned network of six in British Columbia — and sells the capacity and connectivity in them. In the Merritt deal it is at once the landlord of HIVE's GPU cloud, the party HIVE says pays for the GPUs Cohere runs on, and a new investor in Cohere.1 deal · with HIVE Digital, Cohere, Lenders & bondholders
- FirebirdA San Francisco AI-cloud startup that builds GPU data centers in what it calls frontier markets — Armenia first, Kazakhstan second — and rents out the computing under a US export licence it says it holds, whose conditions govern who may use it. In Kazakhstan, state-owned Kazakhtelecom is building it a data center to lease, for the Nvidia Grace Blackwell GPUs it says its licence covers.1 deal · with Kazakhtelecom, Nvidia, US government
- HIVE DigitalHIVE / HIVEA bitcoin miner, incorporated in British Columbia and run from San Antonio, Texas, that is building a GPU cloud through its subsidiary BUZZ HPC, renting out Nvidia GPUs from data centers in Canada, Sweden and Paraguay. Its largest Canadian deals sit in Bell's AI data center at Merritt, British Columbia — among them the GPUs Cohere runs on, bought with a loan secured on the chips themselves.1 deal · with Bell Canada, Cohere, Lenders & bondholders
- KTKT / 030200One of South Korea's big phone and internet carriers. Its cloud and data-center arm, KT cloud, buys Microsoft's Azure cloud under a five-year commitment and resells it, and with KT supplies Microsoft network and data-center capacity in Korea.1 deal · with Microsoft
- RUM GroupRUMThe company behind the video platform Rumble, which in June 2026 bought Northern Data, a German AI cloud company with about 22,000 Nvidia GPUs, renamed that business Quake AI and took the name RUM Group. In August 2026 it agreed to sell Anthropic about $13.7 billion of GPU computing over six years from a data center it is still developing in Maysville, Georgia, and to give Anthropic shares for a cent each as it delivers; Tether, the stablecoin company, is its largest shareholder.1 deal · with Anthropic
Data centers 22on the supply chain →
- Crusoealso in Clouds & compute providersA startup data-center developer (it began by mining bitcoin with waste gas from oil fields) that is building the flagship Stargate campus in Abilene on joint-venture money. It also runs its own AI cloud, renting out GPUs and running AI models for customers — among them Thinking Machines Lab, which pays it $65 million a year to serve its open models.4 deals · with Blue Owl, Oracle, Lenders & bondholders +3
- TeraWulfWULFA former bitcoin miner turned data-center landlord, based in Maryland and listed on Nasdaq. It owns power-rich industrial sites — a retired coal-plant site on Lake Ontario and the shuttered Century Aluminum smelter in Hawesville, Kentucky — and builds data halls on them that AI companies rent for decades. At Lake Mariner its tenant is the cloud operator Fluidstack, with Google backstopping part of the rent; at Hawesville, for the first time, the tenant is Anthropic itself, and Google has agreed to back that rent too.4 deals · with Google, Anthropic, Fluidstack +2
- Cipher DigitalCIFRA US bitcoin miner, listed on Nasdaq and formerly called Cipher Mining, that is turning its West Texas sites into leased AI data centers. Its Barber Lake site near Colorado City is leased whole to the cloud company Fluidstack, with Google guaranteeing part of the rent in exchange for share warrants; a second site, Black Pearl, is leased to Amazon Web Services.3 deals · with Google, Anthropic, TeraWulf +4
- Core ScientificCORZA bitcoin miner turning its sites into data centers it rents out. Its first colocation tenant is CoreWeave, which rents about 590 MW at five of its sites, pays for most of the construction and makes up most of its revenue; CoreWeave tried to buy it in 2025 and its shareholders said no. In July 2026 it signed AMD as a second tenant and gave AMD the right to buy up to 30 million of its shares.3 deals · with CoreWeave, AMD
- Hut 8HUTA former bitcoin miner, based in Miami and listed on Nasdaq and Toronto, that now builds AI data-center campuses on power-rich sites, leases them for 15 years at a time, and borrows against the rent on the investment-grade bond market with no recourse to the parent company. Its two campuses in this monitor are River Bend in Louisiana, leased to the cloud operator Fluidstack for Anthropic with Google guaranteeing the rent, and Beacon Point in Texas, leased in two halves to a company Hut 8 has never named and the Financial Times says is Nvidia. It still mines bitcoin through its affiliate American Bitcoin, which uses about 700 megawatts of Hut 8's power sites.3 deals · with Anthropic, Google, TeraWulf +5
- KhaznaThe UAE's largest data-center landlord by its own count — a G42 subsidiary that builds the warehouses Abu Dhabi's AI push runs in and rents them wholesale to clouds and government. Its scale is real but self-reported: the company has stated four different portfolio sizes inside one year, and none of them is audited.3 deals · with G42, MGX, OpenAI +7
- Applied DigitalAPLDA Dallas company that builds large data-center campuses, in North Dakota and the South, and rents them out on leases of about 15 years; it began by hosting crypto-mining machines, which it still does at two North Dakota sites. Its first AI campus, Polaris Forge 1 in Ellendale, is leased entirely to CoreWeave; its four others are leased to big cloud companies it does not name. It also owns about 97% of ChronoScale, a listed GPU-cloud company formed from its cloud business in 2026.2 deals · with Lenders & bondholders, CoreWeave, STN +3
- Digital RealtyDLRA US property trust (a REIT) that builds, owns and rents out data centers around the world. In this monitor it is Blackstone's partner twice over: it put four large campuses in Frankfurt, Paris and Northern Virginia into a venture that Blackstone's funds took 80% of from 2024, and in June 2026 it bought Blackstone's stakes in three of the venture's Northern Virginia buildings.2 deals · with Blackstone
- Fermi AmericaFRMI / FRMIA Texas company, listed in New York and London, that is developing Project Matador: a campus in the Texas Panhandle, on land leased from the Texas Tech University System, meant to make its own electricity, from gas turbines first and nuclear reactors later, and to rent data centers to AI companies. It had earned no revenue by the end of September 2026. Its first tenant lease, with the AMD-based cloud TensorWave, was terminated in November 2026 before it ever took effect.2 deals · with TensorWave, AMD, Siemens Energy
- SB EnergySoftBank's energy-and-data-center developer, spun toward an IPO in September 2026. It builds solar and battery plants and, more recently, giant leased data-center campuses in Texas and Ohio that it will own and operate for OpenAI and SoftBank as tenants. As of its IPO filing it has signed leases for 8.8 gigawatts of data-center capacity but has not yet switched on a single one: every dollar of its $439 billion 'backlog' is a lease not yet started, which is why Nvidia's guaranty behind the Ohio tenant's leases matters so much to it.2 deals · with OpenAI, SoftBank, Nvidia
- AIB Data CentersAIBA small data-center developer listed in New York, called BlockchAIn Digital Infrastructure until June 2026, that is turning its former bitcoin-hosting site in Moore, South Carolina, known as CLT1, into a data center for AI computing. Its first customer is the AI cloud company Nebius, which signed in September 2026 for 50 megawatts of computing capacity there for 12 years, guaranteed by Nebius's parent company; AIB also owns a site in Texas and holds letters of intent for three more.1 deal · with Nebius
- Aligned DCOne of the biggest US data-center landlords, by its own count: it builds and runs the buildings and power, and rents them to clouds and AI companies. Grown by Macquarie's infrastructure funds from 2018, it was sold in 2026 to the AIP/MGX/GIP consortium at a value of about $40 billion — by its sellers' count, the largest data-center deal to date.1 deal · with AIP (fund), MGX, BlackRock GIP +1
- Blackstone Digital Infrastructure TrustBXDCA property trust (a REIT), run under contract by an affiliate of Blackstone, that listed on the New York Stock Exchange in May 2026 to buy newly built data centers already leased to the biggest clouds. Its first purchase, agreed in November 2026, is 75.1% of 13 data centers Amazon built in northern Indiana and Mississippi, which Amazon rents back.1 deal · with Amazon / AWS, Lenders & bondholders
- BlockfusionA New York company that runs a data center for crypto-mining customers on the site of a former power plant in Niagara Falls, New York, and is converting it into an AI data center; CoreWeave is its first AI tenant. It plans to list on Nasdaq by merging with Blue Acquisition, a listed shell company, but the shareholder vote set for November 2026 was postponed.1 deal · with CoreWeave
- CleanSparkCLSKA bitcoin miner, listed on Nasdaq, that now calls itself a data-center developer: it is turning the power it holds for mining into data centers it leases out. Its first tenant is a Meta subsidiary, which in July 2026 leased a data center for 175 megawatts of computing load at its Sandersville, Georgia site for 20 years; a CleanSpark subsidiary borrowed $2.276 billion of bonds to pay for the build, and CleanSpark mines bitcoin there until the data center takes over the site's power.1 deal · with Meta, Lenders & bondholders
- Digi Power XDGXXA bitcoin miner, called Digihost until 2025 and listed on Nasdaq and in Canada, that is turning its power sites into AI data centers (Alabama first, New York still in planning) and also rents out GPUs. Its first large data-center customer is the chipmaker Cerebras, which in May 2026 signed for the exclusive use of a 40-megawatt data center Digi Power X is building in Columbiana, Alabama. The last 25 megawatts come only if Digi Power X raises financing that Cerebras approves; in October 2026 it had a $200 million commitment letter, not yet a loan.1 deal · with Cerebras, Lenders & bondholders
- EverWindA privately held Nova Scotia energy-infrastructure company that owns and operates the marine terminal at Point Tupper on Cape Breton Island, with wind farms in development across the province and a green hydrogen and ammonia project planned at the site. In October 2026 it announced plans for a data-centre campus there, planned at 420 megawatts, and a long-term lease with Anthropic for the first 95 megawatts.1 deal · with Anthropic
- KazakhtelecomKazakhstan's largest telecom company, controlled by the state fund Samruk-Kazyna. Through KT-Telecom, a venture it owns half of with another Samruk-Kazyna company, it is building Data Center Valley, a state data-center campus in Ekibastuz — Firebird's building there among them, to be handed over and leased to Firebird.1 deal · with Firebird, Nvidia, US government
- Riot PlatformsRIOTOne of the largest US bitcoin miners, based in Colorado and listed on Nasdaq, now converting its Texas mining sites into leased AI data centers. Its Rockdale campus, a former aluminum-smelter site with about 700 megawatts of developed power, got its first tenant (AMD, 50 megawatts) in early 2026 and its second, Anthropic, in August 2026 — Riot called it only 'a leading frontier AI lab' until its November quarterly filing, which names Anthropic PBC. In October 2026 Riot signed a lease of its Corsicana campus with the same company.1 deal · with Anthropic
- TCS HyperVaultThe AI data-center business of Tata Consultancy Services (TCS), India's largest IT-services company, set up in 2025 to build large AI-ready data centers in India and rent the space to AI labs and cloud companies, which bring their own computers. The private-equity firm TPG holds 49% of it on a fully diluted basis. OpenAI agreed in February 2026 to be its first customer; it has since secured land for a campus in Hyderabad and won an auction for land near Pune.1 deal · with OpenAI
- WhiteFiberWYFIA New York company, listed on Nasdaq and majority-owned by Bit Digital, that turns industrial buildings in Québec and North Carolina into AI data centers and also rents out GPUs as a cloud service. Its largest contract is Nscale's: 40 megawatts at NC-1, a former manufacturing building in Madison, North Carolina, for ten years, about $865 million by WhiteFiber's count.1 deal · with Nscale, Lenders & bondholders
- Zone FrontierZONEA listed company, called CleanCore Solutions until August 2026, that left its cleaning-products business and its Dogecoin holdings in 2026 to develop AI data centers. It owns 79% of the venture building a Minnesota data center with 40 megawatts of IT load, fully pre-leased to the chipmaker Cerebras; a West Texas campus is at an earlier stage.1 deal · with Cerebras
Data-center sites 13
- Stargate AbileneThe flagship Stargate campus in Abilene, Texas: eight buildings and 1.2 GW of power, built by the startup Crusoe in a joint venture majority-owned by funds managed by Blue Owl, on land leased from Lancium, and leased whole by Oracle, which runs Nvidia GB200 systems in it for OpenAI. Six of the eight buildings had been handed over by September 2026.3 deals
- Colossus 2The second, much larger Memphis-and-Southaven site, filled with Nvidia's newest Blackwell chips and financed partly through an unusual vehicle (Valor SPV) that owns the GPUs and leases them back. SpaceX trains its own Grok models here and, since mid-2026, rents slices of it out by the month: Anthropic's lease spans both Colossus sites and, by Reflection AI's own account, Reflection AI's is here, while Google's ~110,000-GPU lease is not tied to a site by any source.2 deals
- Google CheyenneGoogle's first data center in Wyoming, planned on a site south of Cheyenne that it bought from Crusoe, which had started the project with Tallgrass Energy. Its power is being assembled from several suppliers at once: a fuel-cell plant AEP is building, gas generators of Tallgrass's and Black Hills', and the grid, with carbon capture planned for the fuel cells.2 deals
- Meta HyperionMeta's largest planned data center, in rural Louisiana — 5 GW at end-state, partly financed off Meta's balance sheet through a bond-funded joint venture, and powered by a purpose-built utility gas buildout.2 deals
- Colossus 1The first Memphis data center xAI built for itself — the site that proved a lab could stand up its own compute at speed instead of renting from a cloud — and since May 2026 rented out whole. SpaceX, which absorbed xAI, leases all of its capacity to Anthropic by the month.1 deal
- CoreWeave DentonA data-center campus in Denton, Texas, that Core Scientific built on land it leases from the City of Denton and licenses whole to CoreWeave: 262 MW, the largest of the five Core Scientific sites CoreWeave rents. The chips inside are CoreWeave's; a lender to CoreWeave and the Wall Street Journal say they are meant for OpenAI, and Core Scientific's chief executive, citing public statements, has said OpenAI is working with CoreWeave there — though no Core Scientific filing says so.1 deal
- HeliosA data-center campus Galaxy is building for CoreWeave on a former bitcoin mine it owns in Dickens County, in the panhandle region of West Texas: 526 MW of critical IT on about 800 MW of the campus's approved power, the first 133 MW handed over in 2026 and the other 393 MW due from 2027. Another 830 MW of its approved power has no tenant yet.1 deal
- Meta El PasoMeta's 1-gigawatt campus in northeast El Paso, Texas — under construction since October 2025, due to start coming online in 2028, and since July 2026 the second Meta site financed off Meta's balance sheet through an 80/20 venture with an outside owner (BlackRock's funds here, per the two companies' July release; Blue Owl's for Hyperion's first campus) — a closing Meta's filings record without naming El Paso. Locally it is contested over the gas plant proposed to bridge its power and the tax deal that brought it.1 deal
- Meta PrometheusMeta's first gigawatt-scale data center, in New Albany, Ohio — racing, Meta said in 2025, to be the first 1 GW+ AI cluster online, with its own on-site gas turbines while the nuclear deals mature.1 deal
- MS Fairwater (Atlanta)Microsoft's second 'Fairwater' AI data center, in Fayetteville near Atlanta, Georgia: by Microsoft's account the same design as the Wisconsin original — Nvidia GB200 racks, on a dedicated network linking the two — and running since October 2025, months before Wisconsin's first facility. Unlike Wisconsin it is not Microsoft's own build: Epoch AI says QTS built it with Microsoft as the tenant, and no Microsoft statement in the record gives a dollar figure or the site's power.1 deal
- MS Fairwater (Wisconsin)Microsoft's first 'Fairwater' AI data center, on land in Mount Pleasant, Wisconsin that it bought from the village in 2023 and builds on with its own money: one cluster of Nvidia GB200 servers, whose equipment came online in April 2026 by Microsoft's account and which it declared fully operational in June, with a second facility of similar size that Microsoft schedules for 2028 and two more campuses proposed. Microsoft says its AI datacenters power OpenAI, Microsoft AI, Copilot and other AI workloads, and that the Fairwater sites its network links will work together to support them.1 deal
- Project RainierThe data-center campus Amazon built for Anthropic (New Carlisle, Indiana and other sites), filled with about a million of Amazon's own Trainium chips rather than Nvidia GPUs.1 deal
- Stargate UAEThe Abu Dhabi campus where the Stargate pattern goes sovereign: G42 builds and pays for a one-gigawatt cluster that OpenAI and Oracle will operate, inside a planned five-gigawatt US–UAE campus — by OpenAI's account the first Stargate outside the US, mirroring Abilene with a state champion instead of a startup as builder.1 deal
Power 28on the supply chain →
- ConstellationCEGThe largest US nuclear-plant operator, by its own count. It is restarting Three Mile Island Unit 1 to sell the power to Microsoft, and from June 2027 Meta's money is to keep Illinois' Clinton plant open. Its 20-year contracts with Amazon and Google back upgrades meant to add about 1,080 MW at reactors already running.4 deals · with Microsoft, Amazon / AWS, Meta +1
- Bloom EnergyBEA California maker of fuel cells — units that turn natural gas into electricity on site, without burning it — which it sells as fast power for data centers. Oracle intends to buy up to 2.8 GW of them and received 2.15 million Bloom shares through a warrant; ventures with Brookfield, which finance and own many of the systems Bloom sells, bought about 43% of its 2025 sales.3 deals · with Oracle, Brookfield, Google +1
- VistraVSTA Texas-based power producer selling twenty years of nuclear power to two tech giants: to Amazon, half the output of its Comanche Peak plant in Texas, for a data center Amazon is building beside it; to Meta, the existing output of two Ohio plants (Perry and Davis-Besse) plus extra megawatts it plans to add by upgrading those two and a third plant, Beaver Valley — part of Meta's nuclear shopping spree of up to 6.6 GW. It also sells Amazon the output of Oak Hill, a solar plant it built on a reclaimed lignite mine in East Texas.3 deals · with Amazon / AWS, Meta, TerraPower +1
- DTE ElectricThe regulated electric utility for Detroit and southeast Michigan, part of DTE Energy. It has contracted to power two hyperscale data centers, each on a minimum bill of 80% of the contracted capacity — Oracle's in Saline Township (approved without a hearing in December 2025, now on appeal) and Google's in Van Buren Township (conditionally approved in October 2026 after a contested case) — with Oracle paying for the batteries built to serve its campus, and Google for up to 1,600 MW of new solar or wind farms and 480 MW of energy storage, some of their cost capped at levels its contract keeps confidential.2 deals · with Oracle, Google
- Siemens EnergyThe German maker of gas turbines and grid equipment such as transformers, spun off from Siemens; it also owns the wind-turbine maker Siemens Gamesa, and the two are to take one new name, Omterra, in stages beginning later in 2026. With GE Vernova and Mitsubishi Power it is one of the three big makers of the large gas turbines that new power plants are built around: buyers pay a fee to reserve a slot in its factory queue, it aims to turn its reservations into firm orders within about six months, its factories are booked out through September 2028, and about a quarter of the gigawatts its customers have committed are for data centers.2 deals · with Fermi America
- AEPAEPAmerican Electric Power, one of the largest US utilities, serving 5.6 million customers in 11 states over the country's largest transmission network. Outside its own territory, it is building a 702 MW plant of Bloom Energy fuel cells near Cheyenne, Wyoming, to sell its power to Google for 20 years.1 deal · with Google, Bloom Energy
- AES IndianaThe regulated electric utility for about 533,000 customers in and around Indianapolis, legally Indianapolis Power & Light Company, majority-owned through IPALCO by The AES Corporation. In October 2026 Indiana's regulators approved its contract to power Google's planned data center in Monrovia, together with the batteries, solar and new lines it is adding to serve the load.1 deal · with Google
- Black Hills Corp.BKHA utility company based in Rapid City, South Dakota, serving gas and electric customers in eight states, the Cheyenne, Wyoming area among them. Under agreements through 2048 it is to power Google's planned Cheyenne data center: up to 590 MW from the grid, most of it from new gas generation it builds at Google's cost, while it manages about 2.1 GW of other companies' plants for the campus on a private grid.1 deal · with Google
- Entergy ArkansasThe regulated electric utility for about 738,000 customers in 63 of Arkansas's counties, a subsidiary of Entergy Corporation. Under a 20-year contract approved in December 2025 it is building a 600 MW solar plant with batteries whose cost, by its account, Google's rates for its West Memphis data center are set to pay; an amendment awaiting approval adds two batteries, new lines and a solar purchase, which it says Google will pay for too.1 deal · with Google
- Entergy LouisianaThe regulated Louisiana utility planning ~7.5 GW of new gas generation to power Meta's Hyperion campus — one of the clearest cases of a single AI customer reshaping a state's grid.1 deal · with Meta
- Fervo EnergyFRVOA Houston company that makes electricity from hot rock deep underground — 'enhanced geothermal', which borrows oil-and-gas drilling to reach heat where there is no natural hot spring — listed on Nasdaq since May 2026. At Cape Station in Beaver County, Utah, its first 33 MW unit began commercial operation on Sep 30 2026, and it has sold Google the output of 396 MW more from 2028.1 deal · with Google
- GE VernovaGEVGE's spun-off power business and the largest Western maker of the big gas turbines that new power plants are built around. Its order book is where the electricity side of the AI buildout shows up first: customers now pay a deposit just to reserve a place in its factory queue, new turbines are sold out through 2028, and at its April count roughly a fifth of what it had under contract was explicitly for data centers — the rest was what it calls 'traditional' customers, such as utilities and independent power producers.1 deal
- GeneracGNRCA Wisconsin generator maker, by its own account one of the leading names in backup power in the US, whose large diesel generators keep data centers running if their grid power fails. In September 2026 it agreed to supply Amazon's data centers, expecting first deliveries of $2.4 billion in 2027 and 2028, and gave Amazon a warrant on up to 1.69 million of its shares that unlocks mostly as Amazon pays.1 deal · with Amazon / AWS
- Georgia PowerGeorgia's largest electric utility, owned by Southern Company and regulated by the state's Public Service Commission. It will power OpenAI's planned 3.2 GW 'Project Camellia' campus near Savannah for 25 years, under a contract the Commission's staff let take effect in August 2026 without a vote and that Georgia Power filed as a trade secret.1 deal · with OpenAI
- Kairos PowerA small-modular-reactor developer building molten-salt-cooled reactors at Oak Ridge, Tennessee. Google signed a master agreement for up to 500 MW of its plants by 2035; the first, Hermes 2, broke ground in 2026 and sells its electricity to the Tennessee Valley Authority.1 deal · with Google
- NextEra EnergyNEEOne of North America's largest power companies: it owns Florida Power & Light, the biggest US electric utility, and NextEra Energy Resources, which builds and runs wind, solar, gas, battery and nuclear plants. It is restarting Iowa's shut Duane Arnold nuclear plant to sell most of its power to Google for 25 years, and the two are also developing data-center campuses together while Google Cloud powers NextEra's own digital overhaul.1 deal · with Google
- NiSourceNIThe parent of NIPSCO, the electric and gas utility for northern Indiana, and of Columbia Gas utilities in five other states. It has contracts to power data centers — Amazon's, Alphabet's and Microsoft's — through NiSource Generation Company (GenCo), an affiliate in which Blackstone holds 19.9% through GenCo's parent, and says those customers fully fund the new plants, batteries and lines built to serve them.1 deal · with Microsoft
- NV EnergyNevada's electric utility: two companies, Sierra Pacific Power and Nevada Power, that do business as NV Energy, owned by Berkshire Hathaway Energy. Under its Clean Transition Tariff, first used for a Fervo geothermal plant, it buys power from a new plant a large customer brings it and passes that power to the customer; in 2026 it contracted to buy 50 to 150 MW of new geothermal power from Ormat for Google's data centers.1 deal · with Ormat Technologies, Google
- OG&EOklahoma Gas and Electric Company, the electric utility for about 913,000 customers in Oklahoma and western Arkansas, Oklahoma City among them, owned by OGE Energy Corp. Under contracts Oklahoma's regulators approved in November 2026 it is to power three Google data centers in Muskogee County and Stillwater, and to buy, for 15 years, capacity from two solar farms whose capacity Google holds.1 deal · with Google
- OkloOKLOA startup building small 'powerhouse' fission plants. Under a January 2026 prepayment agreement Meta can prepay for power and fund the work on a planned 1.2 GW Oklo campus in southern Ohio, which Oklo's January 2026 release targeted to reach full size by 2034; an initial amount of Meta's funding, released in November 2026, went to Centrus, which has a conditional agreement to supply fuel for the powerhouses that would serve Meta.1 deal · with Meta, Vistra, TerraPower
- Ormat TechnologiesORAA Reno, Nevada geothermal company that builds, owns and runs geothermal power plants, in the US and in countries such as Kenya, Guatemala and Indonesia, on power units of its own design, and sells their electricity under long contracts. In February 2026 it agreed to build 50 to 150 MW of new geothermal plants in Nevada and sell their power to NV Energy for Google's data centers.1 deal · with NV Energy, Google
- Quaise EnergyA Houston company developing geothermal power from 'superhot' rock far underground. Its first plant, Project Obsidian near Oregon's Newberry Volcano, is not built yet: its first phase will use conventional drilling, and a later one is expected to use millimeter-wave drilling, a technology Quaise is still developing. Google has agreed to buy 50 MW of its power from as early as 2030.1 deal · with Google
- Solaris Energy InfrastructureSEIA Houston company that rents out natural-gas turbines and the equipment around them to power data centers on site, beside an older business serving oil and gas wells. One data-center customer brought in 96% of its power revenue in 2024 and 88% in 2025, and Solaris co-owns a venture with that customer, Stateline Power, which is to rent it about 900 MW of generating equipment; SpaceX's own filings show the customer's half is held by SpaceX subsidiaries.1 deal · with SpaceX, Stateline Power
- Stateline PowerA joint venture formed in April 2025 to own about 900 MW of power-generation equipment — turbines and the gear around them — and rent it to SpaceX, to run a data center off the grid. Solaris Energy Infrastructure owns 50.1% and runs it; a SpaceX subsidiary owns the other 49.9%, so the customer co-owns the company it rents its power plant from. Most of the equipment is paid for with a loan secured only on the equipment and its contracts.1 deal · with SpaceX, Solaris Energy Infrastructure
- Talen EnergyTLNAn independent power producer that owns 90% of the Susquehanna nuclear plant in Pennsylvania. It sold Amazon the data-center campus next to the plant and now sells Amazon the plant's power — the deal that started the national fight over whether a data center wired straight into a reactor still has to pay for the shared grid.1 deal · with Amazon / AWS
- TerraPowerThe Bill Gates-founded nuclear company; Meta is funding development of two of its Natrium reactors, due as early as 2032, with rights to energy from up to six more.1 deal · with Meta, Vistra, Oklo
- X-energyXEA Rockville, Maryland developer of small nuclear reactors, the 80 MW Xe-100, expected to be deployed four to a plant, and of the fuel they burn, listed on Nasdaq since April 2026. Amazon held 22.9% of its Class A shares at the end of June 2026 and has first call on its reactor production from 2031 to 2039; its first plants are planned at Dow's site in Seadrift, Texas and, for Amazon, at Energy Northwest's site in Washington.1 deal · with Amazon / AWS
- Xcel EnergyXELA Minneapolis-based utility company that supplies electricity and gas in eight states, Minnesota among them, through Northern States Power and its other utilities. Its Minnesota utility has a 15-year contract, awaiting state approval, to power a Google data center at Pine Island, under which Google would pay for 1,900 MW of new wind, solar and long-duration batteries that Xcel would own for all its customers.1 deal · with Google
Servers, storage & cooling 9on the supply chain →
- DellDELLA Texas maker of servers, storage and PCs whose racks hold the Nvidia GPUs that AI clouds rent out. On this map it sells to IREN — about $5.8 billion of GB300 systems for IREN's Microsoft contract, about $2.3 billion and $1.2 billion more of B300 systems in March 2026, about $1.6 billion of B200 systems for Nvidia's own contract with IREN, and, in September 2026, about $6.7 billion more for delivery from the second half of 2027, for no customer IREN names — and its financing arm leases equipment to IREN and to Nscale's Texas and North Carolina projects. Every dollar figure here is its customers' disclosure; Dell's SEC filings since mid-2025 do not name IREN.2 deals · with IREN, Microsoft, Nvidia
- SandiskSNDKA maker of NAND flash memory, the chips inside SSDs and phones, which Western Digital spun off in February 2025. Since January 2026 it has been selling a growing share of its output years ahead under long-term contracts it calls New Business Models.2 deals · with Nanya Technology
- SupermicroSMCIA San Jose, California maker of servers and storage systems, including the GPU servers AI clouds run on. In 2024 it took a 10-year lease on 21 MW of data-center space in Vernon, California, and sublicensed all of it to Lambda, a GPU cloud that is also its customer, while staying liable for the rent; it also holds $92.5 million of Lambda stock.2 deals · with Lambda, STN, ChronoScale +3
- BackblazeBLZEA San Francisco company that stores data on hard drives in its own data centers and rents the space out by the terabyte (B2 Cloud Storage), beside a computer-backup service. In June 2026 it signed the largest contract in its history, to supply storage to CoreWeave, and gave CoreWeave warrants on its own shares as part of the bargain.1 deal · with CoreWeave
- FabrinetFNalso in Networking & opticsA contract manufacturer, incorporated in the Cayman Islands with its factories mostly in Thailand, that builds optical components and modules and other complex products for companies such as Cisco, Nvidia and Nokia. Since 2025 it has also built high-performance computing boards for Amazon, which holds a warrant for up to 381,922 Fabrinet shares that unlocks as Amazon pays it.1 deal · with Amazon / AWS
- Penguin SolutionsPENGA US builder of AI computing clusters: it designs, installs and runs GPU systems for other companies (it assembled Meta's 16,000-GPU Research SuperCluster and SK Telecom's Haein cluster) and sells memory modules under the SMART Modular brand. Until October 2024 it was SMART Global Holdings. SK Telecom bought a strategic stake in it in 2024 and then bought its AI hardware too; in October 2026 SK Telecom sold that stake to SK hynix, the memory maker in the same Korean group.1 deal · with SK Telecom, SK Hynix
- SeagateSTXA big hard-drive maker, like Western Digital. It said in October 2026 that most of its data-center drive supply is allocated under long-term agreements through 2028, and trade press reported waits of up to two years in late 2025 — scarcity in the cheapest tier of the storage stack.1 deal
- Western DigitalWDCOne of the big hard-drive makers. Unglamorous, but AI data centers store oceans of data on hard drives — and early in 2026 it said it was pretty much sold out for the year.1 deal
- VertivVRTMaker of the unglamorous essentials inside data centers — power distribution and cooling gear. Its order backlog, which more than doubled in 2025, is a preview of how many racks are actually coming.no deals
Networking & optics 14on the supply chain →
- NvidiaNVDAalso in AI chipsDesigner of the GPUs most AI runs on. Increasingly it is also a financier: it invests in its own customers (CoreWeave, Nebius, OpenAI, xAI's GPU vehicle), who then spend the money on its chips — the 'circular capital' pattern this monitor keeps flagging.33 deals · with OpenAI, Anthropic, Oracle +44
- BroadcomAVGOalso in AI chipsA chip giant with three roles here: it supplies the networking silicon that stitches GPUs into clusters, it co-develops custom AI chips for companies routing around Nvidia — OpenAI's accelerators, Google's TPUs (which it also supplies to Anthropic), Meta's MTIA — and it stands behind Anthropic's leases of racks built on its chips, a first batch in June 2026 and a second, larger one in October.8 deals · with Anthropic, Google, Blackstone +11
- MarvellMRVLalso in AI chipsA US chip designer that owns no factories. Its data-center business sells the networking and optical chips that move data between AI servers, and it designs custom chips for the cloud giants — accelerators and the 'XPU attach' parts that sit around them. It gives some of those customers warrants on its own stock: Amazon (two, 2024 and 2025) and Google (2026) hold warrants that vest mostly as they buy Marvell's chips. In November 2026 it agreed to buy Lumentum, a laser maker with factories of its own, paying in Marvell shares; the deal is pending.3 deals · with Google, Amazon / AWS, Lumentum
- Applied OptoelectronicsAAOIA Texas maker of the lasers and fiber-optic transceivers that carry data inside data centers, and of cable-TV network equipment. Microsoft, its biggest data-center customer in 2025, pays it to reserve production lines for its goods and holds a right of first refusal if certain offers are made to buy it; since 2025 Amazon holds a warrant for up to 7.95M of its shares that unlocks as Amazon pays it.2 deals · with Amazon / AWS, Microsoft
- LumentumLITEA maker of laser chips and other optical components for data-center networks, where its latest annual report describes a shift to faster 200G-per-lane links. In March 2026 Nvidia put in $2B for convertible preferred shares, beside a non-exclusive agreement pairing a multi-billion purchase commitment with rights to Lumentum's future capacity for advanced laser components. In November 2026 Marvell agreed to buy it, paying in Marvell shares; the deal waits on both companies' stockholders and the regulators.2 deals · with Marvell, Nvidia, Coherent
- AristaANETThe networking-equipment company whose switches wire up many AI clusters; 42% of its 2025 revenue came from just two customers, Microsoft and Meta.1 deal · with Microsoft, Meta
- Astera LabsALABA US chip company whose connectivity chips — PCIe and CXL retimers, smart cable modules, memory controllers and Scorpio fabric switches — move data between the processors, memory and networks inside AI servers. Amazon holds three warrants on its stock, from 2022, 2023 and 2026, that unlock as Amazon pays for its products; the newest counts up to $6.5B of payments.1 deal · with Amazon / AWS
- CiscoCSCOThe networking-equipment giant — a named Stargate UAE consortium member that signed a memorandum of understanding to supply the fabric and security layer that ties the cluster together.1 deal · with G42, Khazna, OpenAI +4
- CoherentCOHROne of the few makers of the specialized EML lasers inside high-speed optical links — a supply reportedly short worldwide, with lead times stretching past 2027. In March 2026 Nvidia bought $2B of its shares, beside a non-exclusive agreement pairing a multi-billion-dollar purchase commitment with rights to future capacity.1 deal · with Nvidia, Lumentum
- CorningGLWA US glass company, the inventor of low-loss optical fiber, whose largest business makes the fiber, cable and connectors that carry data inside data centers; it also makes glass for phones, displays and cars. In 2026 Nvidia paid it $500 million for warrants on its shares and put down a $1.0 billion deposit for its products as it builds three new US plants, while Meta, Amazon and other hyperscalers signed multiyear agreements of their own to buy its fiber.1 deal · with Nvidia
- FabrinetFNalso in Servers, storage & coolingA contract manufacturer, incorporated in the Cayman Islands with its factories mostly in Thailand, that builds optical components and modules and other complex products for companies such as Cisco, Nvidia and Nokia. Since 2025 it has also built high-performance computing boards for Amazon, which holds a warrant for up to 381,922 Fabrinet shares that unlocks as Amazon pays it.1 deal · with Amazon / AWS
- NokiaNOK / NOKIAThe Finnish maker of mobile-network equipment — the radios and base stations that carry phone traffic. It also sells data-center switches, with a published design for wiring clusters of Nvidia GPUs, and the routers and optical gear that link data centers, a business it grew by buying Infinera in 2025. In November 2025 Nvidia bought 2.90% of Nokia for $1B, beside a pact for Nokia's next base stations to run on Nvidia's computing platform.1 deal · with Nvidia
- QualcommQCOMalso in AI chipsThe US chip designer best known for the processors and modems in smartphones, now building a data-center business. In September 2026 it announced work with Amazon on custom AI chips and optical connectivity over several generations, and gave Amazon a warrant for up to 25 million Qualcomm shares that unlock as Amazon commits to, orders and pays for its chips.1 deal · with Amazon / AWS
- InnoLightChinese maker of the optical transceiver modules that carry data between racks; believed to supply most of Nvidia's 800G modules (a channel estimate — no primary source found).no deals
AI chips 11on the supply chain →
- NvidiaNVDAalso in Networking & opticsDesigner of the GPUs most AI runs on. Increasingly it is also a financier: it invests in its own customers (CoreWeave, Nebius, OpenAI, xAI's GPU vehicle), who then spend the money on its chips — the 'circular capital' pattern this monitor keeps flagging.33 deals · with OpenAI, Anthropic, Oracle +44
- GoogleGOOGL / GOOGalso in Clouds & compute providers · AI labsA company playing several positions at once: frontier lab (Gemini/DeepMind), major cloud, and chipmaker (its TPUs are an at-scale alternative to Nvidia). At Anthropic alone it is investor, chip supplier, landlord-guarantor, reseller, and competitor.28 deals · with Anthropic, TeraWulf, Fluidstack +29
- AMDAMDNvidia's only large GPU rival. Its OpenAI and Meta arrangements are two of the strangest structures here: each customer received a warrant to buy nearly 10% of the supplier at a penny a share, vesting as it buys chips and as AMD's stock price meets set targets — close to a fifth of the company committed to its own customers, though not one share had vested by late September 2026. For Anthropic it flipped the geometry: no warrant — instead AMD committed to invest up to $5 billion in the customer, taking a stake in Anthropic rather than handing Anthropic a stake in AMD. In September 2026 it agreed to buy a lab outright: World Labs, Fei-Fei Li's model lab, in which it had already invested, for about $8.2 billion in its own shares. Seven weeks before, it had agreed to buy Taalas, a Toronto designer of chips that run one AI model each, for about $2.9 billion in cash and stock, up to about $1.4 billion of it contingent.10 deals · with Anthropic, TensorWave, OpenAI +11
- BroadcomAVGOalso in Networking & opticsA chip giant with three roles here: it supplies the networking silicon that stitches GPUs into clusters, it co-develops custom AI chips for companies routing around Nvidia — OpenAI's accelerators, Google's TPUs (which it also supplies to Anthropic), Meta's MTIA — and it stands behind Anthropic's leases of racks built on its chips, a first batch in June 2026 and a second, larger one in October.8 deals · with Anthropic, Google, Blackstone +11
- CerebrasCBRSMaker of dinner-plate-sized 'wafer-scale' AI chips — a bold architectural bet against the GPU. IPO'd in May 2026, carrying two SEC-filed customer-financing structures on one balance sheet.5 deals · with OpenAI, G42, Digi Power X +2
- MarvellMRVLalso in Networking & opticsA US chip designer that owns no factories. Its data-center business sells the networking and optical chips that move data between AI servers, and it designs custom chips for the cloud giants — accelerators and the 'XPU attach' parts that sit around them. It gives some of those customers warrants on its own stock: Amazon (two, 2024 and 2025) and Google (2026) hold warrants that vest mostly as they buy Marvell's chips. In November 2026 it agreed to buy Lumentum, a laser maker with factories of its own, paying in Marvell shares; the deal is pending.3 deals · with Google, Amazon / AWS, Lumentum
- GroqMaker of the LPU, a specialized chip for running (not training) models fast. In December 2025 Nvidia licensed its technology and hired away its founder, its president and other staff, paying $13.0B at closing and $4B more within a year by Nvidia's own filing (the press had reported $20B).2 deals · with Saudi government, Nvidia
- MediaTek2454A Taiwanese chip designer that has outside foundries make its chips, best known for the processors inside smartphones. It also designs custom AI chips for cloud companies — its first, for an American cloud customer it does not name, is scheduled to enter production in late 2026 — and co-designed the chip in Nvidia's DGX Spark desktop AI computer. In 2026 Nvidia bought $3.5B of its bonds, which can be turned into MediaTek shares.1 deal · with Nvidia, Google
- QualcommQCOMalso in Networking & opticsThe US chip designer best known for the processors and modems in smartphones, now building a data-center business. In September 2026 it announced work with Amazon on custom AI chips and optical connectivity over several generations, and gave Amazon a warrant for up to 25 million Qualcomm shares that unlock as Amazon commits to, orders and pays for its chips.1 deal · with Amazon / AWS
- TaalasA Toronto chip designer, founded in 2023, that builds one AI model into the circuitry of each chip, which it says runs that model far faster and more cheaply than general-purpose chips can, at the price of running nothing else; its first chip, the HC1, runs Meta's Llama 3.1 8B. AMD agreed in August 2026 to buy it for about $2.9 billion in cash and stock, up to about $1.4 billion of which depends on conditions AMD has not named; the deal is pending, expected to close by the end of 2026.1 deal · with AMD
- Trainium2/3Amazon's in-house AI training chip — its route around Nvidia's prices, with Anthropic as the anchor user. Designing your own chip dodges Nvidia's margin, but the chip is still manufactured by TSMC.no deals
Advanced packaging 8on the supply chain →
- TSMCTSMalso in Chip factoriesTaiwan Semiconductor Manufacturing Company — the factory of the chip world. Nearly every advanced AI chip, whoever designs it, is physically made in its Taiwanese fabs, which makes its capacity (especially the CoWoS packaging step) one of the principal bottlenecks on AI chip production.4 deals · with Nvidia, OpenAI, Anthropic +6
- GlobalFoundriesGFSA contract chipmaker based in Malta, New York, which stepped away from the race to make the most advanced chips years ago and makes specialized chips for other companies at plants in the US, Europe and Asia. In October 2026 it agreed to make silicon interposers, a part used in TSMC's CoWoS packaging, at its Malta plant under what it calls a multi-year, $2 billion agreement, and was picked to build and run two new plants there that Japan is to pay for and that it will not own.2 deals · with TSMC, Japanese government, US–Japan Malta fabs vehicle (SPV) +1
- Ibiden4062Japanese maker of package substrates — the layered boards advanced chips are mounted on. Nvidia is its largest customer, and says it is paying IBIDEN a 'multibillion-dollar' advance, amount undisclosed, to reserve capacity at its Ono plant, the centre of about ¥280B of a ¥500B three-year expansion for AI demand.2 deals · with Ajinomoto, Nvidia
- AjinomotoYes, the Japanese MSG company. A side business gives it, by its own count, >95% of the market for ABF, an insulating film used to package high-performance chips — a tiny material with near-monopoly power over the whole industry.1 deal · with Ibiden
- AmkorAMKRAmkor Technology packages and tests chips for other companies — an 'OSAT', for outsourced semiconductor assembly and test, and by its own description the largest headquartered in the US. Nvidia, already a customer, has agreed to pay it about $1.5 billion in advance to expand its US capacity at the campus it is building in Peoria, Arizona, and about $1.3 billion more for South Korea; on the same Arizona campus TSMC has a 10-year agreement to buy its packaging and test services, and the US government has awarded it up to $407 million under the CHIPS Act, none of it received as of its October 2026 report.1 deal · with Nvidia
- Kinsus3189Kinsus Interconnect Technology, in Taiwan, makes package substrates — the layered boards advanced chips are mounted on. It says Nvidia is putting more than US$1 billion in cash into new equipment at its Youth campus in Taoyuan, where Nvidia says Kinsus plans to expand the capacity dedicated to it.1 deal · with Nvidia
- KYEC2449King Yuan Electronics (KYEC), in Taiwan, tests chips for other companies, checking them before they ship. Nvidia says it is paying KYEC $1.1 billion in advance for testing capacity KYEC is building in the US, which KYEC repays as credits on Nvidia's testing bills; its US subsidiary, AeternZ, has bought a site in Fort Worth, Texas.1 deal · with Nvidia
- SPILSiliconware Precision Industries (SPIL), in Taiwan, packages and tests chips for other companies, and is wholly owned by ASE Technology Holding. Nvidia says it is putting multibillion-dollar funding, amount undisclosed, behind SPIL's expansion of advanced packaging in Taiwan.1 deal · with Nvidia
Memory 4on the supply chain →
- Samsungalso in Chip factoriesThe Korean electronics giant — one of the three companies that make most of the world's DRAM memory (and one of the three that make virtually all HBM), and a signatory to Stargate's enormous memory letters of intent. It also makes chips that other companies design, among them Tesla's AI chips, under a contract it values at about $16.5 billion through 2033.5 deals · with SK Telecom, OpenAI, SK Hynix +5
- SK HynixSKHYKorean memory-chip maker and the leading supplier of HBM — the stacked high-bandwidth memory bonded next to AI accelerators, and chronically sold out.5 deals · with SK Telecom, OpenAI, Samsung +2
- MicronMUThe American memory maker — one of the three companies that make virtually all HBM, and the only one based in the US. Its AI-era pivot is visible in its pay plan: its board now pays executives partly on HBM bits shipped or HBM market share, whichever scores higher.4 deals · with Anthropic, Google, Nvidia +5
- Nanya Technology2408A Taiwanese maker of DRAM memory chips. In April 2026 four of its customers — Sandisk, Kioxia, Solidigm and Cisco — became shareholders through a private placement, buying new shares alongside long-term supply arrangements.1 deal · with Sandisk
Chip factories 3on the supply chain →
- Samsungalso in MemoryThe Korean electronics giant — one of the three companies that make most of the world's DRAM memory (and one of the three that make virtually all HBM), and a signatory to Stargate's enormous memory letters of intent. It also makes chips that other companies design, among them Tesla's AI chips, under a contract it values at about $16.5 billion through 2033.5 deals · with SK Telecom, OpenAI, SK Hynix +5
- TSMCTSMalso in Advanced packagingTaiwan Semiconductor Manufacturing Company — the factory of the chip world. Nearly every advanced AI chip, whoever designs it, is physically made in its Taiwanese fabs, which makes its capacity (especially the CoWoS packaging step) one of the principal bottlenecks on AI chip production.4 deals · with Nvidia, OpenAI, Anthropic +6
- IntelINTCThe US chipmaker that created the x86 processor family most PCs and servers run on, and one of the few companies that both designs chips and makes them in its own factories, a business it runs as Intel Foundry. In the second half of 2025, with the foundry losing billions of dollars a year, it sold new shares to SoftBank, the US government and Nvidia. The government's stake came with a warrant it can use only if Intel's own stake in the foundry falls below 51%.3 deals · with US government, Nvidia, SoftBank
Chipmaking machines 1on the supply chain →
Raw materials 2on the supply chain →
- GlobalWafersThe Taiwanese company that is, by its own count, the world's #3 maker of raw silicon wafers — the blank discs almost every chip starts as, one layer upstream of the memory and logic fabs. Its new Sherman, Texas plant makes it, by its own description, the only raw-wafer supplier in the CHIPS program able to make advanced 300mm wafers on US soil — which is why Micron plans to provide $500M to expand it.1 deal · with Micron
- MP MaterialsMPThe company that runs Mountain Pass in California, the only large rare-earth mine and processing site in North America, and makes rare-earth magnets in Texas. Magnets like these move hard-drive arms and spin cooling motors, and their production is concentrated in China — which is why, in July 2025, the Pentagon signed on as MP's shareholder, lender, price-floor payer and future customer all at once.1 deal · with US government
Investors 23
- Lenders & bondholdersCatch-all for the banks, funds and bond buyers whose loans and bonds pay for data-center projects and the GPUs inside them, where the lenders have no entity of their own.23 deals · with CoreWeave, Oracle, Blackstone +32
- BlackstoneBXThe world's largest alternative-asset manager. In this world it is a lender and an owner: it leads or anchors the multi-billion-dollar loans that let CoreWeave buy GPUs; its real-estate funds own, with Related Digital, the $16 billion Michigan campus that Oracle leases; and its funds took most of a Digital Realty development venture, selling their stakes in three of its Northern Virginia buildings back to Digital Realty in 2026. It is also the sole provider of the committed part of the second lien in a $63 billion financing of Broadcom chips for Anthropic.8 deals · with CoreWeave, Lenders & bondholders, Broadcom +8
- SoftBankJapanese investment conglomerate known for enormous, aggressive tech bets. Here it is a check-writer and a customer: it funds OpenAI and buys its products for its own companies. It is also one of the four founders of Stargate, a data-center venture whose ownership no party has disclosed; under the Stargate name its energy arm also builds a site.7 deals · with OpenAI, Oracle, MGX +8
- US governmentThe United States federal government, which appears here as a shareholder, a lender and a buyer, and as the gatekeeper of AI-chip exports. In August 2025 its Commerce Department took newly issued Intel stock in return for paying out CHIPS Act grant money it had already awarded the company, plus a warrant for more shares that it can use only if Intel's stake in its own chip-factory business falls below 51%; it holds the stake passively, with no board seat and its votes cast with Intel's board, and it is also Intel's grant-maker and one of its foundry customers. From February 2026 Commerce has licensed Nvidia to sell small amounts of its H200 chip to China-based customers, and the cut the President announced is collected as a 25% tariff on each licensed chip when it enters the US for a required inspection. Its licences also decide where AI chips may run abroad and who may use them: Firebird, a US start-up, says it holds one for 45,000 Nvidia GPUs for a data center in Kazakhstan. In July 2025 its Defense Department also bought preferred stock in MP Materials, the main US rare-earth miner, took a warrant for more shares, and agreed to lend it money, top up the price of its main rare-earth product to a floor and be the buyer of last resort for the magnets of a new plant. In October 2026 its Commerce Department agreed to move up to $955 million of GlobalFoundries' existing CHIPS Act grant to silicon photonics, silicon-germanium and advanced packaging, technologies it calls 'increasingly critical to communications infrastructure and data centers', and is to receive about 4% of that company, beside two GlobalFoundries-run chip plants that Japan is to pay for and the two governments are to own.5 deals · with Nvidia, Intel, Firebird +5
- MGXAn Abu Dhabi state-backed investment firm created to invest in AI. One of the four founding backers of Stargate, and an investor in xAI.4 deals · with OpenAI, SoftBank, Oracle +11
- ApolloAPOA New York alternative-asset manager and private-credit lender, owner of the retirement insurer Athene. In this world it finances computers by owning them: an Apollo fund is obliged to buy the Broadcom-built computing equipment for Anthropic's expansion — the $35 billion first tranche of Broadcom's 'AI XPV' platform, part of it guaranteed by Athene — and an entity Apollo manages is to buy about $40 billion of GPU pods, on SpaceX's estimate, and lease them to SpaceX under a commitment signed in October 2026. Athene also lends into it: its October 2026 deck counts $12.9 billion of digital-infrastructure investments, about 3% of its invested assets, $3.6 billion of it financing chips leased to xAI and Anthropic.2 deals · with SpaceX, BlackRock, Lenders & bondholders +4
- BlackRockBLKThe world's largest asset manager, the owner of the infrastructure investor GIP since 2024 and of the private-credit firm HPS since 2025. In this world it is a landlord-financier: since July 2026, funds it manages own 80% of Meta's El Paso data-center venture (per the two companies' July release) — the second time Meta has handed a gigawatt-scale campus to an outside owner and rented it back; Meta's filings record the closing without naming BlackRock.2 deals · with Lenders & bondholders, SpaceX, Apollo +1
- Blue OwlOWLA private-credit and alternative-asset manager — the buildout's landlord-financier. Its funds own 80% of Meta's Hyperion venture and backed the JV that is building Stargate Abilene.2 deals · with Crusoe, Oracle, Lenders & bondholders +1
- BrookfieldBAM / BNThe Canadian asset manager behind one of the world's largest infrastructure-investing businesses. Here it is the financier NAVER chose for its AI factory: up to $9B, under a term sheet Nvidia calls nonbinding, for a separate company Brookfield would control that owns the GPUs and buildings. Nvidia, in turn, is the anchor investor in Brookfield's own AI-infrastructure fund. It also pays for Bloom Energy's fuel-cell plants, through ventures it mostly owns that buy them and sell their power, under a framework now sized at up to $25B.2 deals · with Nvidia, NAVER, Bloom Energy
- MagnetarA hedge fund that was, by its own count, CoreWeave's first institutional investor, and a lead lender on the GPU-backed loans CoreWeave says it pioneered — the financial trick CoreWeave's model rests on.2 deals · with CoreWeave, Blackstone
- AIP (fund)The AI Infrastructure Partnership — an investment fund created in 2024 by BlackRock, its infrastructure arm GIP, Microsoft and MGX (Nvidia joined later) to buy and build AI infrastructure with pooled institutional money. Its first purchase was Aligned Data Centers, by its own count one of America's biggest data-center landlords.1 deal · with MGX, BlackRock GIP, Aligned DC +1
- AramcoSaudi Arabia's state oil and gas company; the government owns 81.48% of it directly. Here it is an investor: in November 2026 it took 49% of HUMAIN, the kingdom's AI company, for about $2.6B of cash plus AI assets of its own, and it expects to use HUMAIN's computing for its own operations.1 deal · with HUMAIN, PIF
- BlackRock GIPGlobal Infrastructure Partners, the infrastructure-investing arm BlackRock bought in 2024. Its funds buy ports, pipelines and power plants — and data-center platforms: it is one of the three named buyers of Aligned.1 deal · with AIP (fund), MGX, Aligned DC +1
- e& (Etisalat)A UAE telecom group, formerly Etisalat. It created today's Khazna by merging its data centers into G42's in 2022, then sold its 40% back for $2.2 billion in 2025 — and its audited filings are the only hard financials today's Khazna has ever had.1 deal · with Khazna, G42, MGX +1
- InfraSaudi Arabia's National Infrastructure Fund, a state development-finance fund that operates under the kingdom's National Development Fund and finances infrastructure projects so that private investors will put money in too. In November 2026 it signed two financing facilities of up to SAR 2.5 billion (about $667 million) with HUMAIN, the state AI company: one to buy GPUs, one for the substations and grid connections HUMAIN's data centers need.1 deal · with HUMAIN
- Japanese governmentJapan's government, here the planned funder of chip plants in the United States. Under the 2025 US–Japan trade and investment agreement it and the US 'concurred on the implementation' of a chip-making project in New York in October 2026, one GlobalFoundries says it will build and run at its Malta site; Japan puts its cost at about $10 billion for a first plant, and about $21 billion if a second is added. Its finance ministry still listed the project as announced but without a loan commitment at the end of September 2026.1 deal · with US–Japan Malta fabs vehicle (SPV), GlobalFoundries, US government
- Korean governmentSouth Korea's government, here a broker and buyer of AI chips. Its science ministry (MSIT) announced with Nvidia in October 2025 a plan for roughly 260,000 Nvidia GPUs split between the government and four companies, runs a working group with them on the rollout, and pays Korean cloud companies to buy, install and run Nvidia GPUs for public use, letting them keep part in place of a fee: 13,136 bought with a 2025 supplementary budget, 9,704 more awarded in June 2026.1 deal · with Nvidia, Samsung, SK Telecom +2
- Macquarie Asset ManagementThe fund manager whose infrastructure funds had grown Aligned Data Centers since 2018 and, with other shareholders such as CenterSquare, sold it to AIP, MGX and BlackRock's GIP at a value of about $40 billion in July 2026.1 deal · with AIP (fund), MGX, BlackRock GIP +1
- NeubergerNeuberger Berman, an employee-owned, private, independent investment manager founded in 1939, which now goes by Neuberger. Its asset-based lending arm, Neuberger Specialty Finance, gave Crusoe a $700 million facility in October 2026 to buy gas generators for AI data centers Crusoe builds and owns, secured by power-generation equipment Crusoe had recently ordered: a loan against the power equipment, not the buildings or the chips.1 deal · with Crusoe
- PIFSaudi Arabia's sovereign wealth fund. It launched HUMAIN, the kingdom's AI company, in May 2025 and owned all of it until November 2026, when Aramco — the state oil company in which the government has transferred 16% to PIF and its companies — took 49%; PIF keeps 51%.1 deal · with Aramco, HUMAIN
- Saudi governmentSaudi Arabia's government. Here it is the kingdom that, by Groq's account, committed $1.5 billion in February 2025 for Groq to deliver more of its infrastructure for running AI models; Groq's release names no ministry or fund behind the commitment.1 deal · with Groq
- Silver LakeThe big US technology private-equity firm. In 2025 it took a minority stake in Khazna alongside Abu Dhabi's MGX — Western buyout capital entering the Gulf's AI-landlord layer, on terms the parties have not disclosed.1 deal · with e& (Etisalat), Khazna, G42 +1
- Other investorsCatch-all for everyone else who puts money into the labs — venture firms, sovereign funds, and strategic investors without their own entry here.no deals
Joint ventures & financing vehicles 6
- Northstar Compute (SPV)The newly formed special purpose vehicle behind Broadcom's second chip financing for Anthropic: it raises $63 billion arranged by Bank of America, Blackstone, Citi and Morgan Stanley, buys Broadcom's AI accelerators and networking gear and leases them to Anthropic, with Broadcom standing behind the lease. The name is its counsel's (Milbank); the parties' own release and Broadcom's filing call it only a newly formed special purpose vehicle, and the press calls the deal Project North Star.1 deal · with Broadcom, Anthropic, Blackstone +1
- OD1 JV HoldingsThe Delaware company that holds the first phase of STN's Odessa, Texas campus and the contract, signed by STN, to supply an unnamed frontier AI lab with GPU computing there. ChronoScale manages it and is to own half when US antitrust clearance turns its $220 million loan into units; STN contributed the contract, the site lease and related assets for the other half, with cash to follow a project financing.1 deal · with STN, ChronoScale, Supermicro +2
- SB OAI JapanA Tokyo joint venture of OpenAI and SoftBank, launched on November 5, 2025, to sell Crystal intelligence, a package of OpenAI's business products with set-up and integration work, to companies in Japan. OpenAI owns half; the other half belongs to a company owned 51% by SoftBank Corp. and 49% by SoftBank Group, and SoftBank Corp. counts the venture as its subsidiary.1 deal · with SoftBank, OpenAI
- Stargate LLCIn practice an umbrella label: OpenAI, SoftBank, Oracle and Abu Dhabi's MGX announced Stargate in January 2025 as a joint company that intended to invest $500B in US data centers for OpenAI, but none of them has said who owns how much of it or what has been paid in. The sites are built through separate two-party deals that carry its name — Oracle's for OpenAI, and SoftBank's through its energy company.1 deal · with OpenAI, SoftBank, Oracle +1
- US–Japan Malta fabs vehicle (SPV)The vehicle, named in no document, that is to own GlobalFoundries' two planned chip plants at Malta, New York, as GlobalFoundries describes it: owned by the US and Japanese governments in shares no document states, it is to pay for and own the plants' buildings and tools — with money Japan provides — while GlobalFoundries builds and runs them for fees.1 deal · with Japanese government, GlobalFoundries, US government
- Valor Compute Infra (SPV)A fund run by Valor Equity Partners, the investment firm of SpaceX director Antonio Gracias, that bought $5.4B of computing gear, Nvidia GB200 chips included, from a subsidiary of Elon Musk's AI lab xAI, now part of SpaceX, and leases it back, though SpaceX books the leases as its own debt, so the chips never left its balance sheet. Nvidia is one of its investors, and SpaceX or one of its subsidiaries guarantees the lease payments.1 deal · with Nvidia, SpaceX
Not yet placed in the chain 4
- GalaxyGLXYA New York financial firm built on crypto — trading, asset management and some bitcoin mining — that is turning Helios, a bitcoin-mining campus it owns in West Texas, into data centers for CoreWeave. It handed over the first 133 MW of computing capacity there in 2026 and has leased it 393 MW more, due from 2027; another 830 MW of the campus's approved power has no tenant yet.1 deal · with CoreWeave, Lenders & bondholders
- HYAICOHYAICO is SK hynix's US company for AI investments, the former SK hynix NAND Product Solutions Corp., renamed in October 2026; in 2026 its NAND flash and SSD business moved to its subsidiary Solidigm Inc. SK hynix owned 97.24% of it at September 30, 2026, and SK Telecom, SK Inc. and SK Innovation America have committed to buy new shares in it as it calls for capital.1 deal · with SK Telecom
- Related DigitalThe data-center arm of Related Companies, the New York property developer. It builds campuses that cloud companies lease: in this monitor, The Barn, a $16 billion campus in Saline Township, Michigan, leased whole to Oracle, which it owns in a joint venture with Blackstone's real-estate funds and financed with the partners' equity and $14 billion of bonds that PIMCO anchored.1 deal · with Blackstone, Oracle, Lenders & bondholders
- STNA Pleasanton, California company that began as a managed service provider for regulated industries and now develops AI data-center campuses built from factory-made modules it calls Elemental Data Centers; it also runs a GPU cloud, GPU One. In November 2026 it put the first phase of its Odessa, Texas campus, and its contract to supply an unnamed frontier AI lab with GPU computing there, into a venture with ChronoScale.1 deal · with ChronoScale, OD1 JV Holdings, Supermicro +2