BXDC–AWS sale-leaseback

Amazon agreed to sell 75.1% of 13 data centers worth $5.0B to Blackstone Digital Infrastructure Trust if paid at least $4.33B in cash at closing. Amazon will rent all 13 back.

A deal between Amazon / AWS, Blackstone Digital Infrastructure Trust, Lenders & bondholders

Why it matters

Amazon agreed to sell a share of the data centers it had just finished building. It is to receive at least $4.33B for 75.1% of 13 data centers and rent them all back on leases averaging 12 years. Amazon has made closing conditional on SEC staff confirming it needn't consolidate the ventures.

Tap a figure for the line in its source.

Amazon / AWS gives Blackstone Digital Infrastructure Trust

  • of two ventures that will own its 13 newly built data centers — nine in northern Indiana, four in Mississippi, 647 of IT power in all — as land and powered shells; Amazon's affiliates keep 24.9%
  • of the $5.0B value as the first year's base rent — about $350M by our arithmetic, no document giving the dollars — rising 2.75% a year, on triple-net leases of 12 years on weighted average, 32 with two 10-year renewals
  • Amazon.com, Inc.'s guarantee of its subsidiary's rent; Amazon also runs and maintains the buildings, and the servers, racks and cooling inside are its own investment

Blackstone Digital Infrastructure Trust gives Amazon / AWS

  • in cash at closing — the least Amazon's side is bound to close for: BXDC's $1.9B of IPO cash and the loans' net proceeds, paid out by the ventures; a floor that moves with the loans' final size, less Amazon's share of some costs
  • a say over the ventures: BXDC's subsidiaries manage them, subject to Amazon's affiliates' approval of certain major decisions
  • if BXDC's side fails to close when required — and Amazon's side owes BXDC the same — as the other side's only remedy

Lenders & bondholders gives Blackstone Digital Infrastructure Trust

  • of new non-recourse mortgage loans to the ventures' subsidiaries, secured by the buildings — committed, subject to conditions, but not a condition of BXDC's closing: if they are not funded, BXDC must close anyway and pay its part from equity; no document names the lenders

Nov 16, 2026 announced by BXDC (8-K, release and Q3 call)updated Nov 21, 2026signed Nov 11 2026, announced Nov 16 disclosed by the parties

What happened

In November 2026, Amazon agreed to sell a 75.1% stake in 13 data centers it has just built to Blackstone Digital Infrastructure Trust. Nine are in northern Indiana near Chicago, and four are in Mississippi. It is the first purchase for the property trust, which listed in May and is run by a Blackstone affiliate. The trust is putting in $1.9 billion, effectively all the cash it raised in its share sale. The two ventures that will own the buildings are set to borrow about $2.5 billion against them. If the loans fall through, the trust must still close and pay its share from its own equity. Together the funding is to pay Amazon at least $4.33 billion at closing, the least it must accept to go through with the deal. Amazon keeps the other 24.9%. It will then rent all 13 back for 12 years on average, or up to 32 with renewals, and pays to run and maintain them. The trust gets the land and the powered shells. The servers, racks and cooling inside are Amazon's own investment. No document gives the rent in dollars. The trust's 7.0% yield on the $5.0 billion value implies first-year rent near $350 million, rising 2.75% a year. The deal is due to close by the end of 2026.

Sources 10 documents — 8 SEC filings · 2 transcripts

Research trail Found 126 documents and read 114 of them while checking this deal and related ones.

  1. SEC · SEC filingsec.gov
    States 8 figures: 75.1% stakes · $1.9B bxdc cash · $5B gross value · leases · 647 MW properties · $2.5B loans · governance · $150M termination
  2. SEC · SEC filingsec.gov
    States 6 figures: $4,328,452,478 min distribution · no financing contingency · SEC pre clearance · contribution value · land · sale rofr
  3. Stock Analysis · transcriptstockanalysis.com
    States 5 figures: more than 50% shell only · owner scope · $3.7B bxdc share · 49% leverage · mortgage rate
  4. SEC · SEC filingsec.gov
    States 3 figures: 75.1% value basis · renewals · $385M per building
  5. SEC · SEC filingsec.gov
    States counties
  6. SEC · SEC filingsec.gov
    States release
  7. SEC · SEC filingsec.gov
    States $15,000,000 buy box
  8. Motley Fool · transcriptNov 16, 2026fool.com
    States 7% cap rate vs plan
  9. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.
  10. SEC filingsec.gov
    Cited by the record; no single figure is quoted from it.

The record's own summary of its sourcing: BXDC 8-K (Nov 16 2026, Item 1.01, filed) and its EX-2.1 contribution agreement; Q3 2026 10-Q (Nov 16, Note 10 and risk factors); the release (EX-99.1, furnished) and transaction summary (EX-99.2 to the Items 2.02/7.01 8-K, furnished); the 424B4 (May 15 2026) and the S-11's form lease (EX-10.4); third-party transcripts of BXDC's Q3 call (Nov 16 2026: StockAnalysis, the Motley Fool) · as of Nov 2026

The evidence 26 sourced figures · 5 disputes

The record's headline BXDC–AWS sale-leaseback: Blackstone Digital Infrastructure Trust agrees to buy 75.1% of two ventures owning 13 newly built Amazon data centers (647 of IT power) in northern Indiana and Mississippi, at a $5.0B gross value and a 7.0% cap rate — $1.9B of IPO cash and ~$2.5B of mortgage loans are to pay Amazon at least $4.33B at closing, the least it is bound to close for; Amazon keeps 24.9% and leases all 13 back for a 12-year weighted-average term (32 extended)

Size
$5.0B gross value at 100%, transaction costs included · BXDC 75.1% for $1.9B of IPO cash, ~$2.5B of non-recourse mortgage loans at the ventures · ≥$4.33B in cash to Amazon at closing, Amazon keeping 24.9% (~$0.6B) · 13 buildings, 647 MW of IT power · 7.0% initial cap rate, 12-year weighted-average leases (32 extended), +2.75% a year
When
Nov 11 2026 contribution agreement signed → Nov 16 2026 announced (8-K, release, transaction summary, Q3 10-Q and call) → closing expected Q4 2026; outside date Dec 31 2026 (extendable)
Status
signed Nov 11 2026, announced Nov 16; not closed — expected in Q4 2026 (release), and either side may terminate if it has not closed by Dec 31 2026, a date the agreement lets be extended; the loans committed, subject to conditions, and not a condition of BXDC's closing; Amazon's side conditioned on SEC staff confirming it need not consolidate the ventures
Structure
sale-leaseback through two joint ventures, one per campus — Jade IN Venture LLC (Indiana, nine buildings) and Jade MS Venture LLC (Mississippi, four). Amazon Data Services, which owns the land, contributes the campuses through its affiliates Jade SMIN LLC and Jade SMMS LLC for 24.9% and a one-time cash distribution of at least $4,328,452,478; BXDC's subsidiaries Jade IN Member LLC and Jade MS Member LLC put in $1.9B of IPO cash for 75.1% and manage both ventures, subject to the Amazon side's approval of certain major decisions; the ventures' wholly owned subsidiaries borrow ~$2.5B of non-recourse mortgage loans secured by the buildings. Amazon Data Services leases 100% back on triple-net leases guaranteed by Amazon.com, Inc.
Programme
BXDC–AWS
Parties
Amazon / AWS seller of 75.1% (Amazon Data Services' affiliates Jade SMIN LLC and Jade SMMS LLC), 24.9% owner, sole tenant (Amazon Data Services, 'a significant subsidiary of Amazon.com, Inc.') and, through Amazon.com, Inc., guarantor of the rent; keeps the servers, racks and cooling and runs the buildings · Blackstone Digital Infrastructure Trust buyer of 75.1% and managing member of both ventures (Jade IN Member LLC, Jade MS Member LLC); landlord through the ventures' property owners · Lenders & bondholders ~$2.5B of non-recourse mortgage loans to the ventures' subsidiaries, committed — unnamed
Record
disclosed / primary source · as of Nov 2026

Flows 4 as the record states them

  • Blackstone Digital Infrastructure Trust → Amazon / AWSjvat least $4,328,452,478 in cash at closing (contribution agreement §6.1(f)) — the least Amazon's side is bound to close for, a condition it may waive — paid by the ventures from BXDC's $1.9B of IPO cash and the loans' net proceeds (8-K), for 75.1% of the two ventures; adjustable with the loans' final size and net of Amazon's 24.9% of certain costs — about $4.33–4.4B (contested cash-at-closing). Not yet paid: the deal has not closed
  • Lenders & bondholders → Blackstone Digital Infrastructure Trustdebt~$2.5B of new non-recourse mortgage loans to the ventures' wholly owned subsidiaries, secured by the 13 buildings — committed under a debt commitment letter for each loan, subject to conditions; not a condition of BXDC's closing, which must go ahead on equity if a loan is not funded (no-financing-contingency); lenders, rate and term undisclosed
  • Amazon / AWS → Blackstone Digital Infrastructure Trustcontributed-campusesthe two campuses — 13 newly built powered shells with 647 MW of IT power, nine in St. Joseph County, Indiana, and four in Madison County, Mississippi — contributed into the ventures for 24.9% and the cash distribution; the land and the shells only, the servers, racks and cooling equipment staying Amazon's (shell-only)
  • Amazon / AWS → Blackstone Digital Infrastructure Trustlease-paymentsrent on 100% of the buildings under triple-net leases guaranteed by Amazon.com, Inc.: a 12-year weighted-average initial term (32 fully extended), rising 2.75% a year; the first year's base rent is 7.0% × $5.0B ≈ $350M by BXDC's own cap-rate definition (our arithmetic — no document states it; contested first-year-rent)

Resolved figures 26 each with the verbatim line from its document

  • stakes75.1%
    75.1% of each of two ventures, one per campus, to BXDC's subsidiaries (Jade IN Member LLC, Jade MS Member LLC); 24.9% kept by Amazon's (Jade SMIN LLC, Jade SMMS LLC, affiliates of Amazon Data Services, Inc.), which the 8-K values at ~$0.6B. The release, the transaction summary's headline and the call round the split to 75/25; the 8-K, the agreement and the 10-Q say 75.1/24.9
    “At the Closing, the Company Parties expect to contribute $1.9 billion of cash proceeds the Company received in its initial public offering to the Joint Venture in exchange for a 75.1% controlling interest in the Joint Venture, and the Tenant Parties expect to retain the remaining 24.9% interest in the Joint Venture ($0.6 billion).”
    BXDC 8-K (Nov 16 2026), Item 1.01 (filed) · sec.gov
  • bxdc-cash$1.9B
    $1.9B of the cash BXDC's May 2026 IPO raised, contributed for the 75.1% — on the call, 'effectively deploying the entirety of our IPO proceeds' (bxdc-share). BXDC's own money in the deal; the rest of the payout to Amazon is the loans' (loans, min-distribution)
    “At the Closing, the Company Parties expect to contribute $1.9 billion of cash proceeds the Company received in its initial public offering to the Joint Venture in exchange for a 75.1% controlling interest in the Joint Venture, and the Tenant Parties expect to retain the remaining 24.9% interest in the Joint Venture ($0.6 billion).”
    BXDC 8-K (Nov 16 2026), Item 1.01 (filed) · sec.gov
  • gross-value$5B
    $5.0B aggregate gross value of the two campuses, at an initial capitalization rate of 7.0% — the whole portfolio at 100%, not BXDC's share, and including transaction costs (value-basis). The release's 'approximately $5 billion' is the same figure
    “that will own two data center campuses (each, a “Campus,” and collectively, the “Properties”), with an aggregate gross value of $5.0 billion, reflecting an initial capitalization rate of 7.0%.”
    BXDC 8-K (Nov 16 2026), Item 1.01 (filed) · sec.gov
  • value-basis75.1%
    what the $5.0B and the 7.0% are: the portfolio at 100% (BXDC acquiring 75.1%), transaction costs included; and the cap rate is the first year's base rent divided by that same value. So the first year's base rent is about 7.0% × $5.0B ≈ $350M at 100% (our arithmetic; first-year-rent), and BXDC's 75.1% of the value about $3.76B (our arithmetic) — the call's '$3.7 billion share' (bxdc-share)
    “a. Shown at 100% share (BXDC will be acquiring 75.1% ownership), including transaction costs b. Initial cap rate reflects the base rent for the initial year of the lease term divided by the aggregate gross value, which includes transaction costs”
    BXDC transaction summary (EX-99.2 to the Items 2.02/7.01 8-K, Nov 16 2026; furnished), endnotes · sec.gov
  • leases12 years
    each campus 100% leased back to Amazon Data Services on long-term triple-net leases, its payments guaranteed by Amazon.com, Inc.: a weighted-average initial term of 12 years, 32 fully extended, rent rising 2.75% a year. The rent in dollars is in no document (first-year-rent). The 8-K says the leases' terms are 'materially consistent' with the prospectus's buy box and the form lease (lease-term-criteria); the leases themselves are unfiled
    “each Campus will be 100% leased to the Tenant pursuant to long-term, triple-net leases (the “Leases”), the Tenant’s payment obligations under which will be guaranteed by the Tenant Parent. The Leases will have a weighted average initial lease term of 12 years (weighted average fully extended term of 32 years) and an annual rent escalator of 2.75%.”
    BXDC 8-K (Nov 16 2026), Item 1.01 (filed) · sec.gov
  • renewals10 years
    the 32 years are the 12-year initial term plus two renewal options of 10 years each; the summary does not say whose options they are (the form lease gives the tenant 'certain options to extend', 424B4), and the 8-K gives both terms as weighted averages across the leases
    “c. Reflects initial lease term of 12 years and two renewal options of 10 years each”
    BXDC transaction summary (EX-99.2, Nov 16 2026; furnished), endnote c · sec.gov
  • properties647 MW
    13 newly built data centers with 647 MW of IT power in all: a campus of nine buildings in northern Indiana ('the greater Chicago data center market') and one of four in Mississippi. The release calls them 'powered shells' — buildings with their power, the equipment inside being Amazon's (shell-only). By value, more than two-thirds Indiana (per-building). The call's transcripts print a different capacity (contested call-capacity); the filed 647 MW stands
    “The Properties consist of 13 newly constructed data centers with 647 megawatts of aggregate information technology power capacity, with one Campus consisting of nine buildings located in northern Indiana (the greater Chicago data center market) and one Campus consisting of four buildings located in Mississippi.”
    BXDC 8-K (Nov 16 2026), Item 1.01 (filed) · sec.gov
  • counties13
    the campuses' counties — St. Joseph County, Indiana, and Madison County, Mississippi — named only in the 10-Q's risk factors; no document names a town or a campus (contested campus-identity). The same passage says that with the deal BXDC will depend on 'one tenant with two leased properties for substantially all of our revenue'
    “If the Transactions are completed, our portfolio will consist of the Properties, which consist of two Campuses – one located in St. Joseph County, Indiana and one located in Madison County, Mississippi – that will be leased to the Tenant under the Leases. The Properties consist of 13 newly constructed data centers with 647 megawatts of aggregate IT power capacity.”
    BXDC Q3 2026 10-Q (Nov 16 2026), Part II risk factors (filed) · sec.gov
  • per-building$385M
    $385M a building on average ($5.0B ÷ 13, transaction costs included), inside the buy box's $250M–$1.5B+; by value more than two-thirds in northern Indiana, less than a third in Mississippi. Per MW of IT power it is about $7.7M ($5.0B ÷ 647 MW, our arithmetic) — about half the $15M per MW the prospectus assumed as the average acquisition cost of the buildings it meant to buy (buy-box). The CEO's 'more than 50% below estimated turnkey replacement costs' (shell-only) is a separate measure — against replacement cost, not that assumed price — and the record does not join the two
    “Size $250M - $1.5B+ (Per Building) $5.0B(a) (13 Buildings / $385M) Markets Primarily Tier 1 > 2/3 Northern IN (Greater Chicago) / < 1/3 Mississippi”
    BXDC transaction summary (EX-99.2, Nov 16 2026; furnished), comparison to buy-box · sec.gov
  • loans$2.5B
    ~$2.5B of new non-recourse mortgage loans, borrowed by the ventures' wholly owned subsidiaries and secured by the buildings, fund the rest of the deal, transaction costs included; the lenders have committed under a debt commitment letter for each loan, subject to conditions — though the loans are not a condition of BXDC's side closing: if one is not funded, BXDC must close anyway and fund its contributions in full from equity (no-financing-contingency). Against the $5.0B, ~50% debt (our arithmetic; an analyst on the call put the LTV at 'about 50%'). No document names the lenders or the term; the rate, by the CFO's pencil, 'SOFR plus mid to upper 100s' (mortgage-rate). The release's advisers (Morgan Stanley, CBRE Capital Markets, Citi, Goldman Sachs, J.P. Morgan, Wells Fargo) are 'financial advisors', not lenders
    “The remainder of the funds required to complete the Transactions (including transaction costs) is expected to be funded with the net proceeds from approximately $2.5 billion of new non-recourse mortgage loans (the “Loans”) secured by the Properties incurred by wholly owned subsidiaries of the Joint Ventures. The Company Parties have obtained a debt commitment letter for each Loan pursuant to which the applicable lenders party thereto have committed, subject to the terms and conditions set forth therein, to provide the Loans.”
    BXDC 8-K (Nov 16 2026), Item 1.01 (filed) · sec.gov
  • min-distribution$4,328,452,478
    the cash Amazon's affiliates must receive at closing, a condition of their side's obligation to close (one they may waive): at least $4,328,452,478 — the BX Contributions plus Amazon's 24.9% of the loans' proceeds, adjustable with the loans' final size, less Amazon's 24.9% of certain costs. The 8-K: the payout is funded by BXDC's cash and the loans' net proceeds. The BX Contributions are BXDC's 75.1% of a contribution value the agreement redacts (contribution-value); with ~$2.5B of loans, the floor puts them near $3.7B — the 'share' BXDC's CFO gave on the call (bxdc-share) — and the redacted value near $4.9B, against the $5.0B that adds transaction costs (our arithmetic). So at the floor Amazon would take about 87% of the value in cash ($4.33B ÷ $5.0B, our arithmetic) and keep 24.9% of the equity. A floor in a signed agreement, not a payment: the deal has not closed (contested cash-at-closing), and the loans the floor counts on are not a condition of BXDC's side closing (no-financing-contingency)
    “The aggregate amount distributed to AWS Member at Closing totals at least (x) $4,328,452,478, which amount represents the sum of the BX Contributions plus AWS Member’s Percentage Interest of proceeds from the Loans, but is subject to adjustment based on final loan sizing adjustments pursuant to the section of the Debt Commitment Letter entitled “Loan Amount” and/or “[***]” that are, in each case, permitted pursuant to Section 2.1, less (y) AWS Member’s Percentage Interest of the costs set forth in Section 1.6(b).”
    BXDC 8-K (Nov 16 2026), EX-2.1 Contribution Agreement §6.1(f) (filed) · sec.gov
  • no-financing-contingency
    the loans are not a condition of BXDC's side closing: if one is not funded, BXDC's subsidiaries must close anyway and fund the BX Contributions in full from equity (§6.3, repeating §1.2(d)), and they represent that the loans and their equity will be enough to make Amazon's payout reach the §6.1(f) floor (§4.1(h)). Amazon's side, by contrast, need not close unless its payout reaches that floor — which counts its 24.9% of the loans' proceeds (min-distribution) — a condition it 'may waive in whole or in part in its sole and absolute discretion' (§6.1). The 8-K says only that the Transactions '(including the Loans) are subject to certain other conditions'
    “For the avoidance of doubt, there is no financing contingency to the Closing in favor of BX Member, obtaining any Loan will not be a condition precedent to BX Member’s obligation to proceed to Closing, and if one or more Loans is not funded at Closing then BX Member will nonetheless proceed to Closing and fund the BX Contributions in full from equity sources.”
    BXDC 8-K (Nov 16 2026), EX-2.1 Contribution Agreement §6.3 (filed) · sec.gov
  • sec-pre-clearance
    an accounting condition of Amazon's side closing (§6.1(e)): confirmation from the SEC's staff that the deal will not require Amazon Data Services or any affiliate to consolidate the ventures in its financial statements. Amazon's affiliates must use commercially reasonable efforts to get it; if the staff declines, both sides negotiate in good faith over changes to the JV agreement and resubmit, and if it has not come by the outside date they discuss an extension (§5.4). It concerns consolidating the ventures — no document in the record says how Amazon will account for the sale-leaseback itself
    ““SEC Pre-Clearance” means confirmation from the staff of the SEC, in form and substance reasonably satisfactory to AWS Member, that this Agreement and the transactions contemplated by this Agreement will not require consolidation of the Joint Ventures (or any subsidiary of it) by Amazon Data Services, Inc. or any affiliate of it for financial reporting purposes under applicable U.S. GAAP and SEC reporting requirements.”
    BXDC 8-K (Nov 16 2026), EX-2.1 Contribution Agreement, Annex A definitions ('SEC Pre-Clearance'), §5.4 and §6.1(e) (filed) · sec.gov
  • contribution-value
    how the agreement prices the campuses: a 'Contribution Value' for each, both redacted; BXDC's subsidiaries put in their 75.1% ('Percentage Interest') of it, and each venture pays that on to Amazon's affiliate, less Amazon's 24.9% of certain costs, as 'a one-time special distribution' (§1.2(c)) — the closing condition then adds Amazon's 24.9% of the loans' proceeds (min-distribution). No document states the contribution value
    “BX Member agrees to make the BX Contributions as set forth in Section 1.2(c)(ii) based on a contribution value equal to (a) for the SBN Property, $[***] (the “SBN Contribution Value”), and (b) for the JAN Property, $[***] (the “JAN Contribution Value”; together with the SBN Contribution Value, collectively, the “Contribution Value”).”
    BXDC 8-K (Nov 16 2026), EX-2.1 Contribution Agreement §1.1 (filed) · sec.gov
  • land
    whose land it is: Amazon Data Services, Inc. — the tenant — owns both campuses' land in fee simple. At closing Jade SMIN LLC and Jade SMMS LLC cause it to contribute each campus to them, and they contribute it on to the ventures, which pass it down to their property-owning subsidiaries, Amazon Data Services signing and recording the deeds (§1.2(c)(i)); the 8-K says the same in short: 'the Tenant will contribute the Properties to the Joint Venture'
    “Amazon Data Services, Inc. (“AWS”), an Affiliate of AWS Member, owns a fee simple interest in the real property described on Exhibit “A-1” (the “SBN Land”) and in the real property described on Exhibit “A-2” (the “JAN Land”; together with the SBN Land, the “Land”).”
    BXDC 8-K (Nov 16 2026), EX-2.1 Contribution Agreement, Recital A (filed) · sec.gov
  • governance
    BXDC's subsidiary is each venture's managing member and runs its business, subject to the Amazon side's approval of certain major and fundamental decisions, under a JV agreement 'substantially in the form' attached to the contribution agreement
    “The respective Company Member will be the managing member and manage the respective Joint Venture’s business and affairs, subject to the approval rights of the respective Tenant Party over certain major decisions and fundamental decisions.”
    BXDC 8-K (Nov 16 2026), Item 1.01 (filed) · sec.gov
  • sale-rofr
    who can end up with the buildings: under the JV agreement form, a member that wants the venture to accept a third party's offer for its facilities must first offer them — or, for all of them, its own interest — to the other member on the offer's terms (§9.3(b)), so each side holds a right of first refusal on the other's sale
    “If Selling Member receives an offer from a bona fide third party to acquire one or more of the Facilities that Selling Member desires to cause the Group to accept (the “FS Third Party Buyer” and such offer, the “FS Third Party Offer”), Selling Member shall first deliver a written notice (an “FS ROFR Notice”) to the other Member”
    BXDC 8-K (Nov 16 2026), EX-2.1 Exhibit H, Form of Joint Venture LLC Agreement §9.3(b) (filed) · sec.gov
  • termination$150M
    either side may walk away if the deal has not closed by Dec 31 2026, a date the agreement lets be extended; a side that fails to close when required owes the other a $150.0M termination fee, its sole remedy — the agreement sets the same $150,000,000 for BXDC's side (§8.3(a)) and Amazon's (§8.3(b)). The release expects closing in Q4 2026; the call, 'late in the fourth quarter of this year'
    “The Contribution Agreement may be terminated by either the Company Parties or the Tenant Parties if the Closing does not occur by December 31, 2026 (or such later date as extended pursuant to the Contribution Agreement). Termination by either party for the other party’s failure to consummate the Closing when required will entitle the non-breaching party to a termination fee of $150.0 million as its sole and exclusive remedy.”
    BXDC 8-K (Nov 16 2026), Item 1.01 (filed) · sec.gov
  • release13
    the release's words for the buildings — 'powered shells' — and its rounded 75/25; it calls the deal 'BXDC’s inaugural investment' and expects it 'to close in the fourth quarter of 2026'
    “The joint ventures will own 13 newly constructed powered shells across two AWS data center campuses, with AWS retaining a 25% interest in the joint ventures.”
    BXDC release (EX-99.1 to the Item 1.01 8-K, Nov 16 2026; furnished) · sec.gov
  • shell-onlymore than 50%
    what BXDC is buying, by its CEO on the call: a basis 'more than 50% below estimated turnkey replacement costs', rents 'more than 70% below' comparable turnkey assets, and the servers, racks, mechanical and cooling equipment all 'made by and maintained by the tenant', plus Amazon's parent guarantee. Of the land and buildings themselves: 'as the owner here, we own literally just that, the land and the powered shell' (owner-scope); and Amazon keeps 'responsibilities for the operations and maintenance of the assets'. Management's estimates, which the record cannot check
    “Additionally, our investments have other notable attractive characteristics, including a basis that is more than 50% below estimated turnkey replacement costs, rents more than 70% below those of comparable turnkey assets in these markets, the substantial investment in the servers, racks, and mechanical and cooling equipment that were all made by and maintained by the tenant, and a parent guarantee from Amazon of payment obligations under the lease.”
    BXDC Q3 2026 call, Nov 16 2026 — CEO Nick Pell (StockAnalysis transcript; the Motley Fool and Earnings Whispers print the same) · stockanalysis.com
  • owner-scope
    the CEO, asked how the buildings would serve another tenant: they are 'Amazon spec' — Amazon 'self-built these, hence the sale-leaseback' — and BXDC owns only the land and the powered shell, with Amazon controlling the data halls' configuration
    “Obviously, these are powered shells too, and so, as the owner here, we own literally just that, the land and the powered shell. Amazon really controls all of the different configurations within the data halls themselves to be able to be very flexible and adapt to the changing marketplace with their respective customers.”
    BXDC Q3 2026 call, Nov 16 2026 — CEO Nick Pell, Q&A (StockAnalysis transcript) · stockanalysis.com
  • cap-rate-vs-plan7%
    why a 7.0% cap rate, by BXDC's CIO on the call: the trust had expected to buy finished ('turnkey') data centers at a low-6% cap rate and is buying powered shells at 7% instead. The prospectus's yield range was 5.75–7.00% or higher (buy-box), so 7.0% is its top; with the 2.75% escalators the CEO put the GAAP yield at 8.1%
    “When we created this company, we thought we were going to buy turnkey assets at a low 6% cap rate. And instead, we're buying powered shells at a 7% cap rate.”
    BXDC Q3 2026 call, Nov 16 2026 — CIO Mike Forman, Q&A (Motley Fool transcript) · fool.com
  • bxdc-share$3.7B
    BXDC's 'share' of the $5.0B, by its CFO on the call: $3.7B, funded with $1.9B of cash — 'effectively deploying the entirety of our IPO proceeds' — and its 'allocable $1.9 billion share' of the ventures' debt (75.1% of ~$2.5B ≈ $1.88B, our arithmetic). 75.1% of $5.0B is $3.76B, and $1.9B + $1.9B is $3.8B: rounding, not three figures. No filing states the share in dollars; the agreement's BX Contributions come out near it (min-distribution)
    “Under the terms of the transaction, BXDC will hold a $3.7 billion share of the total $5 billion joint venture. We expect to fund our investment with $1.9 billion of cash, effectively deploying the entirety of our IPO proceeds, and our allocable $1.9 billion share of asset-level financing.”
    BXDC Q3 2026 call, Nov 16 2026 — CFO Tony Marone (StockAnalysis transcript; the Motley Fool and Earnings Whispers print the same) · stockanalysis.com
  • leverage49%
    BXDC's leverage after the deal, as its CFO projected it: ~49%, against a long-term target of 40% it keeps; BXDC has 'a committed bank facility in place' while it explores 'various capital markets executions'. Asked about the deal's ~50% loan-to-value, he said BXDC wanted to deploy all of its IPO proceeds and expects later purchases to use less debt, to 'average down towards that 40%'
    “Importantly, we have a committed bank facility in place as we explore various capital markets executions, consistent with our strategy to construct a diversified, stable balance sheet and match our investments with conservative, well-structured financings. We expect the implied leverage level for BXDC following this transaction to be approximately 49%, but we remain committed to our long-term target of 40%.”
    BXDC Q3 2026 call, Nov 16 2026 — CFO Tony Marone (StockAnalysis transcript; the Motley Fool prints the same) · stockanalysis.com
  • mortgage-rate
    the loans' expected rate, the CFO's estimate when asked: SOFR plus 150–200 basis points or so ('mid to upper 100s'), 'slightly higher financing costs than during the IPO'. Not a term of any document
    “We are penciling SOFR plus mid to upper 100s as we look at a variety of options.”
    BXDC Q3 2026 call, Nov 16 2026 — CFO Tony Marone, Q&A (StockAnalysis transcript) · stockanalysis.com
  • buy-box$15,000,000
    the prospectus's target per building: $250M–$1.5B+, or 20–100 MW, at an assumed $15M per MW — the deal's ~$7.7M per MW of IT power (per-building, our arithmetic) is about half that. Its other targets: a weighted-average lease term of 10–20 years, escalators of 2.0–3.0% a year, a yield of 5.75–7.00% or higher; the deal's 12 years, 2.75% and 7.0% sit inside each (but see lease-term-criteria)
    “Represents expected size per building and assumes $15,000,000 per MW average acquisition cost.”
    BXDC final prospectus (424B4, May 15 2026), Business — Clearly Defined Buy Box (filed) · sec.gov

Contested figures 5 not reconciled — every position side by side, with its source and tier

cash-at-closingone entry, in its own words
what Amazon's affiliates will be paid at closing — at least $4,328,452,478 by the agreement's closing condition (min-distribution), adjustable with the loans' final size and net of Amazon's 24.9% of certain costs — vs about $4.4B, BXDC's $1.9B plus the ~$2.5B of loans before any costs (techi's arithmetic, and ours: the 8-K funds the payout from BXDC's cash and the loans' net proceeds, and the loans' proceeds also pay transaction costs). The final loan size and the costs are undisclosed and the deal has not closed: about $4.33–4.4B, no pick. The floor is the least Amazon's side is bound to close for (a condition it may waive), and BXDC's side must close even if the loans are not funded (no-financing-contingency). The call's $3.7B is BXDC's share of the value (bxdc-share), not this EX-2.1 §6.1(f) vs techi (Nov 16 2026) and the 8-K's funding sentence
first-year-rentone entry, in its own words
how much rent — no document states it in dollars. BXDC defines its 7.0% initial cap rate as the first year's base rent over the $5.0B (value-basis), which makes about $350M a year at 100% to start (our arithmetic; TheEnergyMag, techi and thetechbag do the same sum) and about $263M on BXDC's 75.1%; DCD puts 'Blackstone’s yearly net operating income for the investment at around $350 million' — the whole ventures' rent on BXDC alone, and as income rather than rent. Rising 2.75% a year, 12 years of it is about $4.9B (our arithmetic; techi's too) — the ribbon's width — though the 12 years are a weighted average across leases whose own terms and rents are unfiled, and the renewals' rent is not stated at all. No pick transaction summary's cap-rate definition (our arithmetic) vs DCD (Nov 16 2026)
call-capacityone entry, in its own words
the capacity as the CEO spoke it in his prepared remarks on the call — 'approximately 50 MW of total power capacity' (StockAnalysis transcript; Earnings Whispers: 'approximately 50 megawatts', repeated by MarketBeat on Yahoo and by BigGo) vs 'approximately [indiscernible] megawatts of total power capacity' (the Motley Fool's transcript of the same sentence) — against 647 MW in the 8-K, the 10-Q and the transaction summary (properties). 647 ÷ 13 ≈ 49.8 MW a building (our arithmetic), so a transcribed 50 may be a per-building figure or a mishearing; the audio is not in the record. At $5.0B, 50 MW in all would be ~$100M per MW against the buy box's $15M. The filed 647 MW stands; this cell records what the transcripts print StockAnalysis + Earnings Whispers transcripts vs the Motley Fool's (Q3 call, Nov 16 2026)
campus-identityone entry, in its own words
which buildings — the filings say only St. Joseph County, Indiana (nine) and Madison County, Mississippi (four) (counties). In St. Joseph County Amazon is building near New Carlisle on two campuses of nine first-phase buildings each, both Project Rainier, the cluster AWS built for Anthropic (rainier), by Baxtel — the north one its first phase, where 'Seven buildings on the north campus are already online' (WNDU, Nov 10 2026), and the south one its extension, where 'All nine first-phase buildings are complete' (Baxtel). In Madison County Amazon has sites at Canton (MDEQ's response to comments) and Ridgeland, whose water agreement calls its first phase 'JAN 200' — and the contribution agreement calls the Mississippi campus only 'JAN'. No document in the record ties the ventures to a campus in either county, or to Rainier, so the record links no site; the transaction summary's '2026 Avg. Vintage' is an average BXDC Q3 2026 10-Q vs WNDU (Nov 10 2026), Baxtel (Nov 2026), MDEQ (Oct 2026) and the Ridgeland water agreement
lease-term-criteriaone entry, in its own words
whether leases averaging 12 years meet BXDC's own criteria — the 8-K says the leases' terms are 'materially consistent' with the prospectus's buy box and its form lease (leases). The buy box asks a weighted-average lease term of 10–20 years, which 12 meets (buy-box; the transaction summary's comparison column says the same); the form lease's footnote expects 'long-term leases with initial terms of at least 15 years, though BXDC may selectively consider leases with shorter initial terms' (S-11 EX-10.4), which 12 meets only through that exception. No document says which governs. No pick BXDC 8-K + 424B4 buy box vs S-11 EX-10.4 form lease

Scope note what this record leaves to other records

NOT this record (carried elsewhere or not carried): the campuses' own facts — how many New Carlisle buildings are online (seven on the north campus in Nov 2026, WNDU; all nine of the south campus's first phase complete, Baxtel), the 32 planned there, IT-capacity and chip estimates (Epoch, measuredai), jobs, the I&M and NIPSCO power arrangements, Madison County's generator permits and water agreements — none of which a document ties to the ventures' 13 buildings; Madison County's 2026 tax-roll dispute over five Amazon buildings (the assessor's ~$292M a building against Amazon's ~$69–70M — WLOX, Mississippi Today, Mississippi Free Press), likewise not tied to the four Mississippi buildings here, so its figures are not set beside the $385M; Blackstone's platform totals (~$225B of data-center and digital-infrastructure transactions since 2018, over $150B of it in data-center assets, $84B in its Infrastructure group — 424B4) and BXDC's IPO share counts, fees and revolving credit facility (the bxdc entity, or not carried here); Ridgeland's water capacity (a campus fact); Amazon's Q3 2026 capex, backlog and its Anthropic and OpenAI financing (their own records). Not circular in this record's sense: BXDC's money returns to it as rent for buildings it owns, not as spending on anything it sells — though Amazon, as the ventures' 24.9% owner, gets about a quarter of its own rent back. And unlike Meta at Hyperion (meta-blueowl-hyperion), Amazon gives no residual-value guarantee in any document here, so BXDC carries what the shells are worth when the leases end; the Amazon lease itself is an omitted exhibit (EX-2.1's Exhibit K). Amazon's books: its filings in the record predate the signing (Q3 2026 10-Q), so whether it will account for the deal as a sale or as a financing is unstated, and the record does not say the buildings leave Amazon's balance sheet. One condition of Amazon's side closing does touch its accounting — SEC staff confirmation that Amazon need not consolidate the ventures (sec-pre-clearance) — which is about the ventures, not about whether the leaseback counts as a sale. The call's other figures, management's and unchecked: an 8.1% GAAP yield (the rent averaged over the lease), a going-in AFFO yield 'in the low to mid 5% range', and 'more than 70% below' comparable turnkey rents (shell-only). Not adopted: the call transcripts' '50 MW' (contested call-capacity); DCD's '$350 million' as Blackstone's income (first-year-rent); the IPO's '$1.75 billion' — the base deal before the option, which the IPO 8-K says was exercised in full — in DCD and Financial News; and the '$12 billion' data center St. Joseph County's council refused to rezone for in Dec 2025, which BXDC's 10-Q cites as a market risk without saying whose it was.

More between these companies

  1. Nov 3, 2025 updated Nov 21

Everything between Amazon / AWS and Lenders & bondholders →