A London-based AI-cloud company, incorporated in 2024, that builds or rents data centers in Europe and the US, fills them with Nvidia GPUs and rents the computing power out under multi-year contracts.

5 deals (5 T1) · 4 flows on the money map ·

Deals 5

sort: · · ·
  1. Aug 26, 2026 updated Nov 19
  2. Dec 18, 2025
  3. Sep 25, 2025 updated Nov 19
  4. Sep 16, 2025 updated Nov 20
  5. Jul 31, 2025 updated Nov 19

Money in and out 4 ribbons

Who pays Nscale (left), and whom it pays (right). Width is a rough size in $B, per year for multi-year deals.

← swipe to see the whole chart →

sourced deal · 4 of 4 full amount, no yearly rate · 1 of 4

As a table · 4 ribbons
Timeline 11 dated entries
  1. Nov 2026NC-1, Madison NC: all 40 MW of its colocation at WhiteFiber operational (WhiteFiber Q3 10-Q, T1); billing on the second 20 MW hall from Nov 9, by WhiteFiber's CEO on the Q3 call (T2) — whitefiber-nscale
  2. Oct 2026Ward County 'a live AI data center delivering thousands of GPUs'; 'over 50,000 GPUs' across six active data centers, 24,000 deployed in the prior month — company-wide, not tied to a Microsoft tranche (Oct 1 release, T1)
  3. Sep 2026S-1 filed Sep 18 (NYSE 'NSCL', price range blank): Microsoft SOWs up to ~$43.8B through Dec 2033 — ~$35.0B through Dec 2031 in the drafts; $103.4B active-and-contracted TCV, $2.6B active, at Aug 31 (T1) · pre-IPO convertible: a minimum $3.1B incl. NVIDIA's $1.0B (S-1) → $3.36B (Sep 25 release) — nscale-msft; the convertible: nv-nscale
  4. Aug 2026Anthropic Services Agreements (Aug 25): up to ~$44.6B at the Monarch Compute Campus, four agreements, financing not yet committed (T1 S-1; Aker: 'around USD 45 billion', customer undisclosed) — anth-nscale-monarch · Ward County $1.85B GPU facility (Aug 27), 'Customer' = Microsoft Corporation (T1 ex-10.23)
  5. May 2026Sines: 66,000+ Vera Rubin for Microsoft from late 2027 at SIN02, bought Apr 24 (T1 S-1 / release) · $790M Kvandal South financing for Narvik (T1)
  6. Apr 2026OpenAI withdraws from Stargate Norway and Stargate UK (T1 S-1; of the UK, OpenAI says it will 'move forward' when conditions allow — 'being paused', per CNBC); Microsoft takes the Norway capacity — +30,000 Rubin at Narvik for 2027 (T1 S-1 / Apr 14 release) — nscale-msft, sg-nscale-europe
  7. Mar 2026Series C $2B at $14.6B (Mar 9), Aker's 50% of the Narvik JV rolled into Nscale · Monarch Compute Campus bought with a 1.35 GW Microsoft LOI (Mar 16) — gone from the filings from Jun 26 (T1)
  8. Dec 2025WhiteFiber colocation at NC-1, Madison NC (signed Nov 22, announced Dec 18): 40 MW of IT load for ten years, ~$865M incl. escalators and one-time installation charges (WhiteFiber 8-K, T1) — whitefiber-nscale
  9. Oct 2025~200,000 GB300 with Microsoft across Texas, Norway, Portugal and the UK (Oct 15, T1) · Ward County lease from Ionic Digital (126 months, 234 MW); NVIDIA guarantees five years of rent, up to $860.3M, for warrants (T1)
  10. Sep 2025Narvik: binding five-year ~USD 6.2B Microsoft contract signed by Nscale, Aker and Microsoft (Sep 17) · Loughton commitment with Microsoft and Stargate UK with OpenAI and NVIDIA (Sep 16) · Series B $1.1B (T1)
  11. Jul 2025Stargate Norway with Aker and OpenAI (Jul 31): 230 MW, a 100,000-GPU target, OpenAI 'an initial offtaker' (T1) — sg-nscale-europe

Timeline entries carry no source field yet; some name one inline.

Notes in the record on Nscale

Nscale Limited (England and Wales; SEC CIK 2110365; to re-register as Nscale plc) — since a May 2026 reorganisation the holding company of Nscale Global Holdings Limited (incorporated May 29 2024) and of Arkon Energy Pty Ltd; London HQ. Form S-1 filed Sep 18 2026 for a NYSE listing as 'NSCL' (price range blank) after four confidential drafts from Feb 17 2026, the first filed as DSNS Holdings — the dated trail is in its draft registration statements on EDGAR. Company-wide figures, never Microsoft's: $6.4B active / $105.8B active-and-contracted TCV at the date of the amended S-1 (Nov 12 2026), up from $2.6B / $103.4B at Aug 31 2026 (S-1) and $0.5B / $38.0B at Dec 31 2025; 'a number of contracts to deploy and operate GPU clusters' entered into after Jun 30 2026 'for an aggregate amount of $52.5 billion' (S-1 subsequent-events note; counterparties unnamed, not broken down by customer); weighted-average contract life ~5.7 years; weighted-average prepayment 'approximately 20% of our TCV of $105.8 billion' at Nov 12 2026, 23% in the S-1 ('the amount and timing of prepayments vary by contract and customer credit profile'); RPO $56.4B at Jun 30 2026 incl. $7.1B of significant-financing component ($34.5B at Dec 31 2025); ~25,000 active and ~461,000 active-and-contracted GPUs, ~1.37 , 17 sites (5 active, 12 contracted) at Aug 31 2026 → 'over 50,000 GPUs' in six active data centers by Oct 1 2026. Revenue $19.1M FY2024 / $33.0M FY2025 / $140.6M H1 2026; the largest customer was 73% of FY2025 and 52% of H1 2026 revenue, unnamed (the Feb 17 draft named ByteDance for FY2025), so no filed figure gives Microsoft's share of revenue. Customers: Microsoft (nscale-msft — up to ~$43.8B through Dec 2033); Anthropic (four 'Anthropic Services Agreements' of Aug 25 2026 at the Monarch Compute Campus, Mason County WV — up to ~$44.6B, financing not yet committed; Aker: 'around USD 45 billion' with an undisclosed customer — anth-nscale-monarch); NVIDIA (master services agreement, Jul 2025: reserved capacity in Iceland, the UK and Norway, $1.2B aggregate); Figure AI (Aug 24 2026, 'the potential to deploy up to 100,000' Vera Rubin GPUs). OpenAI's Stargate Norway and Stargate UK partnerships stopped in Apr 2026 — withdrawn, per Nscale; the UK on hold, per OpenAI (sg-nscale-europe). NVIDIA, four roles at once — GPU supplier; >5% shareholder since the Series B; customer (the $1.2B MSA); guarantor of the Ward County rent up to $860,340,000, paid for in (nscale-msft) — plus $1.0B of the Sep 2026 pre-IPO (the 'NVIDIA Sale', closing on or around Nov 16 2026; S-1: a minimum $3.1B = $2.1B of notes + NVIDIA's $1.0B; Nscale's Sep 25 release: $3.36B = $2.36B + $1B): the vendor-circularity pattern of nv-coreweave-equity / nv-nebius-2026 — nv-nscale. Equity: Series B $1.1B (Sep 2025); Series C $2B at $14.6B (Mar 9 2026, led by Aker and 8090 Industries), with Aker's 50% of the Aker Nscale JV (Narvik) rolled into Nscale for $1,868.8M of consideration, almost all in shares (the S-1's '$1.8 billion in shares' elsewhere is the same transaction, rounded); Aker 22.76% fully diluted afterwards (Aker's figure). Going concern: reliance on uncommitted financing 'initially raised substantial doubt', which a plan to 'defer, reduce or cancel capital expenditure' would 'alleviate' (S-1 financial-statement note) — a resolved doubt, not the going-concern warning Fortune's headline implies. Monarch Compute Campus: 'an approximately 2,250-acre site which can deliver up to 8GW of gross behind-the-meter power' (S-1), bought with AIPCorp in Mar 2026 — Microsoft's 1.35 GW LOI, then Anthropic. Sites with no Microsoft link on file: Madison NC (colocation at WhiteFiber's NC-1, 40 for ten years, ~$865M by WhiteFiber's count — whitefiber-nscale; a $1.2B GPU facility whose 'Customer' is redacted) and Iceland. Not adopted: Fortune's '$3.1 billion from Nvidia'; TechTimes' '$51 billion' of contracted revenue; measuredai's inverted warrant flow; CoreWeave's 62%/67% Microsoft concentration (another company's figure); the FT's $35B IPO valuation (press; the price range is blank).