Where it standsfrom Hut 8’s 10-Q for the quarter to Sep 30, 2026
Deals 3
- May 6, 2026 updated Nov 19
- Dec 17, 2025 updated Nov 20
- Aug 2025 updated Nov 21
Money in and out 2 ribbons
Who pays Hut 8 (left), and whom it pays (right). Width is a rough size in $B, per year for multi-year deals.
← swipe to see the whole chart →
sourced deal · 1 of 2 estimated size · 1 of 2
As a table · 2 ribbons
Timeline 5 dated entries
- Sep 2026Press stack on Beacon Point: FT (Jul 28, five people) names Nvidia as the tenant; WSJ (Aug 31) — Anthropic buys ~$35B / ~350 MW of compute from Lambda there, Nvidia holds the lease, Lambda pays Nvidia an undisclosed rent; the six-year term is AFP's single source, not the Journal's (T2; Anthropic declined to comment, Nvidia/Lambda/Hut 8 did not respond) · ERCOT base-load designation for the 1 GW site is CONDITIONAL (T2 Blockspace, Sep 8) — see nv-hut8-beacon-point
- Jul 2026Beacon Point Phase 2 lease (Jul 20, 8-K Item 8.01 + ex-99.1): a second 352 MW / 15-yr NNN / ~$9.8B lease to 'the Phase 1 tenant' → campus 704 MW on 1,000 MW AEP Texas, $19.6B base / $50.2B with options, NOI $1.31B/yr; first Phase 2 hall Q2 2028; energization Q1 2027 'on schedule' (T1)
- Jun 2026$4.25B 6.129% senior secured notes due Nov 30 2042 at Beacon Point DC LLC (priced Jun 4, closed Jun 9 at par; 8-K Items 1.01/2.03 + ex-4.1): Baa2, T+165 bp, non-recourse to Hut 8, first-priority liens + HoldCo equity pledge, amortising from May 30 2030, par call May 30 2042 — Phase 1's six halls only; tenant 'a high-investment-grade company (i.e., rated AA- or higher)'; indenture lists Nvidia first among six Qualifying (replacement) Tenants — the same list, same order, as the River Bend indenture for the Fluidstack lease, so boilerplate, not a naming (T1)
- May 2026Beacon Point Phase 1 lease disclosed (May 6; dated Mar 12 per the indenture, amended Apr 29): 352 MW / 15-yr NNN / ~$9.8B base incl. 3% escalator / ~$25.1B with three 5-yr options / NOI ~$655M, to 'a multi-trillion-dollar market capitalization, high-investment-grade technology company'; first hall Q3 2027 (T1 Q1 10-Q) · first hall rescoped 224 → 352 MW to NVIDIA's DSX architecture, +$3.6B of base value (T1 Q2 call)
- Dec 2025River Bend, LA: 15-yr lease for 245 MW to Fluidstack USA IV, $7.0B / $17.7B with options, Google backstop of all base-term rent (amount undisclosed); announced as a partnership 'for Anthropic', up to 2,295 MW of which 245 signed (T1) — fs-hut8-river-bend · $3.25B 6.192% notes due Nov 15 2042 closed Apr 30 2026 at ~95% loan-to-cost (T1) · Nov–Dec 2025: 524 acres bought in Nueces County for $17.5M (T1 10-K)
Timeline entries carry no source field yet; some name one inline.
Notes in the record on Hut 8
Hut 8 Corp. (Nasdaq, TSX: HUT; CIK 1964789). Sites in this monitor: Beacon Point, Nueces County TX (two 352 critical-IT leases, 15-yr NNN, ~$9.8B each / $19.6B / $50.2B with options, one unnamed 'rated AA- or higher' tenant; $4.25B 6.129% Baa2 notes due Nov 30 2042 at Beacon Point DC LLC fund Phase 1 — nv-hut8-beacon-point) and River Bend, West Feliciana Parish LA (245 MW to Fluidstack USA IV, 15-yr, $7.0B base / $17.7B with options, Google guarantee; $3.25B 6.192% notes due Nov 15 2042 at Hut 8 DC LLC — fs-hut8-river-bend). Contracted AI portfolio after Jul 20 2026: 949 MW critical IT on 1,330 MW utility, ~$26.6B base-term contract value, >$1.75B expected average annual NOI (Q2 release); $7.5B of project debt closed, all non-recourse to the parent; build-cost guidance $9–11M per critical MW at both campuses; development pipeline ~8,660 MW at Jun 30 2026 (a dated measure, not capacity). Q2-2026 GAAP revenue $74.9M (Power, Digital Infrastructure, Compute; never the '$105.18M adjusted' consensus artefact); no lease revenue before the first delivery (Q2 2027 River Bend, Q3 2027 Beacon Point). ~700 MW of its infrastructure serves the affiliated miner American Bitcoin (stake contested: ~80% Oct 2025 → ~54% Aug 2026 after ABTC's raises — dilution, undated on file). Beacon Point acreage is three Hut 8 numbers (521 / 524 / 525 — see the record).