Why it matters
Cipher Digital leases Black Pearl to an Amazon subsidiary under a 'limited' Amazon.com guarantee; Barber Lake, a Cipher site Fluidstack rents, has Google guaranteeing part of the rent in return for on Cipher's shares. Cipher's slide puts Black Pearl's bonds at 6.125% and about 85% of cost, against 7.125% and about 71% for Barber Lake, without saying why. Black Pearl's bonds fall due about ten years before its base lease ends.
Tap a figure for the line in its source.
Amazon / AWS gives Cipher Digital
- of rent over the 15-year base term, by Cipher's estimate in documents it furnished, not filed; ~$14.1B if all three 5-year extensions are used
- Amazon.com, Inc.'s 'limited parent guarantee' of its subsidiary's payments under the lease, effective only once rent starts; no document in the record states its limit
- per of computing load: construction costs above that allowance are the tenant's to pay, by Cipher's financing slides
Cipher Digital gives
- of turnkey data-center capacity, 216 of it computing load, at Black Pearl near Wink, Texas, subleased to Amazon Data Services, Inc.; 18 MW handed over by Nov 2026 → Amazon / AWS
- a promise to fund the build's completion if the bond money and its other available funds, its own earlier equity included, fall short → Lenders & bondholders
Lenders & bondholders gives Cipher Digital
- of 6.125% bonds due Feb 2031, sold at face value, for the rest of the build, ~$232.5M back to Cipher for its earlier spending, and debt-service reserves
What happened
In October 2025, Cipher leased its Black Pearl site near Wink, Texas, to Amazon Data Services, an Amazon subsidiary. Cipher is a bitcoin miner now called Cipher Digital. It stopped mining at Black Pearl in February 2026 to turn the site into a data center. The lease runs for 15 years. The site has 300 megawatts of power, 216 of them for computing. Cipher estimates the rent at about $5.5 billion over the 15 years, or $14.1 billion if Amazon uses all three five-year extensions. Cipher gives those figures only in the releases and slides it furnished. Its annual and quarterly reports give no rent figure. Since mid-2026, they refer to the tenant only as 'an investment grade hyperscaler tenant'. Amazon.com backs its subsidiary with what the bond papers call a 'limited parent guarantee'. The tenant pays construction costs above $9.5 million per megawatt of computing load. A Cipher subsidiary borrowed $2.0 billion at 6.125%, due in 2031, to finish the build. Handover began in August 2026, two months early at the tenant's request. It had reached 18 megawatts by November. Cipher has a new schedule for the rest and has yet to publish it.
Sources 24 documents — 15 SEC filings · 3 other documents · 2 company releases · 2 transcripts · 1 research note · 1 law-firm note
Research trail Found 353 documents and read 320 of them while checking this deal and related ones.
- States 7 figures: 300 MW tenant unnamed · options · amendments · commencement · $5.9M hpc revenue · $485.164M commenced rent · $46.2M deferred rent
- States 7 figures: $5480M rent schedule · 216 MW IT load · 3% escalator · $9.5M capex allowance · $578M initial basis · termination rights · deck illustration
- States 5 figures: sublease · land · guarantee · lease default · $236M dsra
- States 5 figures: $2B notes · 6.125% coupon maturity · 7% amortization · $232.5M use of proceeds · completion guarantee
- States 3 figures: $14.1B extended value · $367M avg annual NOI · 18 MW delivered
- States 2 figures: 300 MW lease · 150 MW site history
- States 2 figures: 85% loan to cost · $13B book
- States 300 MW tenant
- States original schedule
- States $5.5B contract value
- States acceleration
- States fitch rating
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: Cipher Q3-2025 10-Q (2025-11-03), FY-2025 10-K, Q1/Q2/Q3-2026 10-Qs; 8-K of 2026-02-11 (Items 1.01/2.03 + EX-4.1 indenture); furnished: Nov-3 2025 release and slides (Items 2.02/7.01), Feb-3 2026 financing deck (Item 7.01), Feb-24, Aug-4 and Nov-2 2026 business updates; Q3-2026 call transcript; cipherdigital.com; Fitch (2026-02-13); SAVRN; MMCG (read 2026-11) · as of Nov 2026
The evidence 36 sourced figures · 6 disputes
The record's headline Cipher–AWS, Black Pearl (Wink TX): 15-year triple-net sublease of 300 gross / 216 MW critical IT to Amazon Data Services under Amazon.com's 'limited parent guarantee' — ~$5.5B base term (furnished only; ~$14.1B with three 5-year options); $2.0B 6.125% notes due Feb 2031 at ~85% of cost; first 18 MW delivered from Aug 2026
- Size
- ~$5.5B base term (15 yrs; furnished; ~$14.1B with three 5-yr options) · 300 MW gross / 216 MW critical IT · $2.0B 6.125% senior secured notes due Feb 15 2031 · 18 MW delivered (Nov 2026)
- When
- Oct 28–29 2025 sublease → Nov 3 announced → Nov 21 Amazon.com limited parent guarantee → Feb 3 2026 notes proposed → Feb 4 purchase agreement → Feb 11 issued ($2.0B, 6.125%) → Feb 2026 mining ends → Nov 2025–Jul 2026 three amendments → Aug 2026 initial phase commences, rent begins → Nov 2 2026: 18 MW delivered, rest on an updated schedule → Feb 15 2031 notes mature; 15-year base term from commencement + 3 × 5-yr options
- Status
- sublease dated Oct 28 2025, 'executed' Oct 29 (10-Q); announced Nov 3 2025; Amazon.com's limited parent guarantee dated Nov 21 2025; three lease amendments Nov 2025–Jul 2026 (data hall configuration, milestone dates); notes issued Feb 11 2026; mining at the site ceased Feb 2026; initial phase commenced Aug 2026, two months early at the tenant's request — 18 MW of critical IT delivered by Nov 2 2026; the remaining halls on an 'updated phased delivery schedule' with no dates published. Neither the lease nor the guarantee is filed
- Structure
- 15-year triple-net sublease — the indenture's word — of a turnkey data center at Black Pearl, Wink TX, from Cipher Black Pearl LLC to Amazon Data Services, Inc., under Amazon.com, Inc.'s 'limited parent guarantee' (dated Nov 21 2025) of the tenant's payments; Cipher Mining Inc. (now Cipher Digital) is landlord guarantor (deck). Cipher Black Pearl holds the ~75-acre site under an intercompany land lease from 11786 Wink LLC, the subsidiary that owns the land. 3.0% annual escalator (deck); three 5-year tenant extension options plus a short-term extension under specified conditions (10-Q). The tenant pays all construction costs above a $9.5M per IT MW allowance, which counts a $578M initial capex basis, less up to $288.0M recaptured from the old mining equipment (deck). Tenant termination rights include a 120-day delivery delay with a 30-day cure period, and a grid outage over 180 consecutive days; none for convenience after final rent commencement (deck). Delivered in phases — Phase 1 retrofits three data halls and a network hall in existing buildings, Phase 2 adds a new data hall and network hall (deck). Financed at Black Pearl Compute LLC: $2.0B of 6.125% senior secured notes due Feb 15 2031, guaranteed by Cipher Black Pearl and 11786 Wink, amortizing at 7% a year of the original principal once every phase is complete; Cipher completion guarantee. A default on the notes if the lease, the land lease or the Amazon guarantee ceases to be in effect (indenture)
- Programme
- Cipher–AWS
- Parties
- Amazon / AWS the tenant and its guarantor — the lessee is Amazon Data Services, Inc. ('Amazon Tenant'), and Amazon.com, Inc. ('Amazon Parent') gives a 'limited parent guarantee' of its payments (indenture); Cipher's announcements name 'Amazon Web Services', its FY-2025 10-K 'Amazon Web Services, Inc.' · Cipher Digital landlord and developer through subsidiaries — Cipher Black Pearl LLC, the sublessor; 11786 Wink LLC, which owns the land and leases it to Cipher Black Pearl; Black Pearl Compute LLC, which issued the notes (both subsidiaries guarantee them) — with Cipher Digital Inc. as landlord guarantor (deck) and completion guarantor (8-K) · Lenders & bondholders bondholders — $2.0B of 6.125% senior secured notes due 2031, sold privately (Rule 144A / Regulation S) through Morgan Stanley as representative of the initial purchasers; '~$13.0 billion in initial book interest' by Cipher's account
- Record
- disclosed / primary source · as of Nov 2026
Flows 5 as the record states them
- Amazon / AWS → Cipher Digitallease-payments~$5.5B over the 15-year base term — Cipher's 'Estimated Contract Value', ~$14.1B with all three 5-year extensions, ~$367M of average annual NOI — in its releases and slides only, never in a filed document; triple net, 3.0% a year escalator (deck), whose illustrative rent schedule sums to $5,480M for 2026–2041. Filed so far: $5.9M of HPC leasing revenue in Q3 2026 and $485.2M of base rent from the components that had commenced by Sep 30 2026 (10-Q)
- Amazon / AWS → Cipher DigitalguaranteeAmazon.com, Inc.'s 'limited parent guarantee', dated as of Nov 21 2025, 'relating to Amazon Tenant’s payment obligations under the Datacenter Lease' (indenture) — 'an amount equal to all base rent and operating expenses' in Cipher's furnished decks; effective only after rent commencement and subject to caps, by Cipher's own risk factor; its limit is stated nowhere in the record
- Cipher Digital → Amazon / AWScapacity~300 MW gross / 216 MW critical IT at Black Pearl, Wink TX, in phases; the initial phase commenced Aug 2026 and 18 MW of critical IT had been delivered by Nov 2 2026; the rest on an updated schedule (deck)
- Lenders & bondholders → Cipher Digitaldebt$2,000.0M of 6.125% senior secured notes due Feb 15 2031, issued at par Feb 11 2026 by Black Pearl Compute LLC — for the rest of the build, ~$232.5M back to Cipher for its earlier equity, debt-service reserves ($236.0M at issue) and fees; amortizing at 7% a year of the original principal once every phase is complete
- Cipher Digital → Lenders & bondholderscompletion-guaranteeCipher's 'customary completion guarantee': it will fund the issuer as needed for the build's timely completion if the notes' proceeds and other available funds, its earlier equity included, fall short (8-K) — cap and duration undisclosed
Resolved figures 36 each with the verbatim line from its document
- lease300 MWapproximately 300 gross MW of turnkey data-center capacity for 15 years, through the subsidiary Cipher Black Pearl LLC, delivered in phases from 2026 — the FY-2025 10-K, which names the tenant 'Amazon Web Services, Inc.' (the Q1-2026 10-Q: Amazon Data Services, Inc. — tenant). 216 MW of it is critical IT, a figure in Cipher's furnished decks only (it-load). The same 10-K's site section dates the lease 'In November 2025' (lease-date)
“In October 2025, through our wholly-owned subsidiary Cipher Black Pearl LLC (“Cipher Black Pearl”), we entered into a 15-year lease agreement with Amazon Web Services, Inc. (“Amazon”) to deliver approximately 300 gross MW of turnkey data center capacity at the site (“Black Pearl” or the “Black Pearl Facility”), with phased delivery expected to commence in 2026.”
Cipher Digital FY-2025 10-K · sec.gov - tenant300 MWAmazon Data Services, Inc. — the lessee as Cipher's Q1-2026 10-Q names it, and as the notes' indenture defines 'Amazon Tenant' (with Amazon.com, Inc. as 'Amazon Parent', the guarantor: guarantee). The announcements say 'Amazon Web Services'
“In October 2025, the Company entered into a 15-year lease agreement with Amazon Data Services, Inc. (“Amazon”) to deliver approximately 300 gross MW of turnkey data center capacity at the Black Pearl Facility, with phased delivery expected to commence in 2026.”
Cipher Digital Q1-2026 10-Q · sec.gov - tenant-unnamed300 MWfrom its June-quarter 10-Q on, Cipher no longer names the tenant in its quarterly reports: the same lease is with 'an investment grade hyperscaler tenant' in the Q2-2026 10-Q and in this Q3-2026 one (which adds that the initial phase commenced in August 2026: commencement). Its Aug 4 and Nov 2 2026 results releases and decks and its Nov 2 call name no Amazon entity either (the Aug 4 release: 'its investment-grade hyperscale tenant'). Amazon is still named elsewhere: Cipher's June 2026 Stingray financing deck ('First lease with Amazon Data Services was for 300 gross MW at Black Pearl site'), its CFO in October 2026 ('two deals with AWS directly facing them', KBW conference), its website. No document says why the reports stopped
“In October 2025, the Company, through its wholly owned subsidiary Cipher Black Pearl LLC, entered into a 15-year lease agreement with an investment grade hyperscaler tenant to deliver approximately 300 gross MW of turnkey data center capacity at the Black Pearl Facility (the “Black Pearl Facility Lease”).”
Cipher Digital Q3-2026 10-Q (filed 2026-11-02) · sec.gov - subleasewhat the lease is, in the filed indenture: a sublease, dated October 28 2025 and amended before the notes were issued, between Cipher Black Pearl and Amazon Data Services — Cipher Black Pearl itself leases the land (land). The amendments are not public, and neither is the lease (lease-date for the day; amendments for the count)
““Datacenter Lease” means the sublease agreement dated October 28, 2025, as amended and supplemented as of the Issue Date”
Black Pearl Compute LLC indenture, 6.125% senior secured notes due 2031 (8-K EX-4.1, filed 2026-02-11), definitions · sec.gov - landwho holds the ground: Cipher Black Pearl rents the site from 11786 Wink LLC under a lease dated as of December 6 2023 — and 11786 Wink is itself a wholly owned Cipher subsidiary (the 8-K: 'a wholly-owned subsidiary of Black Pearl Compute') that guarantees the notes. So the FY-2025 10-K's two descriptions agree: the ~75 acres are 'owned by a wholly-owned Cipher subsidiary', and Cipher Black Pearl 'assumed a lease' on them in December 2023 (ten years, four 10-year renewals). The furnished deck says it outright: 'Land owned by a subsidiary of the Issuer and leased to Cipher Black Pearl LLC', 'an intercompany land lease', $2.7M of land rent over the 15 years. Both sides of the ground lease under Amazon's sublease are Cipher's
““Real Estate Lease” means that certain lease agreement dated as of December 6, 2023”
Black Pearl Compute LLC indenture (8-K EX-4.1, filed 2026-02-11), definitions; FY-2025 10-K; Feb-3 2026 deck (furnished) · sec.gov - guaranteewhat Amazon.com gives: a 'limited parent guarantee', dated as of November 21 2025 — three weeks after the sublease — 'relating to Amazon Tenant’s payment obligations under the Datacenter Lease'. 'Limited' is the indenture's word, and the indenture states no limit; the guarantee is not filed. Cipher's own risk factor (FY-2025 10-K) says its tenants' guarantees take effect only after rent commencement and carry 'caps on such guarantor’s liability'. The furnished decks describe it without the word (contested guarantee-scope)
““Amazon Guaranty” means the limited parent guarantee dated as of November 21, 2025, from Amazon Parent relating to Amazon Tenant’s payment obligations under the Datacenter Lease. “Amazon Parent” means Amazon.com, Inc. “Amazon Tenant” means Amazon Data Services, Inc.”
Black Pearl Compute LLC indenture (8-K EX-4.1, filed 2026-02-11), definitions · sec.gov - lease-defaulthow the bonds hang on the lease: it is an event of default under the indenture if the sublease, the land lease or Amazon's guarantee 'ceases to be in effect'
“(9) the Datacenter Lease, the Real Estate Lease or the Amazon Guaranty ceases to be in effect.”
Black Pearl Compute LLC indenture (8-K EX-4.1, filed 2026-02-11), §6.01 · sec.gov - options3three 5-year extension options, and a short-term extension 'under specified conditions' — the 10-Q's wording; the deck calls them 'tenant extension options'. Cipher must also provide power, operations and maintenance and other services, and may owe rent credits for missed milestones (same paragraph)
“The Black Pearl Facility Lease provides three five-year extension options, as well as a short-term extension option under specified conditions.”
Cipher Digital Q3-2026 10-Q (filed 2026-11-02) · sec.gov - amendments3three amendments between November 2025 and July 2026, which 'among other things' revised the data halls and the milestone dates — one of them, at the tenant's request, brought first delivery forward two months (acceleration). None is filed
“Between November 2025 and July 2026, the parties entered into three amendments to the Black Pearl Facility Lease that, among other things, revised the data hall configuration and milestone delivery dates.”
Cipher Digital Q3-2026 10-Q (filed 2026-11-02) · sec.gov - original-schedule2the schedule as first filed, in the Q3-2025 10-Q's subsequent-events note and MD&A: two phases, July to the fourth quarter of 2026, rent from August 2026. It moved (full-rent), and then first delivery moved forward (acceleration)
“The capacity will be delivered in two phases, expected to begin in July 2026 and complete in the fourth quarter of 2026, with rent commencing in August 2026.”
Cipher Mining Q3-2025 10-Q (filed 2025-11-03) · sec.gov - commencementdelivery in phases, the first from August 2026 — the month Cipher began reporting an HPC leasing segment (10-Q Note 19). The rest of the 216 MW is not dated in any filing (full-rent)
“Delivery of the facility occurs on a phased basis, with the initial phase commenced in August 2026.”
Cipher Digital Q3-2026 10-Q (filed 2026-11-02) · sec.gov - hpc-revenue$5.9Mthe first rent on the record: $5.9M of HPC leasing revenue in Q3 2026 ($5,852K: $5,231K fixed, recognized straight-line, $621K variable — the 10-Q's table), out of $26.7M of total revenue; the rest was bitcoin mining at Odessa. Black Pearl's is the only HPC lease that had commenced (Barber Lake expected Q4 2026, Stingray 2027 — Note 1)
“HPC leasing revenue was $5.9 million following commencement of the initial phase of the Black Pearl Facility Lease in August 2026.”
Cipher Digital Q3-2026 10-Q (filed 2026-11-02), MD&A · sec.gov - commenced-rent$485.164M$485.2M of undiscounted base rent still to come at Sep 30 2026 from the components that had commenced — about $27–30M a year in 2027–2030 ($29,989K, $26,965K, $27,774K, $28,607K) and $363,920K thereafter; base rent only, no reimbursements or variable rent. It covers only what had commenced, not the 216 MW, so it is no measure of the ~$5.5B (contract-value)
“Total undiscounted lease payments $ 485,164”
Cipher Digital Q3-2026 10-Q (filed 2026-11-02), Note 6 · sec.gov - deferred-rent$46.2M$46.2M of deferred rent liabilities at Sep 30 2026, none at Dec 31 2025: by the 10-Q's own definition, contractual lease payments billed ahead of the straight-line revenue — on the one HPC lease that had commenced (hpc-revenue). The 10-Q does not break it down
“As of September 30, 2026, the Company had accrued rent receivables of $1.4 million, included in Other noncurrent assets, and deferred rent liabilities of $46.2 million included in Deferred revenue”
Cipher Digital Q3-2026 10-Q (filed 2026-11-02), Note 6 · sec.gov - site-history150 MWwhat the data center replaces: Cipher mined bitcoin at Black Pearl from June 2025, at 150 MW by September 2025, and stopped in February 2026 'in connection with its conversion into an HPC data center' (Q3-2026 10-Q); ~85% of the infrastructure deployed there is to be reused for the AWS project, and Phase 1 retrofits existing buildings (deck). The site was bought in December 2023 for $7.0M in Cipher shares (Nov 2023 8-K)
“We commenced mining bitcoin at the Black Pearl data center in June 2025 and ramped up to 150 MW of capacity by September 2025.”
Cipher Digital FY-2025 10-K · sec.gov - contract-value$5.5B~$5.5B over the 15-year base term — Cipher's figure in the Nov 3 2025 release and slides ('~$5.5Bn Estimated Contract Value'), furnished under Items 2.02/7.01, and in every later deck. No filed document — the 10-K, the 10-Qs, the Feb 11 8-K, the indenture — gives a dollar value for the lease, and no Amazon document in the record does. The deck's illustrative rent schedule sums to $5,480M (rent-schedule); deal counsel's '$5.5 billion' repeats the release
“Cipher today announced an approximately $5.5 billion, 15-year lease agreement with Amazon Web Services to provide turnkey space and power for AI workloads.”
Cipher release (8-K ex-99.1, furnished 2025-11-03) · sec.gov - extended-value$14.1B~$14.1B of 'Contracted Revenue (Including Extensions)' — the base ~$5.5B plus all three 5-year options at rates no document in the record gives; the options are the tenant's. One column of the Nov 2 2026 deck; furnished
“Black Pearl 300 MW 15 years + three five -year extensions Triple Net $5.5Bn $14.1Bn $367MM High Investment -Grade”
Cipher Q3-2026 business update (8-K ex-99.2, furnished 2026-11-02) · sec.gov - avg-annual-noi$367M~$367M of projected average annual NOI through the base term (the deck's 'average monthly net operating income … multiplied by twelve'), about $5.5B ÷ 15 under a lease whose deck puts the NOI margin at ~100%. A projection, furnished
“Black Pearl 300 MW 15 years + three five -year extensions Triple Net $5.5Bn $14.1Bn $367MM High Investment -Grade”
Cipher Q3-2026 business update (8-K ex-99.2, furnished 2026-11-02) · sec.gov - rent-schedule$5480Mthe deck's illustrative rent: $5,480M over 2026–2041 — $29M in 2026, $282M in 2027, then rising to $441M in 2040 and $338M in the part-year 2041; 'illustrative', on the then-target dates (full-rent)
“Rent Revenue 5,480 29 282 309 319 328 338 348 359 369 380 441 338”
Black Pearl Compute financing deck (8-K ex-99.1, furnished 2026-02-03) · sec.gov - it-load216 MW216 MW of critical IT load on the 300 MW gross — the deck's figure, the only document in the record with an IT-load number for the lease; every third-party 216 MW traces to it
“• Developing Black Pearl (300 Gross MW / 216 MW Critical IT Load), leased to Amazon Data Services, Inc.”
Black Pearl Compute financing deck (8-K ex-99.1, furnished 2026-02-03) · sec.gov - escalator3%rent rises 3.0% a year, triple net: the tenant pays all recoverable operating expenses, taxes and insurance (deck)
“Cipher 3.0% Annual Rent Escalator Triple Net Lease”
Black Pearl Compute financing deck (8-K ex-99.1, furnished 2026-02-03) · sec.gov - capex-allowance$9.5Mthe tenant pays all construction costs above a capex allowance of $9.5M per IT MW (unless the costs are unreasonable or the landlord's fault), and Amazon's guarantee covers that too — × 216 MW ≈ $2.05B, our arithmetic. The allowance counts a $578M initial capex basis (initial-basis)
“Tenant responsible for all construction costs above the Capex Allowance of $9.5MM/IT MW, inclusive of initial capex basis”
Black Pearl Compute financing deck (8-K ex-99.1, furnished 2026-02-03) · sec.gov - initial-basis$578M$578M of the allowance is the 'Initial Capex Basis' Amazon agreed for what Cipher had already built — leasehold improvements and 'legacy compute' — reduced by whatever Cipher recaptures from selling or reusing the old bitcoin-mining equipment, up to $288.0M (same deck)
“$578MM makes up the Initial Capex Basis as agreed upon by Amazon under the lease”
Black Pearl Compute financing deck (8-K ex-99.1, furnished 2026-02-03) · sec.gov - termination-rights120 daysthe tenant may terminate for casualty, condemnation, material interference, a sale to a restricted entity, a 120-day delivery delay with a 30-day cure period, or an anti-bribery violation, and for a grid outage of more than 180 consecutive days not of its making; it has no right to terminate for convenience after final rent commencement (same deck). The lease itself is not public
“Tenant Termination Rights: Casualty, condemnation, material interference, landlord sale to a restricted entity, 120 - day delay in delivery with 30 - day cure period”
Black Pearl Compute financing deck (8-K ex-99.1, furnished 2026-02-03) · sec.gov - acceleration2 monthsan amendment 'at tenant’s request' brought first delivery forward two months, from October to the beginning of August 2026 (the Aug 4 release: 'two months ahead of the original schedule'); rent began then
“Executed amendment to Black Pearl lease at tenant’s request, accelerating first data center capacity delivery by 2 months”
Cipher Q2-2026 business update (8-K exhibit, furnished 2026-08-04) · sec.gov - delivered18 MW18 MW of the 216 MW of critical IT delivered to the tenant by Nov 2 2026 — the only delivered figure any document gives; the rest of Phase 1 in fit-out, Phase 2's foundations and steel done, and an 'updated phased delivery schedule' being put in place with the tenant, with no dates (same slide; the 18 MW repeated on the Nov 2 call)
“First data center capacity was delivered in August ahead of schedule, with 18 MW of critical IT capacity delivered to the Tenant to date”
Cipher Q3-2026 business update (8-K ex-99.2, furnished 2026-11-02) · sec.gov - notes$2B$2.0B of senior secured notes, sold at par through Morgan Stanley as representative of the initial purchasers (Rule 144A / Regulation S), closed Feb 11 2026, by Black Pearl Compute LLC; guaranteed by Cipher Black Pearl and 11786 Wink (8-K). Ratings: BB- from Fitch (fitch-rating), Ba2/BB- in Cipher's own debt table
“The aggregate principal amount of notes sold in the offering was $2.0 billion.”
Cipher Mining 8-K, Item 1.01 (filed 2026-02-11) · sec.gov - coupon-maturity6.125%6.125% a year, paid semi-annually from Aug 15 2026; due Feb 15 2031 — about ten years before the lease's 15-year base term ends. The pre-pricing deck's 7.0% coupon was 'for illustrative purposes'; the Q1-2026 10-Q rounds the rate to 6.13%
“The notes are senior secured obligations of Black Pearl Compute and bear interest at a rate of 6.125% per year payable semiannually in arrears on February 15 and August 15 of each year, beginning on August 15, 2026.”
Cipher Mining 8-K, Item 1.01 (filed 2026-02-11) · sec.gov - amortization7%principal comes back at 7.00% a year of the original $2.0B (≈ $140M a year, our arithmetic), semi-annually — but 'No amortization will be payable prior to the completion of all phases of construction' (the same Item 1.01), i.e. from the indenture's Final Commencement Date, the day the full rent for every phase begins to accrue. When that is, is contested (amortization-start)
“The principal amount of the notes will amortize on a semi-annual basis on February 15 and August 15 of each year in an initial amount equal to 7.00% per annum of the principal amount of the notes outstanding on the issue date, subject to adjustments as set forth in the Indenture.”
Cipher Mining 8-K, Item 1.01 (filed 2026-02-11) · sec.gov - use-of-proceeds$232.5Mfor the rest of the build, ~$232.5M back to Cipher for its earlier equity in Cipher Black Pearl ('~$233MM' in the Feb 24 deck), debt-service reserves (dsra) and fees. Black Pearl Compute LLC still held $849MM of cash at Sep 30 2026 (Nov 2 deck, furnished)
“Black Pearl Compute intends to use the net proceeds from the offering (1) to finance the remaining cost of the Black Pearl Facility, a high-performance computing data center in Wink, Texas (the “Black Pearl Facility”), (2) to reimburse Cipher approximately $232.5 million for its prior equity contributions to Cipher Black Pearl”
Cipher Mining 8-K, Item 1.01 (filed 2026-02-11) · sec.gov - completion-guaranteeCipher's promise to the noteholders: it will fund the build's timely completion if the notes' proceeds and other available funds fall short. Cap and duration undisclosed
“Cipher will provide a customary completion guarantee with respect to the Black Pearl Facility, under which it will fund the Issuer as necessary to ensure the timely completion of the Black Pearl Facility in the event that the proceeds of the Notes and the available funds (including prior equity contributions by Cipher relating to the Black Pearl Facility) are insufficient to do so.”
Cipher Mining 8-K, Item 1.01 (filed 2026-02-11) · sec.gov - dsra$236Ma debt-service reserve of $236.0M at issue — about the first interest payments — falling to $130.0M once construction is over (indenture)
“(1) on the Issue Date, $236.0 million (the “Issue Date Debt Service Reserve Required Amount”)”
Black Pearl Compute LLC indenture (8-K EX-4.1, filed 2026-02-11) · sec.gov - loan-to-cost85%~85% loan-to-cost at 6.125% for Black Pearl, beside ~71% at 7.125% for Barber Lake, the Fluidstack site Google backstops (fs-cipher-barber-lake) — one slide of Cipher's own. Furnished
“$2.0 Bn Issuance at Par 6.125 % Coupon 2031 Feb. Maturity Date ~85 % Loan -to-Cost”
Cipher Q4-2025 business update (8-K exhibit, furnished 2026-02-24) · investors.cipherdigital.com - book$13B'~$13.0 billion in initial book interest', ~6.5× the $2.0B offered — Cipher's account (the same on its Q4-2025 call); Bloomberg's people-familiar report of $13B of orders is most likely the same order book
“• Priced $2.0 billion high -yield bond issuance at 6.125% with ~$13.0 billion in initial book interest, implying ~6.5x+ oversubscription from investors”
Cipher Q4-2025 business update (8-K exhibit, furnished 2026-02-24) · investors.cipherdigital.com - fitch-ratingBB-, outlook stable — Fitch's rating of the notes (Feb 13 2026), below investment grade; among the things Fitch says could lead it to downgrade them is debt-service coverage sustained below 1.1×. Moody's Ba2 rests on Cipher's own debt table; no Moody's document is in the record
“USD 2 bln 6.125% bond/note 15-Feb-2031 09216NAA8 New Rating Long Term Rating BB-/Rating Outlook Stable”
Fitch Ratings, 'Fitch Rates Black Pearl Compute LLC Senior Secured Notes BB-' (2026-02-13) · assets.fitchratings.com - deck-illustrationCipher's illustrative model, in $M: debt outstanding at each year-end from 2026 to 2035, then 2040 and 2041 — $1,463M still owed at the end of 2030, weeks before the notes' Feb 15 2031 maturity, and paid down to zero only in 2041, as if the debt ran with the lease. No document in the record says how the balance due in 2031 is met. Illustrative, at a 7.0% coupon, furnished
“Ending 2,000 1,883 1,743 1,603 1,463 1,323 1,183 1,043 903 763 63 0”
Black Pearl Compute financing deck (8-K ex-99.1, furnished 2026-02-03), consolidated financial summary · sec.gov
Contested figures 13 not reconciled — every position side by side, with its source and tier
Scope note what this record leaves to other records
NOT this record (carried elsewhere or not carried): Stingray, Andrews TX — Cipher's second lease with Amazon Data Services (Mar 2026; 100 MW gross / 70 MW critical IT, ~$2.0B over 15 years, $810M 6.000% Stingray Compute notes due Jun 2031; ~$5.2B vs ~$5.7B with extensions across two Cipher decks) is its own deal, not yet a record; Cipher's portfolio totals ($9.3B → $11.4B → $16.6B contracted, $28.4B with extensions, 700 MW gross / 493 MW critical IT, 17.3-year WALT; average annualized NOI $669M → $787M → $793M → $843M → $864M on changing windows) and SAVRN's '~45%' AWS share of them → the cipher entity at most; Barber Lake and Google's $435M warrant floor → fs-cipher-barber-lake. Cipher's $200M corporate revolver (Mar 2026), whose minimum liquidity steps from $100M to $150M to $200M as Barber Lake and Black Pearl reach full commencement, and its convertible notes → parent-level, not carried. The site beyond the lease (256 adjacent acres bought by Nov 2026; a Winkler County abatement notice for 'potentially 1 GW' and '$3+ Billion' of improvements) is uncontracted → not carried. Site history (the 2023 purchase: $7.0M in 2,397,424 shares; ERCOT approval for 154 MW unconditional and 300 MW conditional; up to $6.3M of Oncor collateral returnable on energizing 135 MW by May 15 2026) → summarized in site-history only. Not adopted: everydatacenter's '~140 MW live now' (a fleet-ratio model; Cipher published 18 MW) and '~$8.0B' spend estimate (its own model, chips included); a drone-video commentator's '240 megawatts' for Phase 1 (no basis); Benzinga's 'cost-overrun reimbursements of more than $9.5 million … per megawatt of total spend' (the deck caps cost per IT MW) and its '$864 million' NOI recast as an analyst's 2027 run-rate; DeepEdge's 'average gross rent of c. $367m' (the deck's column is NOI); VanEck's '98%' loan-to-cost (Stingray, no derivation). Texas's data-center list (Comptroller, read 2026-11) lists Cipher Black Pearl LLC at the site and no Amazon entity there.