Why it matters
Chips absorb much of Stargate's spending and are its least disclosed cost. No Oracle or Nvidia filing ties the other to these chips, and the only reported price is the Financial Times' $40B, which one estimate halves. Oracle's delivery record includes 131,000 GPUs handed over in the three months to August 2026.
Tap a figure for the line in its source.
Oracle gives
Nvidia gives Oracle
- GB200 systems for the eight Abilene buildings: 'more than 450,000' GPUs in all by Ellison's count, about 400,000 by the FT's, a figure OpenAI repeats
What happened
The Abilene campus uses Nvidia's GB200 systems to serve OpenAI on Oracle's cloud. OpenAI says it trained GPT-5.5 there. Larry Ellison puts the finished campus's count at 'more than 450,000'. A May 2025 Financial Times report put it at about 400,000, which OpenAI later repeated. Oracle says it handed over 131,000 of them at Abilene in the three months to August 2026 alone. Neither Oracle nor Nvidia has filed what Oracle pays for the chips. The only reported price, about $40 billion, comes from the same Financial Times report. One research group estimates the same chips cost nearer $20 billion.
Sources 14 documents — 4 company releases · 3 transcripts · 3 press reports · 1 SEC filing · 1 other document · 1 research note · 1 social post
Research trail Found 384 documents and read 356 of them while checking this deal and related ones.
- States platform
- States oracle filing
- States delivered dec 2025
- States delivered Q1 fy27
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: OpenAI post (Apr 29 2026) + Korea blueprint (Oct 2025); Oracle e-book (Oct 2025), Q3 FY25 / Q2 FY26 / Q1 FY27 calls and FY2026 10-K; Crusoe release (Mar 2025); Bloomberg via Data Center Knowledge, the FT via Spyglass and DCD, Samaritan Research and Epoch AI for the contested cells (read 2026-10) · as of Sep 2026
The evidence 4 sourced figures · 2 disputes
The record's headline Oracle's Nvidia GB200s for Abilene: 'more than 450,000' GPUs by Ellison's count, ~400,000 by the FT's, which OpenAI repeats; 131,000 delivered in Jun–Aug 2026 alone — no filing by either company ties the other to these chips or gives a price
- Size
- GPU count 400,000–450,000+ (the FT's figure, which OpenAI repeats, vs Ellison's) · price undisclosed (FT: ~$40B)
- When
- Mar 2025 (first reported: 64,000 by end-2026) → May 2025 (FT: ~$40B for ~400,000) → Oct 2025 ('more than 450,000', Ellison) → Jun–Aug 2026 (131,000 delivered)
- Status
- six of eight buildings delivered (Sep 2026); 131,000 GPUs handed over in Oracle's Q1 FY2027
- Structure
- the GPU systems run on Oracle Cloud Infrastructure inside buildings Oracle leases from the Crusoe–Blue Owl venture (sg-crusoe-jv), and Oracle sells their computing to OpenAI (sg-oai-orcl). That Oracle buys them from Nvidia is the FT's report ('lease the computing power to OpenAI'); no purchase agreement, price or delivery schedule between the two is disclosed
- Programme
- Stargate
- Parties
- Oracle operator of the GPUs on its cloud; their buyer, by the FT's report · Nvidia maker of the GB200 systems · OpenAI the customer the GPUs are delivered to — it trains and serves its models on them
- Site
- Stargate Abilene
- Record
- disclosed / primary source · as of Sep 2026
Flows 2 as the record states them
- Oracle → Nvidiachip-purchasesundisclosed — ~$40B for ~400,000 GB200s by the FT's May 2025 report, ~$20B by Samaritan Research's per-GPU arithmetic; no Oracle or Nvidia filing ties the other to these chips
- Nvidia → OraclegpusGB200 systems for the eight Abilene buildings: 'more than 450,000' GPUs (Ellison) vs ~400,000 (OpenAI, citing the FT)
Resolved figures 4 each with the verbatim line from its document
- platformOpenAI's own description of its flagship: the Abilene site 'operates on Oracle Cloud Infrastructure and runs NVIDIA GB200 systems', and trained GPT-5.5 (Apr 29 2026). OpenAI buys the computing from Oracle (sg-oai-orcl); neither company says who owns the hardware — the FT reported that Oracle buys it
“Our latest and smartest model yet, GPT‑5.5, was trained at our flagship Stargate site in Abilene, Texas. The site operates on Oracle Cloud Infrastructure and runs NVIDIA GB200 systems.”
OpenAI, 'Building the compute infrastructure for the Intelligence Age' (Apr 29 2026) · openai.com - delivered-dec-2025more than 96,000more than 96,000 GB200s delivered at Abilene by Dec 10 2025, by Oracle's own account on its Q2 FY2026 call — a running total, in Motley Fool's transcript (the only one on file)
“Our super cluster in Abilene, Texas is on track more than 96,000 NVIDIA Grace Blackwell GB 200 delivered.”
Oracle Q2 FY2026 earnings call (Motley Fool transcript, Dec 10 2025) · fool.com - delivered-q1-fy27131,000131,000 GPUs delivered at Abilene in Oracle's Q1 FY2027 (Jun–Aug 2026), '1.9 times the volume delivered in Q4' — so roughly 69,000 in Mar–May 2026, by our division. Deliveries in a quarter, not an installed total: there is no figure on file for Dec 2025–Feb 2026, so the quarters cannot be summed into a campus count. The same call: six of the eight buildings, 618 MW, delivered to the customer (sg-oai-orcl)
“We delivered 131,000 GPUs there in Q1, 1.9 times the volume delivered in Q4.”
Oracle Q1 FY2027 earnings call (StockAnalysis transcript, Sep 10 2026) · stockanalysis.com - oracle-filingwhat Oracle's filings say about its GPU supply: the FY2026 10-K, that it 'at times' accepts 'less favorable terms with suppliers to minimize supply constraints', naming no supplier; its furnished Dec 2025 earnings release, Ellison saying Oracle will keep buying NVIDIA's latest GPUs, with no site, volume or price. The 10-K never names Nvidia, and Nvidia's Q2 FY2027 10-Q never names Oracle (in the text on file), so neither side files this purchase, its price or its volume. Oracle's filings also name NVIDIA as one of its cloud customers, in its Mar and Dec 2025 earnings releases and its Feb 2026 funding plan (all three cited on sg-oai-orcl: oracle-filings, rpo-q2-fy26, funding-2026)
“For example, industry supply capacity for AI accelerators, including graphics processing units, as well as memory devices, is competitive, and we at times have to accept less favorable terms with suppliers to minimize supply constraints.”
Oracle FY2026 10-K (risk factors) · sec.gov
Contested figures 6 not reconciled — every position side by side, with its source and tier
Scope note what this record leaves to other records
Not this record: the buildings and their owners (sg-crusoe-jv); Oracle's contract with OpenAI, its backlog, capex and the campus's delivered megawatts (sg-oai-orcl); Epoch's estimates of the site's compute and capital cost today (the abilene entity); Oracle's company-wide deliveries ('850 megawatts of AI capacity containing more than 300,000 GPUs' in Q1 FY27, all sites) and its AMD MI355 capacity, which no source places at Abilene. Not counted: Samaritan's estimate that Oracle bought 7–8% of Nvidia's AI chips in 2025 (a model of Oracle-wide purchases, not this campus). Not adopted: 'Oracle is spending $40 billion on purchasing NVIDIA's high-end GPUs' (the Public Enterprise report 'Bubble or Nothing', Nov 2025 — a reported plan restated as a fact). Dropped from the previous version: the datacenterfrontier.com page cited for the $40B, which does not state it, and a thesis about TSMC packaging that no source on this record supports.