Why it matters
Neither OpenAI nor Oracle owns Stargate's flagship, which a separate venture funded mostly with JPMorgan-led bank debt is building. OpenAI pays Oracle for compute, and Oracle pays the venture rent that goes toward repaying the banks. The filed 15-year rents cover only the first two buildings.
Tap a figure for the line in its source.
Crusoe gives
Blue Owl gives Crusoe
- joint venture, with Primary Digital, for the whole campus, construction loans included; no party says how much is Blue Owl's own money
Lenders & bondholders gives Crusoe
- disputedof construction loans to the venture, $2.3B and $7.1B, led by JPMorgan; the lender and Blue Owl's lawyers give different totals
Oracle gives Crusoe
- base rent per data hall in the first lease year, plus $297K per building's network core, rising 3% a year — filed for the first two buildings only
What happened
Neither OpenAI nor Oracle owns the Abilene campus. A joint venture is building it on land leased from Lancium. The partners are the developer Crusoe, funds managed by Blue Owl and the investor Primary Digital. Oracle rents all eight buildings and sells computing capacity to OpenAI. Blue Owl's investment vehicle owns 92.3% of the first two buildings, and Crusoe owns 7.7%. Of the venture's $15 billion, about $9.4–9.6 billion comes from two construction loans led by JPMorgan. Oracle rents the first two for 15 years at rents disclosed in a Blue Owl filing. OpenAI pays Oracle, which pays the venture. The venture pays its banks.
Sources 23 documents — 8 company releases · 6 other documents · 4 SEC filings · 3 law-firm notes · 1 press report · 1 research note
Research trail Found 642 documents and read 587 of them while checking this deal and related ones.
- States 6 figures: 92.3% phase1 ownership · lease term · $2,475,000 rent phase1 · $35,000,000 land · $926,846,823 phase1 equity · up to $2,288,000,000 loan phase1
- States $15B JV size
- States $3.4B phase1 JV
- States 1.2 GW campus
- States buildings
- States tenant
- States $7.1B loan phase2
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Paul Hastings: Paul hastings advised Crusoe energy systems LLC on usd3 4b joint venture for AI data…Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: Abilene DC 1, LLC audited 2025 statements + Blue Owl Real Estate Net Lease Trust 10-Q (Sep 2025); Crusoe, Newmark, JPMorgan, Kirkland, Paul Hastings and Husch Blackwell releases; Primary Digital via New Era's 8-K exhibit; Oracle's Abilene page; DCOA and Lancium for the cost scopes; WSJ, DCD, Quinn Emanuel and Epoch AI for the contested cells (read 2026-10) · as of Sep 2026
The evidence 12 sourced figures · 3 disputes
The record's headline Abilene's owners: Crusoe and Blue Owl's $15B venture builds the eight-building, 1.2 campus on $9.4–9.6B of JPMorgan-led loans and leases it all to Oracle — the first two buildings for 15 years, at rents filed with the SEC
- Size
- $15B joint venture (both phases) · $9.4–9.6B of construction loans · 8 buildings, 1.2 GW
- When
- Oct 15 2024 ($3.4B first phase) → Jan 2025 ($2.3B loan) → Mar 2025 (six more buildings begun) → May 2025 ($15B, $7.1B loan) → Mar–Jul 2025 (rent starts, buildings 1–2) → Sep 2026 (six of eight delivered)
- Status
- first two buildings paying rent since Mar 18 and Jul 1 2025; six of eight delivered to Oracle's customer by Sep 2026 (sg-oai-orcl); construction loans due 2028
- Structure
- joint ventures of Crusoe affiliates and Blue Owl-managed vehicles — Longhorn JV for buildings 1–2 ('Oracle 1-2 JV'), then 'Oracle 3-4 JV' and 'Oracle 5-8 JV' — each owning property companies (Abilene DC 1, LLC and on) that borrow the construction loans and lease the buildings, built to suit, to Oracle America; Primary Digital co-sponsors (no filing gives its share); the land is ground-leased from Lancium; Crusoe designs, builds and operates
- Programme
- Stargate
- Parties
- Crusoe developer, builder and operator; 7.7% of the first phase's venture (Crusoe Abilene, LLC); stands for the venture in the terms above · Blue Owl majority owner through managed vehicles — 92.3% of the first phase's venture (BOREC Longhorn Member, LLC); with Primary Digital, the equity sponsor · Oracle tenant of all eight buildings (Oracle America, Inc.), built to suit · Lenders & bondholders construction lenders to the venture, led by JPMorgan
- Site
- Stargate Abilene
- Record
- disclosed / primary source · as of Sep 2026
Flows 3 as the record states them
- Blue Owl → Crusoejvthe equity side of the $15B venture, with Primary Digital and Crusoe — no party gives Blue Owl's amount; the first phase's property company had $926.8M of equity contributions by Dec 31 2025 (its owner 92.3% Blue Owl's vehicle, 7.7% Crusoe's)
- Oracle → Crusoelease-paymentsrent to the venture, filed for buildings 1–2 only: $2,475,000 per data hall and $297,000 per building's network core in the first lease year, +3% a year, 15 years from Mar 18 / Jul 1 2025; the other six buildings' rent is undisclosed
- Crusoe → Oraclecapacityeight buildings, 32 data halls, 1.2 GW of campus power, leased whole; six delivered by Sep 2026 (618 MW, sg-oai-orcl)
Resolved figures 12 each with the verbatim line from its document
- jv-size$15B$15B — the joint venture's announced size for the whole campus, both phases, construction loans included (May 21 2025, at the second phase's financial close). Every party to the deal restates it — Kirkland for Blue Owl, Husch Blackwell for Crusoe, Newmark, Primary Digital — so it is one figure, repeated, and no document shows it fully raised (contested capital-raised). Its scope is the buildings and power the venture owns; the GPUs inside are run by Oracle (sg-orcl-nvda)
“Crusoe, a vertically-integrated AI infrastructure company, Blue Owl Capital Inc. (“Blue Owl”), a leading alternative asset manager, and Primary Digital Infrastructure, an advisory and data center investment platform, announced today the second phase of a $15 billion joint-venture to fund the 1.2 gigawatt AI data center in Abilene, Texas.”
Crusoe/Blue Owl/Primary Digital release (May 21 2025) · crusoe.ai - phase1-jv$3.4B$3.4B, Oct 15 2024: the first phase — two buildings, 206 MW, 998,000 sq ft — which funds managed by Blue Owl's real-estate platform and Primary Digital 'will jointly sponsor' under 'the fully funded forward takeout', designed, built and operated by Crusoe and '100% long-term leased to a Fortune 100 hyperscale tenant with occupancy expected to begin in 1H 2025'. The release does not name the tenant (see tenant)
“announced today a $3.4 billion joint-venture to fund purpose-built data center capacity at the previously announced Lancium Clean Campus in Abilene, Texas.”
Crusoe/Blue Owl/Primary Digital release (Oct 15 2024) · crusoe.ai - campus1.2 GWthe campus as the developer sized it when the second phase began (Mar 18 2025): six more buildings, eight in all, about 4 million sq ft and 1.2 GW of total power capacity — power, not IT load. Kirkland, for Blue Owl: 32 data halls and 300 MW of on-site generation. Completion has since moved from mid-2026 to 'by the end of 2026' (sg-oai-orcl abilene-completion)
“The second phase of construction, expected to be completed in mid-2026, includes six additional buildings, bringing the total facility to eight buildings, approximately 4 million square feet, and a total power capacity of 1.2 gigawatts (GW).”
Crusoe release (Mar 18 2025) · crusoe.ai - buildings8eight buildings — two in the first phase, six in the second — on 1,100 acres and about 4 million sq ft, in the tenant's own description. Later counts of ten add Microsoft's two buildings on Crusoe's adjacent campus, which is not this venture's (note)
“The campus consists of eight buildings on 1,100 acres, encompassing 4 million square feet of building space.”
Oracle, Abilene data-center page · oracle.com - phase1-ownership92.3%the first phase's owners, filed: Abilene DC 1, LLC — which owns buildings 1 and 2 and their power station — is wholly owned by Longhorn JV, LLC, in which BOREC Longhorn Member, LLC, a vehicle of Blue Owl-managed funds, holds 92.3% after buying 92.26% of Crusoe's interest on Oct 11 2024, and Crusoe Abilene, LLC 7.7%. No filing gives Primary Digital a share
“Crusoe Abilene LLC and BOREC Longhorn Member LLC hold a 7.7% and 92.3% interest, respectively, in Longhorn JV.”
Abilene DC 1, LLC audited 2025 statements (ex. 99.3 to Blue Owl Real Estate Net Lease Trust's FY2025 10-K) · sec.gov - tenantthe tenant, named in a filing: Blue Owl Real Estate Net Lease Trust's Q2 and Q3 2025 10-Qs describe Longhorn JV ('Oracle 1-2 JV') as funding 'a two-building data center leased to Oracle America, Inc.', and two later ventures, 'Oracle 3-4 JV' and 'Oracle 5-8 JV', formed with Crusoe affiliates for the six other buildings; the trust's 2026 10-Qs name none of the ventures. The trust's own stakes: 48% of the Blue Owl vehicle that holds 92.3% of buildings 1–2; for buildings 3–8, indirect interests of 9.1% (3–4) and 92.5% (5–8) bought on May 16 2025, part of the second then sold to other Blue Owl vehicles — by Sep 30 2025 it held 9.1% and 21.2% of the two Blue Owl aggregators, each owning a weighted-average 90.7% of its venture. The venture's announcements leave the tenant unnamed ('a Fortune 100 hyperscale tenant', Crusoe, Oct 2024), and Crusoe's Sep 2025 release, which has the campus running 'on Oracle Cloud Infrastructure' as 'part of a long-term collaboration with Oracle', never calls Oracle the tenant; the Abilene development corporation names 'Fortune 100 tenant Oracle'
“Oracle 3-4 JV and Oracle 5-8 JV were formed as joint ventures with affiliates of Crusoe Abilene, LLC to facilitate the development of six additional data center buildings leased to Oracle America, Inc. in build-to-suit arrangements.”
Blue Owl Real Estate Net Lease Trust 10-Q (quarter ended Sep 30 2025) · sec.gov - lease-termthe first two buildings' lease, filed: the whole property to a single tenant (executed Oct 11 2024), rent from Mar 18 2025 for building 1 and Jul 1 2025 for building 2, each for 15 years from its start; both buildings 'substantially completed and delivered to the tenant' in 2025, the power station still under development at Dec 31 2025. No filed term for buildings 3–8: DCD reports that 'Oracle has agreed to lease the site for 15 years'
“On March 18, 2025 and July 1, 2025, rent commenced for building 1 and building 2, respectively. The lease term is 15 years from the rent commencement date.”
Abilene DC 1, LLC audited 2025 statements (Blue Owl Real Estate Net Lease Trust FY2025 10-K, ex. 99.3) · sec.gov - rent-phase1$2,475,000the filed rent, buildings 1–2 only: $2,475,000 per data hall and $297,000 per building's network core as base rent for the first lease year, under a sentence that says 'monthly rent includes base rent and additional rent', rising 3% a year; additional rent passes through operating costs, taxes, insurance and the ground rent. Each building has four data halls. Read as monthly, the first year's base rent for the two buildings is about $245M — our multiplication (8 × $2.475M + 2 × $0.297M ≈ $20.4M, × 12), on a reading the note implies but does not spell out. The other six buildings' rent is in no document
“Base rent for the first lease year is $2,475,000 per data hall and $297,000 for the network core of each building.”
Abilene DC 1, LLC audited 2025 statements (Blue Owl Real Estate Net Lease Trust FY2025 10-K, ex. 99.3) · sec.gov - land$35,000,000the land is Lancium's: ground-leased from May 31 2024 for an initial 20 years with up to five 15-year extensions and an option to buy it for $1 after May 31 2039, at $200,000 a month during construction, plus a one-time $35M payment (Oct 11 2024) tied to the site's power. 'While the Investment is leased to a tenant, the tenant will be responsible for making monthly payments for power directly to Lancium' — so Oracle pays the landowner for power, not the venture
“In this amendment, the Company agreed to make a one-time payment of $35,000,000 associated with the land covered by the ground lease and upon which the Investment is being constructed.”
Abilene DC 1, LLC audited 2025 statements (Blue Owl Real Estate Net Lease Trust FY2025 10-K, ex. 99.3) · sec.gov - phase1-equity$926,846,823the first phase's equity, filed: $926.8M contributed to Abilene DC 1 by Dec 31 2025, against $303.6M already distributed to its owner — the only filed total of equity for any part of the venture; the later buildings' total is undisclosed (Blue Owl's trust files only its own checks, e.g. $361.6M for its May 2025 stake in buildings 5–8; tenant)
“As of December 31, 2025 and 2024, the Company has total equity contributions of $926,846,823 and $868,453,049, respectively.”
Abilene DC 1, LLC audited 2025 statements (Blue Owl Real Estate Net Lease Trust FY2025 10-K, ex. 99.3) · sec.gov - loan-phase1up to $2,288,000,000the first phase's construction loan: up to $2,288,000,000 under the executed agreement — Newmark's '$2.3 billion' (Jan 22 2025) — interest-only at Term SOFR + 2.5%, all due in 2028, most of it swapped to a fixed 3.98%. The swap's notional accretes to $2,498,000,000 by Apr 9 2026, above the stated cap — which bears on the two-loan totals (contested construction-debt)
“Based on the executed loan agreement, the Company can borrow up to $2,288,000,000.”
Abilene DC 1, LLC audited 2025 statements (Blue Owl Real Estate Net Lease Trust FY2025 10-K, ex. 99.3) · sec.gov - loan-phase2$7.1Bthe second phase's construction loan: $7.1B for Blue Owl, Crusoe and Primary Digital, 'provided by a consortium led by J.P. Morgan', funding the six later buildings (May 22 2025). Pieces of it have been sold on: a bond fund's filed holdings (Bridge Builder Core Plus, Jun 30 2026) list term loans to Abilene DC 4, 5 and 7, LLC at Term SOFR + 2.25%, due Jun 9 2028, and PIMCO's Mar 2026 N-PORT, read for this record, not cited here, lists 'Project Flash' loans to Abilene DC 3 through 8
“announces the company arranged a $7.1 billion construction loan for Blue Owl Capital, Inc., Crusoe and Primary Digital Infrastructure.”
Newmark release (May 22 2025) · prnewswire.com
Contested figures 8 not reconciled — every position side by side, with its source and tier
Scope note what this record leaves to other records
Not this venture: Crusoe's adjacent 900 MW campus for Microsoft (Mar 27 2026: two buildings of 336 MW critical IT and an on-site power plant; four Texas building registrations at $6.3B each, additive or not) — no document on file names its owners or lenders; now its own record (crusoe-msft-abilene), and the capacity at the centre of sg-oai-orcl's abilene-expansion. Also not carried here: the on-site gas plant (300 MW in Kirkland's and Newmark's releases, about 360 MW as permitted, 350 MW in Crusoe's) and Crusoe's air-permit application for a further 1,330 MW of turbines on the same site, which TCEQ's modeling audit assigns to Buildings 9 and 10 next door (crusoe-msft-abilene), not to this campus; jobs (57 full-time by the city's count vs 400 direct by DCOA vs 1,000 or 1,700 by Oracle); Abilene's property-tax shares (32% city / 25% county in Crusoe's release vs the reverse in its impact report). Routed: the campus's delivered capacity and Oracle's contract (sg-oai-orcl); the GPUs (sg-orcl-nvda). Not adopted: 'Oracle's data center servicing OpenAI has $15 billion in debt and equity from the likes of Crusoe (the site owner and developer), Blue Owl Capital, and JP Morgan' (the Public Enterprise report 'Bubble or Nothing') — the JV's size read as money raised, with the lender counted as an investor. Corrected from the previous version: '$11.6B debt+equity closed 5/2025' (the $11.6B is Primary Digital's Jan-2026 floor; May 2025 is when the $15B venture's second phase closed) and 'the first Stargate project financing' (no document on file says so).