data-center developer

Fermi America

A Texas company, listed in New York and London, that is developing Project Matador: a campus in the Texas Panhandle, on land leased from the Texas Tech University System, meant to make its own electricity, from gas turbines first and nuclear reactors later, and to rent data centers to AI companies. It had earned no revenue by the end of September 2026. Its first tenant lease, with the AMD-based cloud TensorWave, was terminated in November 2026 before it ever took effect.

2 deals (2 T1) · 1 flow on the money map ·

Where it standsfrom Fermi America’s 10-Q for the quarter to Sep 30, 2026

Market cap
$1.25B
at the Nov 20, 2026 close
P/Eworked out
Loss-making
net loss of $489M over the last 12 months
Operating loss
$142M
latest quarter
Net loss
$142M
latest quarter
Capexworked out
$133M
latest quarter · $1.23B over the last 12 months
Free cash flowworked out
−$1.37B
last 12 months: −$136M from operations, less $1.23B capex
Cash
$286M
Debt
$958M

Deals 2

sort: · · ·
  1. Aug 10, 2026
  2. Sep 25, 2025

Money in and out 1 ribbon

Who pays Fermi America (left), and whom it pays (right). Width is a rough size in $B, per year for multi-year deals.

← swipe to see the whole chart →

sourced deal · 1 of 1

As a table · 1 ribbon
Timeline 4 dated entries
  1. Nov 2026TensorWave lease terminated Nov 10 'in accordance with its terms' after the Oct 31 closing date passed without extension — never effective, no effect on the financial statements (T1 Q3 10-Q); AMD's credit support terminated with it (T2 release) — fermi-tensorwave · the same day, a non-binding letter of intent with an unnamed investment-grade hyperscaler for about 600 MW of powered land, beside a $200M prepayment agreement and a $15M early construction agreement — not a record here (T1 Q3 10-Q)
  2. Oct 2026Announces that AMD has signed a credit support agreement behind TensorWave's 222 MW lease, and a framework with Fermi for expansion to 650 MW (Oct 13, T2 release) · the lease amended and restated Oct 9 so the Oct 31 closing could be extended to Dec 31 (T1 Q3 10-Q) — fermi-tensorwave · MUFG's turbine financing drops its 400 MW lease covenant for $25M of amendment fees — not a record here (T1 8-K, Oct 16)
  3. Sep 2026First Amendment to the TensorWave lease: closing moved from Sep 30 to Oct 31 while the rent guaranty is negotiated (T2 release, Sep 22) — fermi-tensorwave
  4. Aug 2026TensorWave lease signed Aug 9: 222 MW of total facility power, 15 years from the last phase, ~$6.5B of contracted revenue by Fermi's estimate, effective only once Board approvals and project-level financing are in place (T1 Q2 10-Q) — fermi-tensorwave

Timeline entries carry no source field yet; some name one inline.

Notes in the record on Fermi America

Fermi Inc. (Nasdaq and London Stock Exchange: FRMI; CIK 2071778), 'operating as Fermi America'; formed as Fermi LLC on January 10, 2025, converted to a Texas corporation on September 30, 2025 for its IPO; 'We were formed in January 2025 and have not generated revenue to date' (Q3 2026 10-Q, filed Nov 12 2026). It plans to 'develop and lease private-grid powered data center space', supplied by 'on-site natural gas-fired generation', grid power, batteries, solar and 'longer-term nuclear baseload supply' (the same filing). Project Matador: 'a 5,236-acre site held or to be held under a long-term ground lease with the Texas Tech University System' designed for 'up to 11 gigawatts' of mostly private generation, 'expandable up to approximately 17 ' with optioned land and further TCEQ air permits — plans, not built capacity. The TTU lease requires a notice to proceed by December 31, 2026 before vertical construction, conditioned on 'our execution of a lease with a Phase 1 tenant for not less than 200 of capacity, which condition has not been satisfied' (Q3 10-Q) — the condition the TensorWave lease was signed to meet (fermi-tensorwave). Not records here: the non-binding letter of intent of November 10, 2026 with an unnamed investment-grade hyperscaler 'for the delivery of approximately 600 megawatts (“MW”) of powered land', beside a $200 million prepayment agreement and a $15 million early construction and site development agreement, with a ~$90 million steel sale being finalized (Q3 10-Q); the Hillcore power framework, the nuclear plan, the 2025 'First Tenant' advance agreement and Fermi's debt other than its two turbine-warehouse loans, none carried here. Its Siemens Energy turbines and the MUFG and Beal Bank USA loans behind them — including MUFG's Amendment No. 1 (Oct 9 2026), which removed the requirement of 'a lease or arrangement for 400 MW on the Project Matador site by November 10, 2026' for 'amendment fees totaling $25 million' (8-K, Oct 16 2026) — are fermi-siemens-energy.