MS Fairwater (Atlanta)
Microsoft's second 'Fairwater' AI data center, in Fayetteville near Atlanta, Georgia: by Microsoft's account the same design as the Wisconsin original — Nvidia GB200 racks, on a dedicated network linking the two — and running since October 2025, months before Wisconsin's first facility. Unlike Wisconsin it is not Microsoft's own build: Epoch AI says QTS built it with Microsoft as the tenant, and no Microsoft statement in the record gives a dollar figure or the site's power.
1 deal (1 T1) · 0 flows on the money map ·
Deals 1
A site is not a party to its deals; these are the records that cover it.
- Mar 27, 2023 updated Nov 20
Money in and out 0 ribbons
No money ribbon touches MS Fairwater (Atlanta) on the map.
In figures 3
Notes in the record on MS Fairwater (Atlanta)
Builder and owner: QTS — Epoch: 'Built by QTS with Microsoft as the tenant' (directory updated Oct 5 2026), and the financing analyses describe a QTS project company set up 'to own and operate two newly constructed hyperscale data centre buildings' leased to Microsoft (AFII). QTS has no entity here, and that financing is a deal of its own. Microsoft's own account (ms-fairwater fairwater-atlanta): 'the second in Microsoft's Fairwater family', which began operation in October 2025, with NVIDIA GB200 NVL72 rack-scale systems — and no dollar figure or site-wide . Users: OpenAI and Microsoft — Epoch: 'likely used by OpenAI and Microsoft'; Microsoft says its AI datacenters power OpenAI, Microsoft AI, Copilot and other AI workloads, and that the Fairwater sites its network links will work together to support them. The h100e, mw and capexB are Epoch's model, not disclosures: two buildings and 321 MW of IT power from Oct 2025, four and 636 MW from Jun 2026.