Colossus 2
The second, much larger Memphis-and-Southaven site, filled with Nvidia's newest Blackwell chips and financed partly through an unusual vehicle (Valor ) that owns the GPUs and leases them back. SpaceX trains its own Grok models here and, since mid-2026, rents slices of it out by the month: Anthropic's lease spans both Colossus sites and, by Reflection AI's own account, Reflection AI's is here, while Google's ~110,000-GPU lease is not tied to a site by any source.
2 deals (1 T1 · 1 T2) · 0 flows on the money map ·
Deals 2
A site is not a party to its deals; these are the records that cover it.
- Jun 22, 2026 updated Nov 18
- May 6, 2026 updated Nov 21
Money in and out 0 ribbons
No money ribbon touches Colossus 2 on the map.
In figures 3
Notes in the record on Colossus 2
Owner SpaceXAI, users 'Anthropic, Cursor, and SpaceXAI' per Epoch (Aug 16 2026) — the leases, not an error (the earlier 'Epoch Users field … suspect' note is retired). Leased slices: Anthropic ('across COLOSSUS and COLOSSUS II', S-1); Google ~110,000 GPUs from Oct 2026, site not stated (FWP Jun 5); Reflection GB300 (press, Jun 22); Cursor (compute agreement Apr 2026, then acquired Aug 14 2026). SpaceX's own use: 'Grok-5, which is currently being trained at COLOSSUS II' (424B4). Build-out as filed: cluster 1 ~110,000 GB200 / ~210 in 91 days; cluster 2 110,000 GB300 / 220 MW in 64 days; next phase 'at least 220,000 additional GB300 processors and over 400 additional megawatts' — Epoch reproduces these from the S-1, so only its imagery-derived 946 MW / $35.8B are independent. Construction cost: SpaceX's confidential Draft No.1 (Mar 30 2026) stated '$2.7 million per megawatt for the first two clusters of MACROHARD compared to an industry benchmark of approximately $12.3 million per megawatt' — construction only, excludes compute hardware; DELETED from Draft No.2 and every public filing, which keep only 'considerably lower than industry benchmarks' (tier 1 for what the draft said; never a current filing claim; url on the spacex entity). Capacity dispute across the sources: Musk 'first gigawatt training cluster' (Jan 19 2026) vs Epoch ~350 MW of cooling the same day; 1,200 MW permitted (41 turbines, MS PSD permit, Mar 2026); NAACP/SELC complaint pleads 27 unpermitted Southaven turbines, ~580 tpy CO potential-to-emit (allegation only). Company-wide nameplate compute draw 1.4 at Jun 30 2026 (10-Q), 'over 2 gigawatts' guided for year-end.