CoreWeave Denton
A data-center campus in Denton, Texas, that Core Scientific built on land it leases from the City of Denton and licenses whole to CoreWeave: 262 , the largest of the five Core Scientific sites CoreWeave rents. The chips inside are CoreWeave's; a lender to CoreWeave and the Wall Street Journal say they are meant for OpenAI, and Core Scientific's chief executive, citing public statements, has said OpenAI is working with CoreWeave there — though no Core Scientific filing says so.
1 deal (1 T1) · 0 flows on the money map ·
Deals 1
A site is not a party to its deals; these are the records that cover it.
- Mar 6, 2024 updated Nov 21
Money in and out 0 ribbons
No money ribbon touches CoreWeave Denton on the map.
In figures 3
Notes in the record on CoreWeave Denton
Owner: Core Scientific (Core Scientific Denton LLC), which built eight buildings, A–H, on City of Denton land; the ground lease's own term runs to Dec 31 2035, extendable only with the City's power contract, though Core Scientific books it at 25 years, and the buildings pass to the City when it ends (cw-corz-colocation: ground-lease-term, buildings-revert). License: 262 of critical IT to a CoreWeave affiliate under the Amended and Restated Denton license, billing since 2025; Denton North's license and orders were assigned to CoreWeave's CW in H1 2026 (cw-corz-colocation: cw-spv-sites). Grid power 394 MW in most of Core Scientific's counts, 391 MW in its FY2024 10-K, less in its September ERCOT update (contested). Tenant: OpenAI by Epoch ('(likely)'), Société Générale, the WSJ and Core Scientific's own CEO, relaying public statements on a call ('OpenAI is working with CoreWeave in Denton') — and, on our reading, CoreWeave's DDTL 3.0 credit agreement for OpenAI's 'Phoenix 1' order, which pays rent under the license name the offering memo gives Denton's; no Core Scientific filing ties OpenAI to the site. The h100e, mw and capexB here are Epoch's model of the site, not disclosures; its 262 MW is the license allocation.