Meta Prometheus

Meta's first gigawatt-scale data center, in New Albany, Ohio — racing, Meta said in 2025, to be the first 1 + AI cluster online, with its own on-site gas turbines while the nuclear deals mature.

1 deal (1 T1) · 0 flows on the money map ·

Deals 1

sort: · · ·

A site is not a party to its deals; these are the records that cover it.

  1. Jan 9, 2026 updated Nov 21

Money in and out 0 ribbons

No money ribbon touches Meta Prometheus on the map.

In figures 3

536,343
H100-equivalents at the site · range 357,562–804,515
471 MW
power · range 336–659
$17.8B
capex · range $11.2B–$28.5B
Notes in the record on Meta Prometheus

Meta's target: >1 online 2026 ('the first 1GW+ cluster'); Epoch projects 27 buildings, 1,022 of IT power and $38.7B by Jul 2028, the last row of its timeline as fetched 2026-11-02 (through the 2026-09 pull its projected build-state was 854 MW / $32.4B). Onsite gas: Williams Socrates 2×200 MW (Blackstone $5.34B / 49%); nuclear layer is pw-meta-6gw