data-center site

MS Fairwater (Wisconsin)

Microsoft's first 'Fairwater' AI data center, on land in Mount Pleasant, Wisconsin that it bought from the village in 2023 and builds on with its own money: one cluster of Nvidia GB200 servers, whose equipment came online in April 2026 by Microsoft's account and which it declared fully operational in June, with a second facility of similar size that Microsoft schedules for 2028 and two more campuses proposed. Microsoft says its AI datacenters power OpenAI, Microsoft AI, Copilot and other AI workloads, and that the Fairwater sites its network links will work together to support them.

1 deal (1 T1) · 0 flows on the money map ·

Deals 1

sort: · · ·

A site is not a party to its deals; these are the records that cover it.

  1. Mar 27, 2023 updated Nov 20

Money in and out 0 ribbons

No money ribbon touches MS Fairwater (Wisconsin) on the map.

In figures 3

445,680
H100-equivalents at the site · range 297,120–668,519
369 MW
power · range 264–517
$14B
capex · range $8.7B–$22.4B
Notes in the record on MS Fairwater (Wisconsin)

Owner, builder and operator: Microsoft — the Village sold it the first 315 acres for $50,085,000 in 2023, and a contractor's page lists 'Owner Microsoft Corporation' for the second facility, MKE 16/17, which Microsoft's Sep 2024 air-permit application puts 'directly west of, and adjacent to' the first (ms-fairwater). Microsoft declared the first facility fully operational on Jun 23 2026 and schedules the second for 2028; site plans for two more campuses were approved in Jan 2026 — Durand Avenue (nine data centers; an amendment to seven larger ones passed the Plan Commission in Oct 2026, the Village Board's vote to follow) and International Drive (six). Power: served by We Energies; Microsoft pledges to match its fossil-fuel use with carbon-free capacity it has contracted to be built on the grid (1.45 in Wisconsin, the 250 Portage solar project among it) — matching, not supply. Users: OpenAI alongside Microsoft AI, Copilot and other AI workloads by Microsoft's account of its AI datacenters, OpenAI ('our latest AI campus with Microsoft') by OpenAI's, OpenAI and Microsoft 'likely' by Epoch's, 'fully dedicated to OpenAI' by SemiAnalysis's (ms-fairwater who-uses-it). The h100e, mw and capexB are Epoch's model of the operating first facility (directory updated Jul 25 2026), not disclosures: beyond its pledges ('more than $7 billion'), a $4.7B local-construction estimate and partial tallies of its spending (ms-fairwater reported-spend), no Microsoft statement on file gives a total cost, chip count or measured load for the site; the power figures it has given for the site's needs and scale are a spokesperson's 450 MW (WPR), a 400 MW maximum for Phase 1 and needs that 'might be 900 megawatts' in a few years (FOX6), and Nadella's 'scale to two gigawatts alone' — beside a firm load for its southeast Wisconsin facilities in its agreements with the utility, and equipment ratings in its permit filings (the first facility's on-site substation, the campus's emergency generators), which measure no load (ms-fairwater note).