data-center site

Colossus 1

The first Memphis data center xAI built for itself — the site that proved a lab could stand up its own compute at speed instead of renting from a cloud — and since May 2026 rented out whole. SpaceX, which absorbed xAI, leases all of its capacity to Anthropic by the month.

1 deal (1 T1) · 0 flows on the money map ·

Deals 1

sort: · · ·

A site is not a party to its deals; these are the records that cover it.

  1. May 6, 2026 updated Nov 21

Money in and out 0 ribbons

No money ribbon touches Colossus 1 on the map.

In figures 3

275,796
H100-equivalents at the site · range 183,864–413,694
340 MW
power · range 243–476
$12.9B
capex · range $8B–$20.6B
Notes in the record on Colossus 1

Owner SpaceXAI, user Anthropic per Epoch (Aug 16 2026): 'In May 2026, Anthropic signed an agreement with SpaceX to use all of Colossus 1's compute capacity.' Both parties said >220,000 GPUs / >300 on May 6 (see spacex-anthropic-colossus). S-1: first cluster ~100,000 H100 / ~130 MW online in 122 days in a repurposed factory shell. Power stack disputed across the sources (300 MW site vs ~240 MW on-site turbines vs 150 MW grid — different components, never split by any source).