Why it matters
The tenant's side owned 49.9% of its landlord, and, according to TeraWulf, a Fluidstack-led group has since bought the rest. The rent services a $1.3B bond, and Google's guarantee reaches that debt only through the lease. The notes deck warns that a termination fee may fall short of repaying bondholders.
Tap a figure for the line in its source.
Fluidstack gives
TeraWulf gives Fluidstack
- of data-center capacity at Abernathy, Texas; landlord venture formed 50.1% TeraWulf, 49.9% Fluidstack — TeraWulf says it has since sold its half
Google gives TeraWulf
- guarantee of the rent, shrinking over the first 10 years; no TeraWulf taken
What happened
In October 2025, TeraWulf and Fluidstack formed a joint venture to build a 168-megawatt data center in Abernathy, Texas. The venture leased the whole building to a Fluidstack subsidiary for 25 years, with about $9.5 billion in rent. TeraWulf paid $450 million for 50.1% of the venture. A Fluidstack affiliate held the other 49.9%, so Fluidstack was effectively paying some of the rent to itself. The venture borrowed $1.3 billion in the bond market. Google agreed to cover $1.3 billion of the rent if Fluidstack defaults. Google took no , which are rights to buy shares, in TeraWulf. Fluidstack gave Google warrants for up to about 7.8 million Fluidstack shares, which Google pledged to the bondholders during construction. In July 2026, TeraWulf agreed to sell its stake to a Fluidstack-led group for about $530 million. The purchase price is payable in three instalments through April 2027. TeraWulf's quarterly reports say the sale took effect when the parties signed in July. They say TeraWulf no longer holds any ownership stake in the venture. The November 6 report adds that TeraWulf received the first $250 million in July. The filing says the buyers' promise to pay the rest is guaranteed and backed by a pledge of ownership stakes in the venture. The filing doesn't say whose stakes were pledged. The tenant's side now owns its landlord. Fluidstack's lawyers describe the end user only as a global AI platform building frontier models. Nobody names it.
Sources 14 documents — 13 SEC filings · 1 law-firm note
Research trail Found 854 documents and read 576 of them while checking this deal and related ones.
- States 5 figures: lease term · $450M terawulf investment · $250M sale completed · $280M deferred consideration · 50.1% buyers
- States 4 figures: 168 MW leased capacity · $9.5B contract value · $1.3B google backstop · 49.9% JV ownership
- States 240 MW gross capacity
- States no warrants
- States google warrants
- States $1300M termination fee
- States $1.3B JV notes
- States $530M sale price
- States 168 MW end user as described
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: TeraWulf 8-Ks Oct 28 2025 (Item 1.01; release furnished), Dec 18 (deck, furnished) and Dec 29 2025, Jul 6 2026; FY-2025 10-K (+ ex-10.32) and Q2-2026 10-Q; Cooley (Oct 28 2025) (read 2026-09); TeraWulf Q3-2026 release and investor update, furnished (2026-11-06) (updated 2026-11-06); TeraWulf Q3-2026 10-Q (2026-11-06) (updated 2026-11-08) · as of Nov 2026
The evidence 16 sourced figures · 4 disputes
The record's headline TeraWulf–Fluidstack JV, Abernathy TX: 168 of critical IT leased to Fluidstack for 25 years, ~$9.5B — Google $1.3B, with on Fluidstack, none on TeraWulf; the tenant co-owned its landlord (49.9%) from the start, and in July 2026 a Fluidstack-led group agreed to buy TeraWulf's 50.1% for ~$530M — completed in the third quarter, TeraWulf says
- Size
- ~$9.5B over 25 years · 168 MW critical IT (240 MW gross) · Google backstop $1.3B, with warrants on Fluidstack, none on TeraWulf · $1.3B 7.25% JV notes · TeraWulf's 50.1% sold for ~$530M (agreed Jul 2026, completed Q3 2026)
- When
- Oct 28 2025 JV + lease + backstop → Dec 29 2025 $1.3B notes → Jul 5–6 2026 TeraWulf exit agreed and effective (announced Jul 6) → Jul 2026 $250M paid → Dec 31 2026 $150M due → Apr 30 2027 last instalment, or earlier if the campus starts operations; 25-yr lease from delivery
- Status
- JV formed Oct 2025; $1.3B notes closed Dec 29 2025; not yet operating (Q3-2026 10-Q: 'has not yet commenced operations'); TeraWulf agreed in early July 2026 (its Q3 10-Q says Jul 5; announced Jul 6) to sell its 50.1% for ~$530M, in three instalments, and says the sale took effect then — $250M received in July, $150M due by Dec 31 2026 and ~$130M by the earlier of the campus starting operations and Apr 30 2027, the buyers' obligations guaranteed and secured by pledged JV interests (Q3-2026 10-Q, Nov 6 2026)
- Structure
- a joint venture as landlord: FS CS I LLC — formed 50.1% Big Country Wulf LLC (TeraWulf) / 49.9% Fluidstack CS I Inc., TeraWulf's half since sold by its own account — owns Flash Compute LLC (the notes issuer) and the landlord FS AB LLC; the campus is fully pre-leased to Fluidstack USA III for 25 years with rent escalators and term-contraction options. Google backstops the lease under a Recognition Agreement: $1.3B, amortizing over 10 years from rent commencement; on default it may terminate the lease and pay a termination fee, or pay the rent due and assume the lease 'at a discounted rent rate'. No TeraWulf equity or warrants were issued; Fluidstack issued Google warrants on its own shares, relating to the project (google-warrants). The tenant's parent owned 49.9% of its landlord from formation — a related-party loop that the Jul 2026 sale deepens
- Programme
- Fluidstack leases, Google backstop
- Parties
- Fluidstack tenant (Fluidstack USA III) AND 49.9% owner of the landlord JV (Fluidstack CS I Inc.) — then lead of the group that bought the other 50.1% · TeraWulf 50.1% JV member (Big Country Wulf LLC) and developer until it sold the stake (agreed and effective Jul 5 2026 by its Q3 10-Q, announced Jul 6; completed in Q3 2026); paid $450.0M for its stake · Google backstop provider ($1.3B) — warrants for up to 7,786,250 Fluidstack shares under a Sep 26 2025 Warrant Agreement 'relating to the Project'; no TeraWulf warrants or equity; not a lease party
- Record
- disclosed / primary source · as of Nov 2026
Flows 4 as the record states them
- Fluidstack → TeraWulflease-payments~$9.5B contracted over the 25-year lease (~$380M a year on average) — paid to the JV landlord, of which TeraWulf held 50.1% and Fluidstack's own affiliate 49.9%; rent from delivery. No ribbon is drawn: the landlord is the JV, not TeraWulf, and TeraWulf has since sold its stake (completed Q3 2026)
- TeraWulf → Fluidstackcapacity168 MW critical IT (240 MW gross) — the site's full build-out: a 29.3-acre parcel, one building of over 637,000 sq ft
- Google → TeraWulfguarantee$1.3B backstop of Fluidstack's lease obligations to the JV landlord, amortizing over 10 years from rent commencement; no TeraWulf warrants (Google's warrants are Fluidstack's: google-warrants)
- Fluidstack → TeraWulfstake-purchase~$530M for TeraWulf's entire 50.1% — the Fluidstack member 'and certain other purchasers' (a 'Fluidstack-led investor group'; members and resulting stakes undisclosed): $250M within 14 days (received in July 2026), $150M by Dec 31 2026, ~$130M by the earlier of the campus starting operations and Apr 30 2027, the buyers' obligations guaranteed and secured by pledged JV interests — completed in Q3 2026 (TeraWulf's Q3 10-Q, filed Nov 6 2026; its release said the same, furnished)
Resolved figures 16 each with the verbatim line from its document
- leased-capacity168 MW168 MW of critical IT to Fluidstack — the full build-out of the site (240 MW gross), the tenant being Fluidstack USA III per the 10-K
“Under the Abernathy Datacenter Lease, the Joint Venture will provide Fluidstack with a total of 168 MW of critical IT load for high-performance computing (“HPC”) data center operations at the Abernathy HPC Campus.”
TeraWulf 8-K Item 1.01 (filed 2025-10-28) · sec.gov - gross-capacity240 MW240 MW gross for 168 MW critical IT (~1.43 gross-to-IT), fully pre-leased and 'backstopped by Google's credit support'
“The Abernathy HPC Campus is designed to support HPC and AI workloads, with a total gross capacity of 240 MW and a critical IT load of 168 MW, fully pre-leased to Fluidstack USA III and backstopped by Google’s credit support.”
TeraWulf FY-2025 10-K · sec.gov - lease-term25 years25 years with built-in escalators and options for term contraction — the release's footnote says the term 'may be shortened to 20 years or 15 years pursuant to certain contractual options' (furnished; whose option, and at what price, unfiled — see contested). The Q3-2026 10-Q repeats the 25 years with 'contractual rent escalators and options for term contraction', but calls the paper a 'sublease' (the 10-K and the Oct-28 8-K said 'lease') and names only 'Fluidstack' as tenant, not the entity (Fluidstack USA III) the 10-K named — wording, not a stated change, and nothing in it says who holds the contraction options
“The campus is 100% pre-leased to Fluidstack under a 25-year data center sublease with contractual rent escalators and options for term contraction.”
TeraWulf Q3-2026 10-Q, MD&A — Abernathy Joint Venture · sec.gov - contract-value$9.5B~$9.5B of contracted revenue to the JV over 25 years (~$380M a year on average; ~$260M average annual NOI, ~70% margin — deck projections, furnished). In the FILED 8-K — unlike Lake Mariner's figures
“The contracted 25-year revenue to the Joint Venture is expected to total approximately $9.5 billion.”
TeraWulf 8-K Item 1.01 (filed 2025-10-28) · sec.gov - google-backstop$1.3B$1.3B, amortizing over 10 years from rent commencement — so the guarantee runs off over the first ten of twenty-five years. On default Google may terminate the lease and pay a termination fee, or pay the rent due and assume the lease 'at a discounted rent rate'. The FS AB / Fluidstack USA III / Google Recognition Agreement is filed as a form (10-K ex-10.32, dated Sep 26 2025)
“The Datacenter Google Backstop totals $1.3 billion, commences amortization upon the rent commencement date under the Abernathy Datacenter Lease, and amortizes over 10 years.”
TeraWulf 8-K Item 1.01 (filed 2025-10-28) · sec.gov - no-warrantsthe landlord's own statement that no TeraWulf equity or warrants were issued here. It covers TeraWulf's shares only: Google did take warrants for this project, on the tenant's parent, Fluidstack (google-warrants). The difference from Lake Mariner and Barber Lake is whose shares — there the landlord's, here the tenant's. Furnished release
“No TeraWulf equity securities or warrants were issued in connection with this transaction.”
TeraWulf release, Oct 28 2025 (8-K ex-99.1, furnished) · sec.gov - google-warrants7,786,250Google holds warrants on the tenant's side, not the landlord's: the Abernathy notes indenture defines the 'Warrant Agreement, dated as of September 26, 2025, by and between Fluidstack and Google, relating to the Project', and the Warrants as 'warrants issued by Fluidstack to Google' for up to 7,786,250 shares of Fluidstack's common stock. Google pledged them to the noteholders while the campus is built: the Warrants are collateral 'solely during the Construction Period', and the lien on 'the Warrants pledged by Google' is released at the Commencement Date. The indenture gives no exercise price or value
“means all of the warrants issued by Fluidstack to Google pursuant to the Warrant Agreement constituting, in the aggregate, warrants to purchase up to a total of 7,786,250 shares of Fluidstack’s common stock, par value $0.001 per share.”
Flash Compute LLC notes indenture (TeraWulf 8-K ex-4.1, Dec 29 2025) — definitions · sec.gov - termination-fee$1300Mthe backstop and the lease's termination fee are one number by the deck's own definition: its schedule 'FS Termination Fee Paid by Google (Assumes an Early Termination)' opens at an 'Initial FS Termination Fee' of $1,300M, amortizing from lease commencement, and its footnote reads 'Google Backstop Outstanding represents the maximum amount of the FS Termination Fee available' — the proceeds being the lesser of the notes outstanding and the scheduled fee. The filed 8-K gives Google the option to 'terminate … and pay a termination fee' but no amount. Furnished deck
“Initial FS Termination Fee 1,300”
TeraWulf 8-K ex-99.1, Dec 18 2025 (notes marketing deck, furnished) · sec.gov - jv-ownership49.9%TeraWulf 50.1% / Fluidstack 49.9% from formation — the tenant's parent owned half its landlord. TeraWulf could have gone to 51% for up to $50.0M more by Dec 31 2025 and did not; the release's 'majority stake of 51%' is that cap, not the holding
“Pursuant to the terms of the Joint Venture Agreement, the Fluidstack Member and the TeraWulf Member will be the sole initial members of the Joint Venture, with TeraWulf Member owning 50.1% of the equity interests of the Joint Venture and the Fluidstack Member owning 49.9% of the equity interests as of the date hereof.”
TeraWulf 8-K Item 1.01 (filed 2025-10-28) · sec.gov - terawulf-investment$450M$450.0M cash for 50.1%, funded by TeraWulf's $1.025B 0.00% converts due 2032 (Q3-2025 release)
“Prior to the sale described below, the Company had paid $450.0 million in cash for 50.1% of the Abernathy Joint Venture and had not purchased any additional membership interests pursuant to the Contribution Agreement.”
TeraWulf Q3-2026 10-Q, Note 11 — Joint Venture · sec.gov - jv-notes$1.3B$1.3B 7.250% senior secured notes due 2030 at Flash Compute LLC, closed Dec 29 2025; the Dec-18 deck's '$1.275Bn' was a pre-pricing assumption. Proceeds fund construction, reserves and $75.0M of LC cash collateral. Like Lake Mariner's notes, due 2030 — inside the backstop's 10-year amortization and far inside the 25-year lease
“The aggregate principal amount of notes sold in the offering was $1.3 billion.”
TeraWulf 8-K Items 1.01/2.03 (filed 2025-12-29) · sec.gov - sale-price$530M~$530M for TeraWulf's 50.1%, in three instalments; TeraWulf calls it a ~20% IRR on its $450M. siliconangle's '$450M' is the invested capital, not the price. The Q3-2026 10-Q (Note 11) restates the price and the three instalments with two changes of detail: the agreement is dated Jul 5 where the Q2 10-Q said Jul 6 (see contested: sale-date), and the third instalment is 'due on or before the earlier of the date the Abernathy HPC Campus commences operations and April 30, 2027' — the 8-K's flat 'on or before April 30, 2027' is now the latest date, not the only one
“The aggregate consideration payable to the TeraWulf Member in the Transaction is approximately $530 million, payable in three installments: (i) $250 million within 14 days following execution of the Purchase Agreement, (ii) $150 million on or before December 31, 2026, and (iii) approximately $130 million, subject to certain adjustments, on or before April 30, 2027.”
TeraWulf 8-K Item 8.01 (filed 2026-07-06) · sec.gov - sale-completed$250Mthe sale has closed, on TeraWulf's own filed account: the Q2-2026 10-Q (Aug 5) already read 'The sale was effective as of July 6, 2026 … As a result of the transaction, the TeraWulf Member no longer holds any equity interest in the Abernathy Joint Venture', so the sale took effect when it was signed, with part of the price deferred; the Nov-6 release and deck (furnished) then called it 'Completed' for the quarter. The Q3-2026 10-Q (Nov 6, Note 11) repeats it with another date and four new facts: the sale 'was effective as of July 5, 2026'; $250.0M of the ~$530M 'was received in July 2026'; the $150.0M due by Dec 31 2026 and the ~$130.0M due 'on or before the earlier of the date the Abernathy HPC Campus commences operations and April 30, 2027' (sale-price) are guaranteed and secured (deferred-consideration); and the books show a $423.6M equity-method investment derecognized against a $95.0M gain on the sale, net of transaction costs. Its balance sheet carries 'Receivable for sale of equity in net assets of investee' at $272.8M at Sep 30 (the unpaid instalments), and 'Equity in net assets of investee' ($446.0M at Dec 31 2025) is gone. The release and deck add a '~20% IRR' on the venture investment and the stake sold 'prior to project completion'. So the 50.1% TeraWulf held is no longer its own; who holds it is still not said (landlord-after-the-sale). The price and the schedule are unchanged but for the third instalment's earlier trigger: what the Q3 10-Q adds to the Jul-6 8-K is the payment (the first $250M, in July), the security, and that trigger
“The sale was effective as of July 5, 2026. The consideration is payable in three installments: $250.0 million within 14 days following the effective date which was received in July 2026; $150.0 million on or before December 31, 2026; and approximately $130.0 million due on or before the earlier of the date the Abernathy HPC Campus commences operations and April 30, 2027. As a result of the transaction, the TeraWulf Member no longer holds any equity interest in the Abernathy Joint Venture.”
TeraWulf Q3-2026 10-Q, Note 11 — Joint Venture · sec.gov - deferred-consideration$280Mwhat the buyers still owe and what backs it: the $150.0M and ~$130.0M instalments are a $280.0M receivable on TeraWulf's books, first recognized at a $268.6M present value (a 6.7% effective annual rate) and carried at $272.8M at Sep 30, with $4.1M of interest income accreted in the quarter. The buyers' payment obligations are 'guaranteed by their respective guarantors' — unnamed — 'and secured by pledged membership interests in the Abernathy Joint Venture'. Whose interests, the filing does not say: the Fluidstack Member held 49.9% from formation (jv-ownership), so they could be that stake, the 50.1% sold, or both. The Jul-6 8-K and the Nov-6 release said nothing of guarantors or a pledge; the third instalment's trigger (the earlier of the campus starting operations and Apr 30 2027) is also first in this 10-Q
“The Purchasers’ payment obligations are guaranteed by their respective guarantors and secured by pledged membership interests in the Abernathy Joint Venture. The deferred consideration receivable of $280.0 million was initially recognized at present value of $268.6 million, determined using a discounted cash flow method and an effective annual interest rate of 6.7% recorded in receivable for sale of equity in net assets of investee.”
TeraWulf Q3-2026 10-Q, Note 11 — Joint Venture · sec.gov - buyers50.1%the buyers: 'the Fluidstack Member and certain other purchasers' — the release says 'an investor group led by its joint venture partner, Fluidstack'. Who else, and what share of the landlord Fluidstack ends up with, is undisclosed — the Q3-2026 10-Q repeats the same words and adds only that the buyers have guarantors, unnamed (deferred-consideration); the direction is not undisclosed: the tenant's side bought its landlord (the sale took effect in July 2026, sale-completed). The Q2 10-Q's version of this sentence reads 'On July 6, 2026' (see contested: sale-date)
“On July 5, 2026, the TeraWulf Member entered into a Membership Interest Purchase Agreement (the “Purchase Agreement”) with the Fluidstack Member and certain other purchasers (collectively, the “Purchasers”) to sell to the Purchasers all of the TeraWulf Member’s 50.1% membership interest in the Abernathy Joint Venture for aggregate cash consideration of approximately $530.0 million.”
TeraWulf Q3-2026 10-Q, Note 11 — Joint Venture · sec.gov - end-user-as-described168 MWthe only description of the end user by anyone on the deal's side — Fluidstack's own counsel: 'a global hyperscale AI platform developing frontier-scale foundation models', unnamed. Anthropic fits; so would others. No TeraWulf filing names a lab (tier 2: counsel's release)
“Under the agreement, the parties will develop and deliver 168 megawatts (MW) of critical IT load at the Abernathy, Texas, campus, serving workloads for a global hyperscale AI platform developing frontier-scale foundation models, backed by an investment-grade, long-duration infrastructure commitment through Fluidstack’s platform.”
Cooley (Fluidstack's counsel), Oct 28 2025 · cooley.com
Contested figures 4 not reconciled — every position side by side, with its source and tier
Scope note what this record leaves to other records
NOT this record: Lake Mariner (fs-terawulf-lake-mariner) — the Q3-2025 '$4.5Bn' of Google backstops = $3.2B there + $1.3B here, and '$16.2Bn' of leases = $6.7B + $9.5B at 100% (TeraWulf's '$12.8B' counts only 50.1% of this lease); Hawesville (anth-terawulf-hawesville) — same Jul-6 8-K, other item. TeraWulf's 'up to 51% of the next Fluidstack-led ~168 MW project' (Cooley; '200 MW' in the Q3 release) is a right, not a lease; the site's 'potential expansion to 600 MW' is unleased. JV financials in TeraWulf's noteholder schedules (equity-method carrying value $446.0M at FYE25; Flash Compute's member contributions $798.2M, PP&E $781.8M at Q2-2026) sit in tables stated in thousands, so they are context here, not figures with a quote of their own. The $1.35B lump-sum EPC contract (Q4-2025 call) and JV Partners Holdco's capped completion guarantee (up to $100M to Flash Compute; 'not a guarantee of the notes' — Dec-29 8-K) are construction terms, not rent.