Why it matters
Stargate's overseas model puts a sovereign in charge of building and paying, with the lab operating the site. No document on file gives a cost figure from the owner. The draft chip figure that made headlines was an order of magnitude above what was licensed.
Tap a figure for the line in its source.
G42 gives OpenAI
- data-center cluster that G42 builds and pays for, for OpenAI and Oracle to operate
Nvidia gives G42
- top-end Nvidia chips (GB300s, or the equivalent) the US cleared G42 to buy — an approval, not deliveries
What happened
Abu Dhabi's state-backed G42 is building and paying for OpenAI's first big overseas build, a one-gigawatt data-center cluster. Khazna, G42's data-center company, leads the work, and the investment firm MGX says it backs the build through its minority stake in Khazna. OpenAI and Oracle will operate it. The cluster is part of a planned five-gigawatt 'UAE–US AI Campus'. Washington approved chip exports equivalent to up to 35,000 top-end Nvidia chips in November 2025. That is a fraction of the half-million a year that made headlines. No company in the deal has disclosed the cost. The figures that drew attention range from $20 billion to a UAE minister's 'more than $30 billion'. None comes from a filing.
Sources 15 documents — 6 company releases · 4 government statements · 2 other documents · 1 regulatory filing · 1 research note · 1 transcript
Research trail Found 458 documents and read 434 of them while checking this deal and related ones.
- States 1 GW cluster capacity
- States developer
- States mgx via khazna
- States 5 GW campus capacity (for context)
- States 200 MW first tranche announced
- States chips licensed
- States construction budget contractor side
- States 2 GW grid commitment
- States $1400B US UAE framework (for context)
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- milkeninstitute.org: Michaelmilkenconversationhisexcellencykhaldoonkhalifaalmubarak transcript mea25Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: consortium releases 5/2025 + Commerce 11/2025 + ALEC prospectus + TAQA IR25 (read 2026-08); G42 10/2025, MGX 12/2025 and Khazna 3/2025 releases (developer, MGX's route); Milken MEA25 transcript 12/2025 · as of Aug 2026
The evidence 7 sourced figures · 6 disputes · 2 for context
The record's headline Stargate UAE: G42 builds a 1 cluster for OpenAI inside a 5 GW sovereign campus
- Size
- 1 GW cluster / 5 GW campus
- When
- May 2025 → first tranche targeted 2026
- Status
- under construction
- Structure
- sovereign build-operate JV
- Programme
- Stargate
- Parties
- G42 builder — 'will be built by G42'; no filing names the owner · Khazna developer, a G42 company — 'being developed by Khazna Data Centers' (G42, Oct 2025) · OpenAI operator + tenant · Oracle co-operator · Nvidia silicon · Cisco networking · SoftBank consortium partner · MGX Stargate LLC funder (US-side reciprocal); in the UAE, backs this build-out 'through its investment in Khazna' (MGX, Dec 2025), a minority stake
- Site
- Stargate UAE
- Record
- disclosed / primary source · as of Aug 2026
Resolved figures 7 each with the verbatim line from its document
- cluster-capacity1 GW1 GW compute cluster — the one number with genuine multi-party tier-1 corroboration: the same sentence is signed by OpenAI, SoftBank, G42 and Cisco (one coordinated press kit, but four parties each bearing liability for it), and restated by US Commerce and ALEC's prospectus
“Stargate UAE, a 1-gigawatt compute cluster, will be built by G42 and operated by OpenAI and Oracle.”
SoftBank Group release 5/22/2025 · group.softbank - developerKhazna Data Centers, G42's data-center company, develops the cluster: G42's Oct 2025 construction update calls Stargate UAE a cluster 'being developed by Khazna Data Centers, a G42 company', which 'has moved rapidly from design to construction under Khazna's leadership'. So the launch releases' 'will be built by G42' holds at group level (ALEC's pre-construction 'Stargate Agreement' is with G42). The update names no owner and gives no cost
“G42 today announced major progress on the construction of Stargate UAE, a 1GW large-scale AI infrastructure cluster being developed by Khazna Data Centers, a G42 company, within the 5GW UAE–U.S. AI Campus in Abu Dhabi.”
G42 release via PR Newswire (Oct 16 2025) · prnewswire.com - mgx-via-khaznaMGX's route into the UAE build: reviewing its AI-infrastructure portfolio, MGX's Dec 2025 board release says 'MGX is supporting the build-out of Stargate UAE through its investment in Khazna'. That investment is a minority stake: Khazna's Mar 2025 release welcomes 'MGX and Silver Lake as new minority shareholders, alongside majority shareholder G42', and adds that 'as part of this transition, e& has exited from its investment in Khazna' (e&'s sale is khazna-eand). Neither release gives MGX's share, what it paid, or how much of the build its money funds
“In the UAE, MGX is supporting the build-out of Stargate UAE through its investment in Khazna.”
MGX board-meeting release (Dec 2025); Khazna release (Mar 26 2025) · mgx.ae - first-tranche-announced200 MW200 MW expected live in 2026 — the ANNOUNCED first tranche. Well-attested as an announcement, but it is ONE coordinated launch release echoed by ~25 downstream documents, and four later official statements diverge from it (see contested phase-1-capacity). ALEC's backlog table carries 2027 as the Stargate Data Centre completion year
“A 1GW Stargate UAE cluster in Abu Dhabi with 200MW expected to go live in 2026”
OpenAI announcement 5/22/2025 (Wayback) · web.archive.org - chips-licensed35,00035,000 GB300-equivalents approved for export to G42, Nov 2025 — the only chip-count authorization in the record (an approval ceiling, not delivery). Since Jul 10 2026 a BIS rule makes G42 and Core42 approved recipients of advanced computing items 'license-free', with no chip count, an authorization that 'shall automatically expire on April 6, 2027' absent BIS notice (Federal Register 2026-14132). Same-size approval to Saudi's Humain in the same statement — the two 35,000s are per-company, don't sum to a UAE figure. Commerce names the companies, not this cluster: the tie to this site is a remark on stage, Khaldoon Al Mubarak's at the Milken Institute's MEA25 conference (Dec 2025 transcript) — 'we have about 35,000 GP 300 chips coming into this facility'. Order of magnitude BELOW the 500k/yr framework headline — see contested
“Both companies are receiving approvals to purchase the equivalent of up to 35,000 Nvidia Blackwell chips (GB300s).”
US Commerce statement 11/2025 (Wayback); BIS rule, Federal Register 2026-14132 (Jul 2026) · web.archive.org - construction-budget-contractor-sideAED 5.2 billion (ex-VAT) construction budget for the 200 MW SG1 build, set in the G42–ALEC Stargate Agreement — the ONLY tier-1 cost datum in 296 documents, and it is contractor-side (a slice of project cost, not project cost). Nearby figures from the same issuer are different objects: AED 5,261M = backlog-table awarded value, AED 4,535M = remaining FY25 backlog, AED 37.3M = pre-construction services award only. Beware the same document's UNRELATED 'AED 5.2 billion' (One Za'abeel project value)
“The parties have set a budget of AED 5.2 billion (exclusive of VAT) for the subsequent construction works.”
ALEC Holdings IPO prospectus (Sep 2025) · cdn.prod.website-files.com - grid-commitment2 GWTAQA is building transmission for 2 GW of demand to Project Stargate UAE — 14 substations, >400 km of cable, plus a 47 MIGD water scheme. The best independent physical check on the project's reality: a listed utility's committed capital, not a press release. 2 GW grid vs 1 GW IT load is facility overhead, not a conflict. One document (Integrated Report 2025) on two mirror hosts — one source
“Developing the power transmission infrastructure required for 2GW demand to Project Stargate UAE, including the construction of 14 power substations with over 400 km of cables and overhead lines”
TAQA Integrated Report 2025 · static.mubasher.info
Contested figures 7 not reconciled — every position side by side, with its source and tier
For context, not this deal's figures 2 kept beside the deal so they are not mistaken for its numbers
- campus-capacity5 GW5 GW UAE–US AI Campus — the umbrella the 1 GW cluster sits inside; four institutionally distinct tier-1 originators (UAE gov, US Commerce, G42, UAE embassy). NOT the Stargate UAE capacity — summing 1+5 or quoting 5 as the cluster is the standing merge hazard
“a new 5GW UAE-US AI Campus, the largest AI infrastructure project outside the U.S., was unveiled.”
G42 consortium release 5/15/2025 · g42.ai - us-uae-framework$1400B$1.4T over 10 years — the UAE's investment framework the campus sits under (both sovereigns state it; a pledge, not a commitment schedule). The $200B+ of deals announced at the May-2025 visit is framed as NEW and separate — do not add them. PIIE's $1.6T is an internal contradiction in one brief, not an independent high estimate
“build on the UAE’s landmark commitment to a 10-year, $1.4 trillion investment framework that will contribute to the U.S. boom in AI infrastructure, semiconductors, energy, quantum computing, biotechnology, and manufacturing.”
White House fact sheet 5/2025 · whitehouse.gov
Scope note what this record leaves to other records
construction is real: ALEC under contract (AED 37.3M pre-construction + AED 5.2B budget), TAQA building 2GW transmission + 47 MIGD water, Al Dhafra 1 GW OCGT (AED 3.6B) and Masdar 5.2 GW solar + 19 GWh BESS ($6.1B, 1 GW baseload) explicitly tied to data-centre demand; 7,000 workers/100 cranes and ~250 MW/quarter build RATE (G42 CEO, 10/2025); first Nvidia racks reported arrived May 2026, volume undisclosed. Economics entirely absent: no equity split, no financing, no offtake/PPA for the cluster itself — in contrast to the fully-documented power layer. G42 side deals (Microsoft $1.5B, Cerebras, TeraWulf) live on the g42 entity; MGX fund facts on mgx. Quarantined upstream: Wood Mackenzie's '$1.5B Microsoft Stargate JV' (welds Microsoft's 2024 G42 equity onto the 2025 OpenAI announcement — passes citation-verification, still wrong)