Why it matters
OpenAI says the computing capacity Tata Consultancy Services (TCS) plans to build in India is 'designed for data residency'. What the two have published is a shape, not a contract, with no price, term, site or start date. TCS's CEO describes a model in which TCS supplies the building and its 'passive components' and the tenant brings the computers; no document says this is OpenAI's arrangement, or who pays for the computers inside.
Tap a figure for the line in its source.
TCS HyperVault gives OpenAI
- of AI data-center capacity in India in the initial phase, which TCS 'will develop' — no site, start date or price stated
- if the partnership scales: 'an option to scale to 1 ' in Tata's release, 'potential to scale to 1 gigawatt over time' in OpenAI's — no terms, trigger or timetable published
OpenAI gives TCS HyperVault
- payment for the capacity under 'a multi-year partnership' — no price, rent, term, minimum or contract value in any document on file
What happened
In February 2026, at an AI summit in Delhi, OpenAI and India's Tata group announced that OpenAI will be the first customer of HyperVault, the data-center business that Tata Consultancy Services (TCS), India's largest IT-services company, set up in 2025. TCS is to build 100 megawatts of AI data-center capacity in India to start, with an option to grow to a gigawatt. OpenAI says that capacity will let its models run inside the country for customers whose data must stay there. Neither company has said what OpenAI will pay, for how long, where the capacity will be or when it will be ready. TCS's executives have since called it 'committed capacity' and said that HyperVault creates capacity 'once the contract comes in' — the second remark naming no customer. The same announcement covered other ties between the two, Tata staff using ChatGPT Enterprise and TCS using OpenAI's Codex, which run the other way and are not this record.
Sources 20 documents — 16 other documents · 2 press reports · 1 company release · 1 government statement
Research trail Found 127 documents and read 124 of them while checking this deal and related ones.
- States 3 figures: 100 MW initial capacity · 1 GW scale option · partnership scope
- States 2 figures: 100 MW first customer · data residency
- States 100 MW committed
- States 100 MW restated
- States operating model
- States 1 GW hypervault programme
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
- Cited by the record; no single figure is quoted from it.
The record's own summary of its sourcing: Tata Group/TCS release (Feb 19 2026; filed with NSE the same day); OpenAI, 'Introducing OpenAI for India' (Feb 18 2026, Wayback Oct 26 2026); Tata Sons chairman's summit address (Feb 2026); TCS call transcripts as filed (Oct 9 2025, Apr 9 2026, Oct 8 2026), Q2 FY26 release (Oct 9 2025), annual report FY2026 and Hyderabad release (Sep 5 2026); Telangana government release (Sep 5 2026); Economic Times (Dec 4 2025, Jul 21 2026); Moneycontrol (Jan 21 2026); Business Standard/Bloomberg (Mar 5 2026); ICICI Securities (Apr 1 2026); Times of India (Sep 6 2026); DCD (Jul 22 2026, Wayback); Business Scanner (Nov 12 2026) — read 2026-11 · as of Oct 2026
The evidence 9 sourced figures · 4 disputes
The record's headline OpenAI–TCS HyperVault, India: OpenAI to be the first customer of TCS's new data-center business — 100 in an initial phase and an option to scale to 1 , under a multi-year partnership announced in February 2026, with no price, term, site or start date published
- Size
- 100 MW in the initial phase · an option to scale to 1 GW (OpenAI: 'potential to scale … over time') · no price, term, site or start date in any document
- When
- Oct 9 2025 (TCS launches HyperVault to build 1 GW) → Dec 4 2025 (talks reported: at least 500 MW under negotiation, per The Economic Times) → Jan 21 2026 (Moneycontrol: OpenAI and AWS likely anchor tenants for a planned Navi Mumbai facility) → Feb 18–19 2026 (announced at the India AI Impact Summit: OpenAI's page, then Tata's and TCS's release, filed with India's exchanges) → Apr 9 2026 (TCS's COO: 'committed capacity of 100 MW') → Jul 21 2026 (The Economic Times: land in Vizag and Pune could host it) → Sep 5 2026 (HyperVault's Hyderabad campus announced, OpenAI representatives at the meeting) → Oct 8 2026 (TCS's CFO: capacity created 'once the contract comes in', no customer named) → no start date stated
- Status
- announced, not built — no site, construction start or delivery date for OpenAI's capacity in any document to Nov 2026. TCS's annual report (May 2026) restates the release (restated); in October its CFO said HyperVault plans capacity 'once the contract comes in', naming no customer (firmness). HyperVault has since secured land in Hyderabad and won an auction for land near Pune (hypervault); no document ties either to OpenAI (site)
- Structure
- a multi-year infrastructure partnership — HyperVault, TCS's AI data-center subsidiary, develops capacity in India and OpenAI is its first customer — inside a wider Tata–OpenAI partnership announced the same day (partnership-scope). OpenAI files it under its Stargate initiative and 'OpenAI for India'; Tata's release does not use the word Stargate. HyperVault's model, as TCS describes it, is to supply the building and its 'passive components' while the tenant brings its own computers (operating-model). No lease, term sheet or contract is public, and no document shows OpenAI paying in advance, taking equity in HyperVault or financing it. TPG has held 49% of HyperVault on a fully diluted basis since Mar 9 2026 (hypervault)
- Programme
- Stargate
- Parties
- OpenAI customer — HyperVault's first, 'beginning with 100 megawatts', under its Stargate initiative and 'OpenAI for India', for capacity 'designed for data residency, security, and long-term domestic capability'. No payment, equity or financing from OpenAI on file; a pre-announcement report said no equity was planned 'at this juncture' (negotiated-size) · TCS HyperVault developer and landlord — TCS's AI data-center subsidiary, which 'will develop' the capacity; TCS filed the joint release with India's stock exchanges. TPG holds 49% of it, fully diluted, since Mar 9 2026
- Record
- disclosed / primary source · as of Oct 2026
Flows 2 as the record states them
- TCS HyperVault → OpenAIcapacityAI data-center capacity in India that TCS 'will develop' — 100 MW in the initial phase, with an option (OpenAI: 'potential') to scale to 1 GW; under HyperVault's model as TCS's CEO describes it, the building and its 'passive components' (racks, connectivity, power and cooling, in Bloomberg's account of an interview with him), with the tenant's own computers inside — no site, start date, or IT-load-versus-grid basis stated
- OpenAI → TCS HyperVaultpaymentpayment for the capacity under 'a multi-year partnership' — no price, rent, term, minimum or total in any document on file, so no ribbon is drawn
Resolved figures 9 each with the verbatim line from its document
- initial-capacity100 MW100 MW in the initial phase — the joint release of the Tata group, TCS and OpenAI (Mumbai, Feb 19 2026; TCS filed it with India's stock exchanges the same day): 'TCS’ HyperVault unit and OpenAI have agreed to a multi-year partnership to develop AI infrastructure in India.' The capacity is to be built ('TCS will develop'), and the release names no site, start date or price, gives no length for 'multi-year', and does not say whether the 100 MW is IT load or power drawn from the grid
“In the initial phase, TCS will develop AI infrastructure with 100MW capacity, with an option to scale to 1 GW.”
Tata Group/TCS release (Feb 19 2026) · tata.com - first-customer100 MWthe buyer's account of the same 100 MW: OpenAI is to be the first customer of HyperVault, 'beginning with 100 megawatts of capacity', announced on its page of Feb 18 2026 'at the India AI Impact Summit 2026 in Delhi'. openai.com refuses automated readers, so this is the Internet Archive's copy of Oct 26 2026, eight months after posting: a later edit to the page cannot be ruled out
“OpenAI will become the first customer of Tata Consultancy Services’ HyperVault data center business, beginning with 100 megawatts of capacity and with potential to scale to 1 gigawatt over time.”
OpenAI, 'Introducing OpenAI for India' (Feb 18 2026; Wayback Oct 26 2026) · web.archive.org - scale-option1 GW1 GW, ten times the first phase — 'an option to scale to 1 GW' in Tata's and TCS's release; OpenAI's page has 'potential to scale to 1 gigawatt over time' (first-customer), and the Tata Sons chairman, announcing it at the summit, 'the first 100MW capacity, which will scale to 1GW' (his address, Feb 2026). No document says who holds the option, what exercising it costs, what triggers it or when, and nothing on file says any of it has been exercised
“TCS’ HyperVault unit and OpenAI have agreed to a multi-year partnership to develop AI infrastructure in India. In the initial phase, TCS will develop AI infrastructure with 100MW capacity, with an option to scale to 1 GW.”
Tata Group/TCS release (Feb 19 2026) · tata.com - committed100 MW'a committed capacity of 100 MW' — TCS's chief operating officer, Aarthi Subramanian, on its results call of Apr 9 2026 (transcript filed with the exchanges Apr 14), the strongest word any party has used for it; the same answer calls the 1 GW 'the opportunity to grow'. Neither the call nor any filing gives the commitment's terms (firmness)
“You saw the announcement that we made with OpenAI, where there is a committed capacity of 100 MW and the opportunity to grow that to 1 GW.”
TCS Q4 FY26 call transcript (Apr 9 2026; filed Apr 14) · nsearchives.nseindia.com - restated100 MWTCS's annual report for FY2026 (to Mar 31 2026; filed with the exchanges May 15 2026) restates the release in nearly its words and adds nothing — no site, start date, price or term
“TCS’ HyperVault and OpenAI have agreed to a multi‑year partnership to develop AI infrastructure in India, with 100 MW capacity in the initial phase, and an option to scale to 1 GW.”
TCS annual report FY2026 (filed May 15 2026) · nsearchives.nseindia.com - data-residencywhy OpenAI says it wants the capacity: in-country computing — 'local, AI-ready data center capacity designed for data residency, security, and long-term domestic capability', so that its 'most advanced models' can 'run securely in India' for 'mission-critical and government workloads' — placed 'As part of our global Stargate initiative'. Tata's release does not use the word Stargate. OpenAI's later launch of in-country processing for its API in India (Nov 12 2026, as Business Scanner reports it) names no data center, HyperVault's or any other
“As part of our global Stargate initiative, OpenAI and Tata Group are partnering to develop local, AI-ready data center capacity designed for data residency, security, and long-term domestic capability.”
OpenAI, 'Introducing OpenAI for India' (Feb 18 2026; Wayback Oct 26 2026) · web.archive.org - operating-modelwhat a HyperVault tenant rents, as TCS's CEO K Krithivasan described the business at its launch (Oct 9 2025 call, transcript filed Oct 15): the building and its 'passive components', the tenant bringing its own computers and storage. Bloomberg's account of an interview with him (via Business Standard, Mar 5 2026): a 1 GW data center typically costs $35–50 billion, which TCS will not bear; TCS helps pay for 'the structure itself, including racks, connectivity, power and cooling', roughly $7–8 billion. No document says this is OpenAI's arrangement in particular, or whose computers will fill the 100 MW
“Our current objective is to provide all passive components. The client whosoever is occupying, they will bring in their compute and storage.”
TCS Q2 FY26 call transcript (Oct 9 2025; filed Oct 15) · nsearchives.nseindia.com - hypervault-programme1 GWwhat the option is measured against: TCS launched HyperVault on Oct 9 2025 to build 1 GW — 'over a period of five to seven years', in phases, its CEO said on the call — so OpenAI's option, exercised in full, is the size of the whole platform as first announced. TCS's later wording is larger and looser ('more than 1 GW of new capacity planned across key locations in India', its HyperVault page), and its Hyderabad campus (Sep 2026) is itself designed for up to 1 GW; no document assigns OpenAI's capacity to any of them (site)
“New business entity to build world class AI infrastructure - 1 GW capacity AI datacenter in India”
TCS Q2 FY26 results release (Oct 9 2025) · tcs.com - partnership-scopethe infrastructure is one strand of a wider partnership announced in the same release. The others are not this record: ChatGPT Enterprise for Tata employees — 'Several thousand Tata Group employees' in Tata's release, but 'starting with hundreds of thousands of TCS employees' in OpenAI's page, counts about a hundredfold apart that no document reconciles — TCS using OpenAI's Codex, joint selling to enterprises and an OpenAI Foundation–TCS programme for Indian youth; OpenAI's page adds its certifications, with TCS the first organization outside the US to take part. No price is published for any of them, and the software purchases run from Tata to OpenAI, the other way from the capacity
“This partnership spans multiple high-impact areas, including powering AI-led innovation across Tata Group companies, joint efforts to drive AI transformation across industries globally, and setting up AI infrastructure.”
Tata Group/TCS release (Feb 19 2026) · tata.com
Contested figures 12 not reconciled — every position side by side, with its source and tier
Scope note what this record leaves to other records
NOT this record (carried elsewhere or not carried): HyperVault's own figures — TPG's stake and the ₹18,000 crore equity commitment, its debt (press-reported only), its 1 GW programme and capex rule beyond the context above, the Hyderabad campus and its grid applications, the Pune land, the AMD Helios collaboration → the hypervault entity, or not carried here. The partnership's other strands (partnership-scope). Not adopted: Gridvik's registry, which calls the 100 MW 'Signed 19 Feb 2026' and ties it to the Hyderabad campus — no primary says either; a LinkedIn post making OpenAI Hyderabad's 'first major client'; Bloomberg's 'at least 100 megawatts' (its paraphrase, Mar 5 2026); the Economic Times' Sep 2025 report of OpenAI talking to unnamed Indian firms and Reliance, which names neither TCS nor HyperVault.